Housing violations · Crown Heights (North)
1544 Park Place, Brooklyn
11213 · 34 apartments · 4 stories · City Council district 36
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
4 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs25
- Peeling paint and plaster21
- Broken doors or locks10
- Leaks and water damage9
- Roaches8
- Plumbing, sinks and toilets6
- Mice or rats6
- Electrical problems3
- Lead paint2
- Mold2
- Missing smoke or CO detector2
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 48 closed · NYC typical: 87 days
from 65 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296372
- BOther repairsProperly repair or replace the broken or defective radiator shut-off knob in the 1st room from east at southIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296373
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 15, 2026 · fix by Nov 10, 2026 overdue · Violation #19296370
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Sep 18, 2026 · fix by Oct 12, 2026 overdue · Violation #19228104
- BBroken doors or locksProperly repair or replace the broken or defective cracked wood door frame in te etnrance at north wall in the 1st room from east at southIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19222628
- BPlumbing, sinks and toiletsReplace the broken or defective cracked wash basin at east wall in the bathroomIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · rent impairing · Violation #19222619
- BLeaks and water damageRepair the leaky and/or defective faucets at, wash basin, east wall in the bathroomIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19222618
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19222606
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at southIssued Sep 17, 2026 · fix by Sep 23, 2026 overdue · Violation #19222629
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from east at southIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19222626
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at southIssued Sep 17, 2026 · fix by Sep 23, 2026 overdue · Violation #19222625
- BPeeling paint and plasterProperly repair with similar material the broken or defective reglaze the corroded porcelain paint at, bahtub , east wall , in the bathroomIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19222620
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19222615
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19222609
- BBroken doors or locksProperly repair or replace the broken or defective gasket at refrigerator door in the kitchenIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19222607
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Sep 17, 2026 · fix by Oct 13, 2026 overdue · Violation #19222603
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19222602
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from east at southIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19222601
- BOther repairsProperly secure the loose radiator at east wall in the 3rd room from east at northIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19222600
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at south wall in the 3rd room from east at northIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19222599
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from east at northIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19222598
- BElectrical problemsProperly repair or replace the broken or defective cracked electrical outlet cover at west wall in the 3rd room from east at southIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19222597
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19222594
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 17, 2026 · fix by Oct 13, 2026 overdue · Violation #19222595
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective sink's counter top at west wall in the kitchenIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19222605
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at east wall in the bathroomIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19222579
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Sep 8, 2026 · fix by Sep 22, 2026 overdue · Violation #19183558
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at wash basin in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · rent impairing · Violation #19183555
- COther repairsProperly repair or replace the broken or defective inoperable gate at fire escape window at south wall in the 4th room from eastIssued Sep 8, 2026 · fix by Sep 14, 2026 overdue · Violation #19183559
- BOther repairs& 309 m/d law abate the nuisance consisting of garbage can preventing dropladder from free falling at 1st stack from west at north (building front) at fire…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19183561
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items at 2nd story balcony at 1st stack…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19183564
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19183556
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · rent impairing · Violation #19183554
- BBroken doors or locksProperly repair or replace the broken or defective lock and assembly in the entranceIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19187180
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 2, 2026 · fix by Sep 28, 2026 overdue · Violation #19187189
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the 3rd room from eastIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19187185
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 2, 2026 · fix by Sep 28, 2026 overdue · Violation #19187188
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, south wall and north walls in the kitchenIssued Jan 28, 2026 · fix by Mar 4, 2026 overdue · Violation #18596794
- BOther repairsReplace with new the missing escutheon plate at ceiling riser in the kitchenIssued Jan 28, 2026 · fix by Mar 4, 2026 overdue · Violation #18596796
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling ,north wall and south walls in the kitchenIssued Jan 28, 2026 · fix by Mar 4, 2026 overdue · Violation #18596795
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 29, 2025 · fix by Aug 24, 2025 overdue · Violation #18113169
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at east wall in the 1st room from east at northIssued Jul 3, 2025 · fix by Aug 7, 2025 overdue · Violation #18057444
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at south wall in the 1st room from east at northIssued Jul 3, 2025 · fix by Aug 7, 2025 overdue · Violation #18057445
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at northIssued Jul 3, 2025 · fix by Aug 7, 2025 overdue · Violation #18057446
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Mar 24, 2025 · fix by Apr 28, 2025 overdue · rent impairing · Violation #17778476
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at eastIssued Mar 24, 2025 · fix by Apr 28, 2025 overdue · Violation #17778480
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 31, 2024 · fix by Nov 26, 2024 overdue · Violation #17391536
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tile in the 3rd room from east at northIssued Apr 10, 2023 · fix by May 15, 2023 overdue · Violation #15912444
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective ceramic tile at south wall in bathtub in the bathroomIssued Apr 10, 2023 · fix by May 15, 2023 overdue · Violation #15912446
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 10, 2023 · fix by May 6, 2023 overdue · Violation #15912453
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Mar 3, 2020 · fix by Apr 7, 2020 overdue · Violation #13612987
- BOther repairsProperly repair with similar material the broken or defective wood floor at radiator in the 2nd room from east at northIssued Mar 3, 2020 · fix by Apr 7, 2020 overdue · Violation #13612977
- BOther repairsProperly repair with similar material the broken or defective wood floor at radiator in the 1st room from east at northIssued Feb 27, 2020 · fix by Apr 2, 2020 overdue · Violation #13612943
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 27, 2020 · fix by Mar 19, 2020 overdue · Violation #13612946
- BMoldTrace and repair the source and abate the visible mold condition at the ceiling, south and west walls . approx 25 sq ft in the bathroomIssued Sep 16, 2019 · fix by Oct 21, 2019 overdue · Violation #13279443
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 22, 2019 · fix by Sep 12, 2019 overdue · Violation #13240314
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 22, 2019 · fix by Sep 12, 2019 overdue · Violation #13240315
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 19, 2019 · fix by Apr 9, 2019 overdue · Violation #12964972
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 19, 2019 · fix by Apr 9, 2019 overdue · Violation #12964971
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 19, 2019 · fix by Apr 9, 2019 overdue · Violation #12965031
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.