Housing violations · Midwood
1554 Ocean Avenue, Brooklyn
11230 · 71 apartments · 4 stories · City Council district 44
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
9 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster28
- Other repairs28
- Leaks and water damage14
- Lead paint14
- Roaches12
- Missing smoke or CO detector12
- Mice or rats11
- Plumbing, sinks and toilets8
- Broken doors or locks8
- Electrical problems5
- Mold4
- Missing window guards2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 31 closed · NYC typical: 87 days
from 37 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 29, 2026 · fix by Nov 24, 2026 · Violation #19333492
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19294624
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from northIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19281784
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19281787
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19281780
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures electrical outlet at south wall in the kitchenIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19281805
- BOther repairsProperly repair or replace the broken or defective wooden floor at base cabinet at north wall in the kitchenIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19281807
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallwayIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19281777
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures electrical outlet at north wall in the 1st room from northIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19281799
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures electrical outlet at north wall in the 2nd room from northIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19281854
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 30, 2026 · fix by Oct 26, 2026 overdue · Violation #19258688
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 30, 2026 · fix by Oct 26, 2026 overdue · Violation #19258689
- BLeaks and water damageRepair the roof so that it will not leak over ceiling in the 1st room from northIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · rent impairing · Violation #19258683
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the kitchenIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19258687
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19258684
- BLeaks and water damageRepair the roof so that it will not leak over ceiling in the 3rd room from north at eastIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · rent impairing · Violation #19258685
- BOther repairsProperly repair or replace the broken or defective glass panel at upper and lower window sash at west wall in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19189185
- BOther repairsProperly repair or replace the broken or defective glass pane at lower window sash at west 1 window in the 1st room from northIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19189184
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective reglazing porcelain bathtub in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19189183
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from northIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19189182
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19189180
- BOther repairsProperly repair or replace the broken or defective counter balance at lower window sash at west wall in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19189179
- BBroken doors or locksProperly repair or replace the broken or defective glass pane at vestibule door at public hall at 1st storyIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192860
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the 4th room from northIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · rent impairing · Violation #19192847
- BOther repairsReplace with new the missing escutcheon plate at heat riser at ceiling and floor in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192857
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192856
- BOther repairsProperly repair with similar material the broken or defective grout at east wall and south wall in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192855
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall, south wall and east wall in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192854
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Sep 8, 2026 · fix by Sep 22, 2026 overdue · Violation #19192853
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19192852
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192851
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192850
- BOther repairsProperly repair or replace the broken or defective window sill at east wall in the 2nd room from northIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192849
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 4th room from northIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192848
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19189191
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19189190
- BElectrical problemsProperly repair or replace the broken or defective electric outlet at north wall in the kitchenIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19189189
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in at wash basin in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · rent impairing · Violation #19189187
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in at bathtub in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · rent impairing · Violation #19189186
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from northIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19189181
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19189188
- BMoldTrace and repair the source and abate the visible mold condition less than 1o sqft at west wall in the bathroomIssued Aug 18, 2026 · fix by Sep 22, 2026 overdue · Violation #19151661
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 16, 2026 · fix by Aug 11, 2026 overdue · Violation #19080861
- COther repairsProperly repair or replace the broken or defective glass pane at lower sash at window at east in the 4th room from eastIssued Jul 16, 2026 · fix by Jul 22, 2026 overdue · Violation #19080874
- BOther repairsProperly repair with similar material the broken or defective ceramic tile at east wall in the bathroomIssued Jul 16, 2026 · fix by Aug 20, 2026 overdue · Violation #19080881
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 16, 2026 · fix by Aug 11, 2026 overdue · Violation #19080860
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from eastIssued Jul 16, 2026 · fix by Aug 20, 2026 overdue · Violation #19080869
- COther repairsProperly repair or replace the broken or defective glass pane at upper and lower sash in the bathroomIssued Jul 16, 2026 · fix by Jul 22, 2026 overdue · Violation #19080880
- BElectrical problemsProperly repair or replace the broken or defective electric outlet at south wall in the kitchenIssued Jul 16, 2026 · fix by Aug 20, 2026 overdue · Violation #19080889
- BOther repairsProperly repair or replace the broken or defective base cabinet floor at south wall in the kitchenIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18994943
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 11, 2026 · fix by Jul 7, 2026 overdue · Violation #18994942
- BOther repairsProperly repair or replace the broken or defective glass pane upper sash window 1st window from south at west wall in the bathroomIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18994941
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, west wall and at east wall in the foyerIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18994957
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and at north wall in the kitchenIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18994956
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from northIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18994950
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · rent impairing · Violation #18994945
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 11, 2026 · fix by Jul 7, 2026 overdue · Violation #18994952
- BOther repairsProperly repair or replace the broken or defective spring balance lower sash window 1st and 2nd window from south at west wall in the 3rd room from northIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18994951
- BOther repairsProperly repair or replace the broken or defective spring balance lower sash 1st window from south at west wall in the 1st room from northIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18994947
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish at bathtub by the method of reglazing in the bathroomIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18994946
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.