Housing violations · Kensington
178 Ocean Parkway, Brooklyn
11218 · 95 apartments · 6 stories · City Council district 39
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
12 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs49
- Broken doors or locks33
- Peeling paint and plaster31
- Mice or rats13
- Roaches13
- Mold12
- Leaks and water damage12
- Missing smoke or CO detector8
- Plumbing, sinks and toilets6
- Electrical problems5
- Lead paint3
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 78 closed · NYC typical: 87 days
from 78 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at west window frame in the bathroomIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19187141
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft base cabinet floor at south wall in the kitchenIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19187142
- BOther repairsProperly repair or replace the broken or defective spring balance lower sash window 1st window frame from south at west wall in the bathroomIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849410
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste pipe at bathtub in the bathroomIssued May 4, 2026 · fix by Jun 8, 2026 overdue · rent impairing · Violation #18849408
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849407
- BOther repairsProperly repair or replace the broken or defective base cabinet floor at south wall in the kitchenIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849413
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 4th room from northIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849405
- BLeaks and water damageRepair the leaky and/or defective faucets at washbasin in the bathroomIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849406
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in wasteline at sink in the kitchenIssued May 4, 2026 · fix by Jun 8, 2026 overdue · rent impairing · Violation #18849412
- BOther repairsProperly repair or replace the broken or defective spring balance upper sash window 1st window frame from east at south wall in the 4th room from northIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849411
- BOther repairsProperly secure the loose light fixture at ceiling in the private hallwayIssued Mar 31, 2026 · fix by May 5, 2026 overdue · Violation #18742915
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at westIssued Mar 31, 2026 · fix by May 5, 2026 overdue · Violation #18742909
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tile in the bathroomIssued Mar 31, 2026 · fix by May 5, 2026 overdue · Violation #18742914
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at westIssued Mar 31, 2026 · fix by May 5, 2026 overdue · Violation #18742910
- BBroken doors or locksRefit 1st closet door west in the private hallwayIssued Mar 31, 2026 · fix by May 5, 2026 overdue · Violation #18742916
- BOther repairsProperly repair with similar material the broken or defective ceramic tile atnorth wall in the bathroomIssued Mar 31, 2026 · fix by May 5, 2026 overdue · Violation #18742913
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Mar 31, 2026 · fix by May 5, 2026 overdue · Violation #18742912
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18726413
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18726414
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroomIssued Mar 9, 2026 · fix by Apr 13, 2026 overdue · Violation #18690957
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at southIssued Mar 9, 2026 · fix by Apr 13, 2026 overdue · Violation #18701113
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 9, 2026 · fix by Apr 4, 2026 overdue · Violation #18690967
- COther repairsProvide an adequate supply of gas to the fixtures at gas range in the kitchenIssued Mar 9, 2026 · fix by Mar 15, 2026 overdue · rent impairing · Violation #18690964
- BOther repairsProperly repair with similar material the broken or defective wood floor at base cabinet at west wall in the kitchenIssued Mar 9, 2026 · fix by Apr 13, 2026 overdue · Violation #18690966
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Mar 9, 2026 · fix by Apr 13, 2026 overdue · Violation #18690965
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall, ceiling in the kitchenIssued Mar 9, 2026 · fix by Apr 13, 2026 overdue · Violation #18690960
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchenIssued Mar 9, 2026 · fix by Apr 13, 2026 overdue · Violation #18690958
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective wood base cabinet at sink in the kitchenIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18575593
- BOther repairsProvide an adequate supply of gas to the fixtures at gas range in the entire apartmentIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · rent impairing · Violation #18575594
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 20, 2026 · fix by Feb 15, 2026 overdue · Violation #18575595
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 12, 2026 · fix by Feb 7, 2026 overdue · Violation #18559776
- COther repairsProvide an adequate supply of gas to the fixtures at gas range in the kitchenIssued Jan 12, 2026 · fix by Jan 18, 2026 overdue · rent impairing · Violation #18559774
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 12, 2026 · fix by Feb 7, 2026 overdue · Violation #18559775
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective masonry cements at grouts joints of the ceramic tiles at south and west walls around bathtub, in…Issued Dec 19, 2025 · fix by Jan 23, 2026 overdue · Violation #18512800
- BOther repairsProperly repair with similar material the broken or defective laminated floor tiles, in the 1st room from north at westIssued Dec 19, 2025 · fix by Jan 23, 2026 overdue · Violation #18512792
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set assembly at the north entrance to compactor closet, at public hall at north ,…Issued Dec 19, 2025 · fix by Jan 2, 2026 overdue · Violation #18512802
- BOther repairsProperly repair with similar material the broken or defective laminated floor tiles, in the 1st room from north at eastIssued Dec 19, 2025 · fix by Jan 23, 2026 overdue · Violation #18512789
- BMoldProperly secure the loose wood baseboard molding at south wall, in the foyerIssued Dec 19, 2025 · fix by Jan 23, 2026 overdue · Violation #18512788
- BOther repairsProperly repair with similar material the broken or defective laminated floor tiles, in the foyerIssued Dec 19, 2025 · fix by Jan 23, 2026 overdue · Violation #18512787
- CBroken doors or locksProvide ready access to buildings heating system door was locked at basementIssued Nov 18, 2025 · fix by Nov 24, 2025 overdue · Violation #18368694
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 1st room from east at northIssued Nov 17, 2025 · fix by Nov 23, 2025 overdue · Violation #18368695
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Nov 10, 2025 · fix by Dec 15, 2025 overdue · Violation #18358740
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Nov 5, 2025 · fix by Nov 11, 2025 overdue · rent impairing · Violation #18341994
- COther repairsProvide an adequate supply of gas to the fixtures at gas range in the kitchenIssued Oct 14, 2025 · fix by Oct 20, 2025 overdue · rent impairing · Violation #18289674
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Oct 14, 2025 · fix by Oct 28, 2025 overdue · Violation #18289677
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Oct 7, 2025 · fix by Nov 11, 2025 overdue · Violation #18272177
- BOther repairsFire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate in the entire apartmentIssued Oct 7, 2025 · fix by Nov 11, 2025 overdue · Violation #18272172
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 7, 2025 · fix by Nov 2, 2025 overdue · Violation #18272170
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Oct 7, 2025 · fix by Nov 11, 2025 overdue · Violation #18272173
- BOther repairsProperly repair or replace the broken or defective counter balance at upper and lower sashes at window in the bathroomIssued Oct 7, 2025 · fix by Nov 11, 2025 overdue · Violation #18272174
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 7, 2025 · fix by Nov 2, 2025 overdue · Violation #18272165
- BOther repairsProperly repair or replace the broken or defective counter balances of lower and upper sashes at window in the kitchenIssued Oct 7, 2025 · fix by Nov 11, 2025 overdue · Violation #18272175
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Oct 2, 2025 · fix by Oct 16, 2025 overdue · Violation #18263144
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Oct 2, 2025 · fix by Oct 8, 2025 overdue · rent impairing · Violation #18263143
- BLead paint& 309 m/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 2nd room from east at northIssued Oct 2, 2025 · fix by Nov 6, 2025 overdue · Violation #18263145
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 15, 2025 · fix by Oct 20, 2025 overdue · Violation #18228718
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 15, 2025 · fix by Oct 20, 2025 overdue · Violation #18228717
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges springs at the entrance to compactor closet 1st from west at north, .in the north…Issued Aug 18, 2025 · fix by Sep 1, 2025 overdue · Violation #18160242
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 18, 2025 · fix by Sep 13, 2025 overdue · Violation #18160238
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak .at the ceiling, in the 1st room from northIssued Aug 18, 2025 · fix by Sep 22, 2025 overdue · Violation #18160221
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.