Housing violations · Harlem (North)
2306 Adam C Powell Boulevard, Manhattan
10030 · 10 apartments · 5 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
6 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs9
- Mice or rats8
- No heat or hot water5
- Broken doors or locks3
- Mold2
- Missing smoke or CO detector2
- Leaks and water damage2
- Peeling paint and plaster2
- Roaches1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 79 closed · NYC typical: 87 days
from 56 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Sep 28, 2026 · fix by Oct 24, 2026 overdue · rent impairing · Violation #19252775
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Sep 28, 2026 · fix by Sep 28, 2026 overdue · rent impairing · Violation #19252773
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Sep 28, 2026 · fix by Sep 28, 2026 overdue · rent impairing · Violation #19252774
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square feet at south wall in the 7th room from northIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19242372
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Sep 17, 2026 · fix by Sep 17, 2026 overdue · rent impairing · Violation #19222772
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Sep 17, 2026 · fix by Sep 23, 2026 overdue · Violation #19222773
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Sep 17, 2026 · fix by Sep 17, 2026 overdue · rent impairing · Violation #19222776
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Sep 2, 2026 · fix by Sep 2, 2026 overdue · rent impairing · Violation #19179724
- CBroken doors or locksProvide ready access to buildings heating system door locked at basementIssued Sep 2, 2026 · fix by Sep 8, 2026 overdue · Violation #19179725
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19164825
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 27, 2026 · fix by Sep 22, 2026 overdue · Violation #19164824
- BOther repairsProperly repair or replace the broken or defective bell/buzzer or intercom system from building entrance to the panel at east wall in the 3rd room from north…Issued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19155182
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19164826
- BOther repairsProperly repair or replace the broken or defective bell /buzzer or intercom system from building entrance to the panel at south wall in the private hallwayIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19155178
- BOther repairsProperly repair or replace the broken or defective counter balance at lower window sash at west wall in the 4th room from eastIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19155179
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and west wall in the bathroomIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19155180
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroomIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19155181
- BOther repairsProperly repair or replace the broken or defective bell buzzer system broken from building front entrance to phone in the entranceIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · Violation #19066198
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · Violation #19066197
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the kitchenIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · Violation #19066200
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchenIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · Violation #19066201
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 7th room from eastIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · Violation #19066202
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 26, 2026 · fix by Jun 21, 2026 overdue · Violation #18952109
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 26, 2025 · fix by Sep 21, 2025 overdue · Violation #18184346
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 26, 2025 · fix by Sep 21, 2025 overdue · Violation #18184347
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square feet at the ceiling in the bathroomIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18054145
- CBroken doors or locksRemove device preventing door from being self-closing door sweeper permanently installed at secondary egress door in the 1st room from eastIssued Mar 31, 2025 · fix by Apr 14, 2025 overdue · Violation #17800394
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 6, 2025 · fix by Mar 4, 2025 overdue · Violation #17673767
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 3, 2025 · fix by Mar 1, 2025 overdue · Violation #17664332
- BOther repairsProperly repair or replace the broken or defective bell buzzer intercom from building front entrance to panel at south wall in the foyerIssued Oct 3, 2024 · fix by Nov 7, 2024 overdue · Violation #17311355
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 20, 2024 · fix by Oct 16, 2024 overdue · Violation #17280369
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 25, 2024 · fix by Jul 21, 2024 overdue · Violation #17061432
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.