Housing violations · Midwood
1480 Ocean Avenue, Brooklyn
11230 · 45 apartments · 6 stories · City Council district 44
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
9 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster33
- Broken doors or locks22
- Other repairs20
- Leaks and water damage10
- Lead paint4
- Mold3
- Roaches3
- No heat or hot water3
- Mice or rats2
- Missing window guards2
- Missing smoke or CO detector2
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 106 closed · NYC typical: 87 days
from 188 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from northIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19265350
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the kitchenIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19265351
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroomIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19265349
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19265348
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from northIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19265352
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq ft observed at all walls and ceiling in the bathroomIssued Oct 2, 2026 · fix by Oct 28, 2026 overdue · Violation #19265353
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19258199
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tiles at east wall in the bathroomIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19258201
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east at northIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19258200
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in closet in the bathroomIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19238706
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at south wall at public hall, 1st storyIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19238709
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling at compactor closet, 2nd storyIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19238712
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 25, 2026 · fix by Oct 21, 2026 overdue · Violation #19238703
- BOther repairs& 309 m/d law abate the nuisance consisting of fowl odor emanating from all wastelines in the bathroomIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19238705
- BBroken doors or locksProperly repair or replace the broken or defective latch set at entrance door at compactor closet, 2nd storyIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19238711
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the bagged garbage at fire passage wayIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19238716
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage and construction materials at cellarIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19238715
- BOther repairsReplace with new the missing ceramic mosaic floor tiles in the bathroomIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19238707
- COther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Sep 25, 2026 · fix by Oct 1, 2026 overdue · rent impairing · Violation #19238701
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 25, 2026 · fix by Oct 21, 2026 overdue · Violation #19238702
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at compactor room door at cellarIssued Sep 25, 2026 · fix by Oct 9, 2026 overdue · Violation #19238714
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Sep 24, 2026 · fix by Sep 24, 2026 overdue · rent impairing · Violation #19238704
- COther repairsProvide adequate supply of cold water for the fixtures at water closet in the bathroomIssued Sep 16, 2026 · fix by Sep 22, 2026 overdue · rent impairing · Violation #19219762
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Sep 16, 2026 · fix by Sep 16, 2026 overdue · rent impairing · Violation #19219763
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet . in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · rent impairing · Violation #19192927
- BOther repairsRemove all encumbrances consisting of bicycle at public hall, 2nd storyIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · rent impairing · Violation #19192929
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at east wall in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192928
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Aug 14, 2026 · fix by Aug 28, 2026 overdue · Violation #19136978
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Aug 14, 2026 · fix by Sep 9, 2026 overdue · Violation #19136979
- BMoldTrace and repair the source and abate the visible mold condition at, less than 10 sqft , east wall and ceiling in the bathroomIssued Jul 28, 2026 · fix by Sep 1, 2026 overdue · Violation #19111714
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 4th room from northIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19091232
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 4th room from northIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19091234
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 4th room from northIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19091233
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at closet 1 and 2 at ceiling at east wall in the 1st room from northIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19091231
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in closet 1 and 2 at east wall in the 1st room from northIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19091230
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19091228
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroomIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19091229
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19091236
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19091237
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the kitchenIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18853048
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and west wall in the kitchenIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18853047
- CPeeling paint and plasterProperly repair with similar material the broken or defective cracked fire retardant materials plaster at south wall, building 's lobby , at public hall, 1st…Issued Mar 30, 2026 · fix by Apr 5, 2026 overdue · Violation #18744224
- CBroken doors or locksProvide approved one-hour fire resistance rated self-closing door at all openings to public hall, other than apartment main entrance door at vestibule at…Issued Mar 30, 2026 · fix by Apr 13, 2026 overdue · Violation #18753917
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Dec 31, 2025 · fix by Feb 4, 2026 overdue · Violation #18540097
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall and ceiling in the kitchenIssued Dec 31, 2025 · fix by Feb 4, 2026 overdue · Violation #18540099
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Dec 31, 2025 · fix by Feb 4, 2026 overdue · Violation #18540100
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the bathroomIssued Oct 27, 2025 · fix by Dec 1, 2025 overdue · Violation #18318862
- BOther repairsRemove all encumbrances consisting of household items at public hall, 6th storyIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · rent impairing · Violation #18300561
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Aug 29, 2025 · fix by Aug 29, 2025 overdue · rent impairing · Violation #18192237
- COther repairsProperly repair with similar material the broken or defective cracked ceramic floor tiles in the bathroomIssued Jul 28, 2025 · fix by Aug 3, 2025 overdue · Violation #18111953
- BPeeling paint and plasterProperly repair with similar material the broken or defective fire retardant materials, plaster at ceiling at public hall, 6th storyIssued Jul 28, 2025 · fix by Sep 1, 2025 overdue · Violation #18111969
- CBroken doors or locksProvide approved one-hour fire resistance rated self-closing door at all openings to public hall, other than apartment main entrance door at vestibule…Issued Jul 28, 2025 · fix by Aug 11, 2025 overdue · Violation #18111968
- BElectrical problemsProperly secure the loose light fixture at , roof bulkhead , leaving exposed electrical wires , at south wall , at public hall, 6th storyIssued Jul 28, 2025 · fix by Sep 1, 2025 overdue · Violation #18111972
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceilling in the bathroomIssued Apr 25, 2025 · fix by May 1, 2025 overdue · Violation #17848619
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceilling in the bathroomIssued Apr 25, 2025 · fix by May 1, 2025 overdue · Violation #17848618
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at eastIssued Oct 24, 2024 · fix by Oct 30, 2024 overdue · Violation #17367615
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color approx 6sq ft at the ceiling in the bathroomIssued Jul 1, 2024 · fix by Jul 7, 2024 overdue · Violation #17069749
- BBroken doors or locksReplace with new the missing wood doors at east wall cabinet in the kitchenIssued Jun 6, 2024 · fix by Jul 11, 2024 overdue · Violation #17023054
- CBroken doors or locksProvide approved one-hour fire resistance rated self-closing door at all openings to public hall, other than apartment main entrance door at, building 's…Issued Jun 6, 2024 · fix by Jun 20, 2024 overdue · Violation #17023058
- COther repairsReplace the broken or defective cracked bathub at south wall in the bathroomIssued Apr 22, 2024 · fix by Apr 28, 2024 overdue · rent impairing · Violation #16902473
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.