Housing violations · Flatbush
681 Ocean Avenue, Brooklyn
11226 · 60 apartments · 6 stories · City Council district 40
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs12
- Peeling paint and plaster11
- Roaches6
- Leaks and water damage4
- Electrical problems4
- Mice or rats3
- Lead paint3
- Missing smoke or CO detector2
- Mold2
- Plumbing, sinks and toilets1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 174 closed · NYC typical: 87 days
from 251 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at floor inside shower stall in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19353003
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 5, 2026 · fix by Dec 1, 2026 · Violation #19353002
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 5, 2026 · fix by Dec 1, 2026 · Violation #19353001
- BLeaks and water damageRepair the leaky and/or defective faucets in bathtub in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269102
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19269103
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269104
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269106
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269105
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19269107
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19269108
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling amd west wal in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269101
- BOther repairsProperly repair or replace the broken or defective light fixture ceiling at public hall, 1st storyIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19257677
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19149695
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 24, 2026 · fix by Sep 19, 2026 overdue · Violation #19149692
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the bathroomIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19149693
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at north wall in the kitchenIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · Violation #19076121
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at west wall in the 1st room from north at westIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · Violation #19076122
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallwayIssued Jul 1, 2026 · fix by Aug 5, 2026 overdue · Violation #19042259
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at washbasin in the bathroomIssued Jul 1, 2026 · fix by Aug 5, 2026 overdue · rent impairing · Violation #19042262
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 3, 2026 · fix by Jun 29, 2026 overdue · Violation #18975726
- COther repairsProperly repair with similar material the broken or defective bricks and mortar all story exterior wall at rear yardIssued Mar 12, 2026 · fix by Mar 18, 2026 overdue · Violation #18708500
- COther repairsProperly repair with similar material the broken or defective bricks and mortar east exterior wall 5th story at north yardIssued Mar 12, 2026 · fix by Mar 18, 2026 overdue · Violation #18708514
- COther repairsProperly repair with similar material the broken or defective bricks and mortar north exterior wall all story at center yardIssued Mar 12, 2026 · fix by Mar 18, 2026 overdue · Violation #18708507
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Dec 8, 2025 · fix by Jan 1, 2026 overdue · Violation #18493825
- BOther repairsProperly repair with similar material the broken or defective ceramic tile floor in the kitchenIssued Oct 23, 2025 · fix by Nov 27, 2025 overdue · Violation #18323135
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 23, 2025 · fix by Nov 27, 2025 overdue · Violation #18323134
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from eastIssued Oct 23, 2025 · fix by Nov 27, 2025 overdue · Violation #18323116
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from eastIssued Oct 23, 2025 · fix by Nov 27, 2025 overdue · Violation #18323105
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Oct 6, 2025 · fix by Oct 30, 2025 overdue · Violation #18277068
- BOther repairsProperly repair with similar material the broken or defective cracked ceramic floor tiles in the bathroomIssued Oct 9, 2024 · fix by Nov 13, 2024 overdue · Violation #17333413
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 4, 2024 · fix by Sep 30, 2024 overdue · Violation #17237656
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures at ceiling in the 1st room from north at eastIssued Jun 18, 2024 · fix by Jul 23, 2024 overdue · Violation #17032420
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Jun 18, 2024 · fix by Jul 23, 2024 overdue · Violation #17032413
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures at ceiling in the private hallwayIssued Jun 18, 2024 · fix by Jul 23, 2024 overdue · Violation #17032416
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at eastIssued Jun 18, 2024 · fix by Jul 23, 2024 overdue · Violation #17032418
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at southIssued Feb 14, 2024 · fix by Mar 20, 2024 overdue · Violation #16676707
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the bathroomIssued Feb 14, 2024 · fix by Mar 20, 2024 overdue · Violation #16676696
- BOther repairsProperly repair with similar material the broken or defective wood floor (warped) in the kitchenIssued Feb 14, 2024 · fix by Mar 20, 2024 overdue · Violation #16676698
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at southIssued Feb 14, 2024 · fix by Mar 20, 2024 overdue · Violation #16676706
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east at southIssued Oct 11, 2023 · fix by Nov 15, 2023 overdue · Violation #16299707
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Apr 13, 2023 · fix by May 7, 2023 overdue · Violation #15926093
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 28, 2023 · fix by Mar 26, 2023 overdue · Violation #15746821
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 15, 2022 · fix by Oct 11, 2022 overdue · Violation #15364725
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.