Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Bushwick (East)

309 Palmetto Street, Brooklyn

11237 · 6 apartments · 3 stories · City Council district 37

By · Updated · Data from NYC HPD

C
11open immediately hazardous violations · 183 per 100 apartments
B34Hazardous, open
A7Non-hazardous, open
!52Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

6 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company309 PALMETTO STREET REALTY CORP.
Landlord (head officer or owner)Deodat Lowtan

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    18
  2. Peeling paint and plaster
    8
  3. Missing smoke or CO detector
    8
  4. Leaks and water damage
    7
  5. Broken doors or locks
    5
  6. Mice or rats
    2
  7. No heat or hot water
    1
  8. Mold
    1
  9. Lead paint
    1
  10. Plumbing, sinks and toilets
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

CNot enough data
NYC typical: 87 days
B118 days
from 2 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued May 13, 2025 · fix by May 27, 2025 overdue · Violation #17887724
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of construction material at public hall, 2nd storyIssued Apr 5, 2021 · fix by May 10, 2021 overdue · Violation #14116120
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 27, 2021 · fix by Feb 22, 2021 overdue · Violation #14004998
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north and west wall in the 3rd room from northIssued Jan 27, 2021 · fix by Mar 3, 2021 overdue · Violation #14005013
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 4th room from northIssued Jan 27, 2021 · fix by Mar 3, 2021 overdue · Violation #14005007
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north, east, west and south wall in the kitchenIssued Jan 27, 2021 · fix by Mar 3, 2021 overdue · Violation #14005017
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north, east, west and south wall in the bathroomIssued Jan 27, 2021 · fix by Mar 3, 2021 overdue · Violation #14005021
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at washbasin in the bathroomIssued Jan 27, 2021 · fix by Mar 3, 2021 overdue · Violation #14005022
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north, east, west and south wall in the 2nd room from northIssued Jan 27, 2021 · fix by Mar 3, 2021 overdue · Violation #14005014
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Dec 30, 2019 · fix by Feb 3, 2020 overdue · Violation #13521554
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Dec 30, 2019 · fix by Feb 3, 2020 overdue · Violation #13521558
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from northIssued Dec 30, 2019 · fix by Jan 7, 2020 overdue · Violation #13521566
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling in the 4th room from northIssued Dec 30, 2019 · fix by Feb 3, 2020 overdue · rent impairing · Violation #13521570
  • C
    Broken doors or locksRemove the illegal fastening consisting hasp and hasplock installed at exterior of apartment 3l entrance door at public hall, 3rd storyIssued Dec 30, 2019 · fix by Jan 7, 2020 overdue · rent impairing · Violation #13521580
  • B
    Other repairsRemove all encumbrances consisting of household items at 2nd and 3rd story public halls at public hallIssued Dec 30, 2019 · fix by Feb 3, 2020 overdue · rent impairing · Violation #13521582
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ,…Issued Dec 30, 2019 · fix by Jan 7, 2020 overdue · Violation #13521599
  • B
    No heat or hot waterProvide adequate supply of hot water for the fixtures in the entire apartmentIssued Nov 16, 2018 · fix by Dec 21, 2018 overdue · rent impairing · Violation #12757362
  • B
    Leaks and water damageRepair the roof so that it will not leak in the 3rd room from eastIssued Nov 16, 2018 · fix by Dec 21, 2018 overdue · rent impairing · Violation #12753346
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from eastIssued Nov 16, 2018 · fix by Dec 21, 2018 overdue · Violation #12753343
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from eastIssued Nov 16, 2018 · fix by Dec 21, 2018 overdue · Violation #12753341
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the 3rd room from eastIssued Nov 13, 2018 · fix by Dec 18, 2018 overdue · rent impairing · Violation #12749288
  • B
    MoldTrace and repair the source and abate the nuisance consisting of mold approximately 3 sq. ft. at ceiling, 5 sq. ft. at west wall and 2 sq. ft. at south wall…Issued Nov 13, 2018 · fix by Dec 18, 2018 overdue · Violation #12749281
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Nov 13, 2018 · fix by Nov 21, 2018 overdue · Violation #12749294
  • C
    Other repairsSection 27-2005 adm code replace with new the broken or defective glass of the lower sash at west window in the 4th room from northIssued Nov 20, 2014 · fix by Nov 28, 2014 overdue · Violation #10451005
  • C
    Other repairsSection 27-2033 adm code post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to…Issued Mar 20, 2013 · fix by Mar 26, 2013 overdue · Violation #9774476
  • C
    Lead paintSection 27-2033 adm code provide ready access to buildings heating system door leading to cellar locked , at public hall, 1st storyIssued Mar 20, 2013 · fix by Mar 26, 2013 overdue · Violation #9774470
  • C
    Broken doors or locksSection 27-2033 adm code provide ready access to buildings heating system locked door at cellarIssued Nov 7, 2011 · fix by Nov 13, 2011 overdue · Violation #9193524
  • C
    Plumbing, sinks and toiletsSection 27-2026 adm code repair the broken or defective connection wasteline at sink in the bathroomIssued Aug 12, 2011 · fix by Aug 18, 2011 overdue · Violation #9057231
  • B
    Missing smoke or CO detectorSection 27-2045 adm code repair or replace the smoke detector missingIssued Aug 12, 2011 · fix by Sep 16, 2011 overdue · Violation #9057236
  • B
    Missing smoke or CO detectorProvide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rulesIssued Aug 12, 2011 · fix by Sep 16, 2011 overdue · Violation #9057235
  • B
    Peeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Aug 12, 2011 · fix by Sep 16, 2011 overdue · Violation #9057233
  • B
    Other repairsD26-19.05 adm code provide adequate light of not less than 60 watts incandescent or equivalent illumination vestibule 1 sty public hallIssued Aug 13, 2008 · fix by Sep 17, 2008 overdue · Violation #1849880
  • B
    Other repairsD26-10.01 adm code & 309 m/d law abate the nuisance consisting of antenna wire creating trip hazard roof centerIssued Aug 13, 2008 · fix by Sep 17, 2008 overdue · Violation #1849881
  • B
    Broken doors or locksSection 27-2005 adm code replace with new the broken or defective locking device at entrance door, at public hall, 1st storyIssued Aug 28, 2007 · fix by Oct 2, 2007 overdue · Violation #4355860
  • B
    Other repairsSection 27-2005 adm code replace with new the broken or defective broken glass at south window upper sashe, at 1st bedroom from east, 1st story, apartmentIssued Aug 28, 2007 · fix by Oct 2, 2007 overdue · Violation #4355847
  • B
    Other repairsSection 27-2005 adm code properly repair the broken or defective ceiling light fixture vestibule 1 sty public hallIssued Aug 28, 2007 · fix by Oct 2, 2007 overdue · Violation #1849891
  • B
    Other repairsSection 27-2005 adm code properly repair the broken or defective wall light fixture of buildingIssued Aug 28, 2007 · fix by Oct 2, 2007 overdue · Violation #1849890
  • B
    Mice or ratsSection 27-2018 adm code abate the nuisance consisting of vermin mice and roaches 1 sty eastIssued Aug 28, 2007 · fix by Oct 2, 2007 overdue · Violation #1849889
  • B
    Other repairsSection 27-2005 adm code properly repair the broken or defective upper and lower window sashes kitchen and south room 1 sty eastIssued Aug 28, 2007 · fix by Oct 2, 2007 overdue · Violation #1849888
  • B
    Missing smoke or CO detectorSection 27-2045 adm code repair or replace the smoke detector missing 1 sty eastIssued Aug 28, 2007 · fix by Oct 2, 2007 overdue · Violation #1849887
  • B
    Other repairsSection 27-2005 adm code properly repair the broken or defective ceiling light fixture center room 1 sty eastIssued Aug 28, 2007 · fix by Oct 2, 2007 overdue · Violation #1849886
  • B
    Other repairsSection 27-2005 adm code properly repair with similar material the broken or defective ceramic tiles floor bathroom 1 sty eastIssued Aug 28, 2007 · fix by Oct 2, 2007 overdue · Violation #1849885
  • B
    Peeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling thru out 1 sty eastIssued Aug 28, 2007 · fix by Oct 2, 2007 overdue · Violation #1849884
  • B
    Other repairsSection 27-2005 adm code properly repair with similar material the broken or defective metal ceiling kitchen 1 sty eastIssued Aug 28, 2007 · fix by Oct 2, 2007 overdue · Violation #1849883
  • B
    Other repairsSection 27-2040 adm code provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day…Issued Aug 28, 2007 · fix by Oct 2, 2007 overdue · Violation #1849882

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

132018
132019
32020
142021
32025
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 77 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.