Housing violations · Kensington
465 Ocean Parkway, Brooklyn
11218 · 99 apartments · 6 stories · City Council district 39
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
22 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs50
- Peeling paint and plaster49
- Broken doors or locks29
- Lead paint17
- Missing smoke or CO detector13
- Roaches11
- Leaks and water damage11
- No heat or hot water11
- Mice or rats10
- Plumbing, sinks and toilets10
- Electrical problems8
- Mold5
- Missing window guards3
- Bedbugs1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 46 closed · NYC typical: 87 days
from 40 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BLead paintProperly repair or replace the broken or defective latch assembly at fire door leading to first fire stairs from east at south at public hall, 4th story,…Issued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19134090
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 12, 2026 · fix by Sep 7, 2026 overdue · Violation #19134158
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19134161
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 12, 2026 · fix by Sep 7, 2026 overdue · Violation #19134157
- BLeaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19134156
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19134125
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19134122
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19134121
- CLead paintReplace or repair the self-closing doors that is missing or defective latch assembly at fire door leading to first fire stairs from east at south at public…Issued Aug 12, 2026 · fix by Aug 26, 2026 overdue · Violation #19134089
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19134160
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18995788
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18995786
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 11, 2026 · fix by Jul 7, 2026 overdue · Violation #18995792
- BOther repairsProperly repair or replace the broken or defective floor tiles in the bathroomIssued May 13, 2026 · fix by Jun 17, 2026 overdue · Violation #18926281
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroomIssued May 13, 2026 · fix by Jun 17, 2026 overdue · Violation #18926289
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north wall in closet at north wall in the 2nd room from northIssued May 13, 2026 · fix by Jun 17, 2026 overdue · Violation #18926287
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the bathroomIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18811994
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west wall in the bathroomIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18811997
- COther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Apr 27, 2026 · fix by May 3, 2026 overdue · Violation #18811998
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of free standing refrigerator with upper and lower doors intact at basementIssued Mar 4, 2026 · fix by Mar 10, 2026 overdue · Violation #18686503
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from north at eastIssued Feb 9, 2026 · fix by Mar 16, 2026 overdue · Violation #18628981
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at the sink in the kitchenIssued Feb 9, 2026 · fix by Mar 16, 2026 overdue · Violation #18628980
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the west wall in the bathroomIssued Feb 9, 2026 · fix by Mar 16, 2026 overdue · Violation #18628982
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Feb 9, 2026 · fix by Mar 16, 2026 overdue · Violation #18628979
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 2nd room from north at eastIssued Feb 9, 2026 · fix by Mar 16, 2026 overdue · Violation #18628977
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Feb 9, 2026 · fix by Mar 16, 2026 overdue · Violation #18628978
- BLeaks and water damageRepair the leaky and/or defective faucets in the bathtub in the bathroomIssued Feb 9, 2026 · fix by Mar 16, 2026 overdue · Violation #18628983
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 6, 2026 · fix by Mar 4, 2026 overdue · Violation #18621627
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Feb 6, 2026 · fix by Mar 13, 2026 overdue · Violation #18621629
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 6, 2026 · fix by Mar 4, 2026 overdue · Violation #18621628
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq/ft at the north wall in the bathroomIssued Feb 6, 2026 · fix by Mar 13, 2026 overdue · Violation #18621625
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective reglaze bathtub with porcelain paint. in the bathroomIssued Feb 6, 2026 · fix by Mar 13, 2026 overdue · Violation #18621626
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set assembly at south entrance to fire staircase, at public hall, 2nd story,…Issued Jan 27, 2026 · fix by Feb 10, 2026 overdue · Violation #18596127
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges springs at south entrance to compactor closet at public hall, 2nd story, section…Issued Jan 27, 2026 · fix by Feb 10, 2026 overdue · Violation #18596126
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallwayIssued Jan 14, 2026 · fix by Feb 18, 2026 overdue · Violation #18566798
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from northIssued Jan 14, 2026 · fix by Feb 18, 2026 overdue · Violation #18566797
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 3rd room from northIssued Jan 14, 2026 · fix by Feb 18, 2026 overdue · Violation #18566796
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective reglaze bathtub in the bathroomIssued Oct 20, 2025 · fix by Nov 24, 2025 overdue · Violation #18306297
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Oct 20, 2025 · fix by Nov 24, 2025 overdue · Violation #18306293
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft at west and north wall in the bathroomIssued May 30, 2025 · fix by Jul 4, 2025 overdue · Violation #17935430
- BPlumbing, sinks and toiletsRepair the broken or defective connection at wasteline under sink in the kitchenIssued Mar 19, 2024 · fix by Apr 23, 2024 overdue · Violation #16742837
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes airconditioner protruding beyond window approx more than 4 inches…Issued Mar 14, 2024 · fix by Apr 18, 2024 overdue · Violation #16742841
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes airconditioner protruding beyond window sill approx more than 4…Issued Mar 14, 2024 · fix by Apr 18, 2024 overdue · Violation #16742840
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Mar 14, 2024 · fix by Apr 18, 2024 overdue · Violation #16742838
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at east wall in the bathroomIssued Mar 14, 2024 · fix by Apr 18, 2024 overdue · Violation #16742836
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall and ceiling in the bathroomIssued Mar 14, 2024 · fix by Apr 18, 2024 overdue · Violation #16742839
- BOther repairsFire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate in the 2nd room from northIssued Feb 20, 2024 · fix by Mar 26, 2024 overdue · Violation #16633959
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall. in the 4th room from northIssued Feb 20, 2024 · fix by Mar 26, 2024 overdue · Violation #16633958
- CNo heat or hot waterProvide hot water at all hot water fixtures in the bathroomIssued Feb 12, 2024 · fix by Feb 11, 2024 overdue · rent impairing · Violation #16664759
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latchset at compactor closet door at public hall, 4th story, section at northIssued Feb 5, 2024 · fix by Feb 19, 2024 overdue · Violation #16641251
- BBroken doors or locksProperly repair or replace the broken or defective latch set at compactor closet door at public hall, 4th story, section at northIssued Feb 5, 2024 · fix by Mar 11, 2024 overdue · Violation #16641252
- BLead paintRefit 2nd fire door from north at east leading to staircase b at public hall, section at northIssued Feb 5, 2024 · fix by Mar 11, 2024 overdue · Violation #16641248
- CLead paintReplace or repair the self-closing doors that is missing or defective door 2nd fire door from north at east leading to staircase b at public hall, section at…Issued Feb 5, 2024 · fix by Feb 19, 2024 overdue · Violation #16641247
- CLead paintRemove device preventing door from being self-closing wedge at door leading to laundry room at public hall, section at northIssued Feb 5, 2024 · fix by Feb 19, 2024 overdue · Violation #16641249
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 5, 2024 · fix by Feb 3, 2024 overdue · rent impairing · Violation #16642439
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes airconditioner protruding beyond window sill approx more than 4…Issued Feb 5, 2024 · fix by Mar 11, 2024 overdue · Violation #16642438
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at hopper door to compactor at public hall, 4th story, section at northIssued Feb 5, 2024 · fix by Feb 19, 2024 overdue · Violation #16641250
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 2, 2024 · fix by Feb 28, 2024 overdue · Violation #16636011
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 2, 2024 · fix by Feb 28, 2024 overdue · Violation #16636010
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 1, 2024 · fix by Feb 1, 2024 overdue · rent impairing · Violation #16636008
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.