Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Crown Heights (North)

1442 Pacific Street, Brooklyn

11216 · 8 apartments · 4 stories · City Council district 36

By · Updated · Data from NYC HPD

C
20open immediately hazardous violations · 250 per 100 apartments
B18Hazardous, open
A3Non-hazardous, open
!41Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyPacific Street Property Group LLC
Landlord (head officer or owner)Ian Lagowitz

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    12
  2. Other repairs
    11
  3. Broken doors or locks
    7
  4. Leaks and water damage
    4
  5. Bedbugs
    2
  6. Mice or rats
    2
  7. Lead paint
    2
  8. No heat or hot water
    1
  9. Plumbing, sinks and toilets
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C78 days
from 12 closed · NYC typical: 87 days
B112 days
from 21 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Other repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Jul 30, 2026 · fix by Aug 5, 2026 overdue · rent impairing · Violation #19112821
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jul 30, 2026 · fix by Aug 13, 2026 overdue · Violation #19112812
  • B
    Other repairsFire escape defective. properly secure gooseneck ladder at building rear at roof at fire escapeIssued Jul 29, 2026 · fix by Sep 2, 2026 overdue · rent impairing · Violation #19097237
  • B
    Other repairsThe following dwelling units were reoccupied while being subject to an order to repair/vacate order issued by the department; file for a dismissal request…Issued May 1, 2026 · fix by Jun 5, 2026 overdue · Violation #18822132
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at cellarIssued Apr 23, 2026 · fix by Apr 29, 2026 overdue · Violation #18805258
  • B
    Broken doors or locksProperly repair or replace the broken or defective upper and lower hinges at door in the bathroomIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18766402
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at basementIssued Apr 10, 2026 · fix by Apr 16, 2026 overdue · Violation #18774342
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 10, 2026 · fix by May 6, 2026 overdue · Violation #18774343
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18766403
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from northIssued Apr 7, 2026 · fix by Apr 13, 2026 overdue · Violation #18766404
  • C
    Lead paintProvide ready access to buildings heating system door locked at south wall at front yard, leading to the basement at boiler roomIssued Apr 3, 2026 · fix by Apr 9, 2026 overdue · Violation #18749515
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Mar 31, 2026 · fix by Mar 31, 2026 overdue · rent impairing · Violation #18749514
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and west wall in the 1st room from north at westIssued Mar 5, 2026 · fix by Apr 9, 2026 overdue · Violation #18681906
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallwayIssued Mar 5, 2026 · fix by Mar 11, 2026 overdue · Violation #18681908
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Mar 5, 2026 · fix by Mar 11, 2026 overdue · Violation #18681907
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at southIssued Mar 5, 2026 · fix by Apr 9, 2026 overdue · Violation #18681910
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at southIssued Mar 5, 2026 · fix by Apr 9, 2026 overdue · Violation #18681909
  • B
    Broken doors or locksProperly secure the loose door at entrance in the bathroomIssued Mar 5, 2026 · fix by Apr 9, 2026 overdue · Violation #18681904
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at westIssued Mar 5, 2026 · fix by Mar 11, 2026 overdue · Violation #18681905
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenIssued Mar 4, 2026 · fix by Mar 10, 2026 overdue · Violation #18681903
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Feb 4, 2026 · fix by Feb 18, 2026 overdue · Violation #18614321
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of fire damage in the entire apartmentIssued Feb 2, 2026 · fix by Feb 8, 2026 overdue · Violation #18591585
  • C
    Other repairsThe following dwelling units were reoccupied while being subject to an order to repair/vacate order issued by the department; order conditions observed…Issued Jan 23, 2026 · fix by Jan 29, 2026 overdue · Violation #18584136
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of fire damage in the entire apartmentIssued Jan 9, 2026 · fix by Jan 15, 2026 overdue · Violation #18549350
  • B
    Other repairsProperly repair or replace the broken or defective upper window sash at south in the 5th room from northIssued Jun 9, 2025 · fix by Jul 14, 2025 overdue · Violation #17979573
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 7th room from northIssued May 8, 2025 · fix by Jun 12, 2025 overdue · Violation #17876235
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 7th room from northIssued May 8, 2025 · fix by Jun 12, 2025 overdue · Violation #17876233
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective wood base cabinet at sink in the kitchenIssued Nov 12, 2024 · fix by Dec 17, 2024 overdue · Violation #17410884
  • C
    Peeling paint and plasterProperly repair with similar material the broken or defective unkeyed plaster approx 30 square feet at celing in the 4th room from northIssued Mar 11, 2024 · fix by Mar 17, 2024 overdue · Violation #16729894
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Jun 6, 2023 · fix by Jul 11, 2023 overdue · Violation #16015743
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 6, 2023 · fix by Jul 2, 2023 overdue · Violation #16015742
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak water leak ceiling in the bathroomIssued Jun 6, 2023 · fix by Jun 12, 2023 overdue · Violation #16015741
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 12, 2011 · fix by Nov 7, 2011 overdue · Violation #9153243
  • B
    BedbugsAbate the nuisance consisting of bedbugs in the entire apartmentIssued Aug 10, 2010 · fix by Sep 14, 2010 overdue · Violation #8546245
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the bathroomIssued Dec 15, 2006 · fix by Jan 24, 2007 overdue · Violation #6510300
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles all walls in the bathroomIssued Dec 15, 2006 · fix by Jan 24, 2007 overdue · Violation #6510303
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the entire apartmentIssued Dec 15, 2006 · fix by Jan 24, 2007 overdue · Violation #6510304
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the entire apartmentIssued Dec 15, 2006 · fix by Jan 24, 2007 overdue · Violation #6510301

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

52019
72020
122021
22022
62023
192024
162025
292026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 155 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.