Housing violations · Harlem (North)
2308 Adam C Powell Boulevard, Manhattan
10030 · 17 apartments · 5 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs9
- Peeling paint and plaster7
- Mice or rats5
- Roaches5
- Leaks and water damage3
- Broken doors or locks3
- Lead paint3
- No heat or hot water2
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 123 closed · NYC typical: 87 days
from 127 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BOther repairsProperly repair with similar material the broken or defective hardwood floors in the 2nd room from east at southIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19326945
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water temperature exceeding the maximum allowable of 130 f at all hot water fixtures throughout in the…Issued Oct 22, 2026 · fix by Oct 28, 2026 overdue · Violation #19303804
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Oct 20, 2026 · fix by Nov 15, 2026 overdue · Violation #19303803
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19303802
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at northIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19248618
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east at northIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19248616
- COther repairsProperly repair or replace the broken or defective spring balance at lower sash at second window from south at east in the 2nd room from east at northIssued Oct 1, 2026 · fix by Oct 7, 2026 overdue · Violation #19248614
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 2nd room from east at northIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19248615
- COther repairsProperly repair or replace the broken or defective spring balance at lower sash at first window from south at east in the 2nd room from east at northIssued Oct 1, 2026 · fix by Oct 7, 2026 overdue · Violation #19248613
- BOther repairsProperly repair or replace the broken or defective hinges at base cabinet at south in the kitchenIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19248621
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19248620
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 2nd room from east at northIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19248619
- BOther repairsProperly repair or replace the broken or defective lower cabinets at south wall in the kitchenIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19253377
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Sep 28, 2026 · fix by Oct 24, 2026 overdue · rent impairing · Violation #19248622
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the kitchenIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19253356
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19253391
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19253350
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Sep 28, 2026 · fix by Oct 24, 2026 overdue · rent impairing · Violation #19253316
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 28, 2026 · fix by Oct 24, 2026 overdue · Violation #19253339
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from eastIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19253382
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the 2nd room from eastIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19253380
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the bathroomIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19253348
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 2nd room from eastIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19253383
- BOther repairsProperly repair or replace the broken or defective bell/buzzer inercom system from building front entrance to the panel at south wall in the kitchenIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19228396
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of scalding hot water exceeding maximum allowable temperature of 130 f at all hot water fixtuers in the entire…Issued Sep 21, 2026 · fix by Sep 27, 2026 overdue · Violation #19228390
- BOther repairsProperly repair or replace the broken or defective bell buzzer system from building front to south wall at kitchen in the entire apartmentIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · Violation #19066219
- BBroken doors or locksProperly repair or replace the broken or defective refrigerator door seal in the kitchenIssued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19069787
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at vestibule door , 1st storyIssued Jul 10, 2026 · fix by Jul 24, 2026 overdue · Violation #19069794
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 10, 2026 · fix by Aug 5, 2026 overdue · Violation #19069784
- BBroken doors or locksProperly repair or replace the broken or defective mailbox door and lockIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19037864
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 25, 2026 · fix by Jul 21, 2026 overdue · Violation #19028208
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Jun 25, 2026 · fix by Jul 21, 2026 overdue · rent impairing · Violation #19028205
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 5, 2026 · fix by Jul 1, 2026 overdue · Violation #18977895
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 6, 2026 · fix by Jun 1, 2026 overdue · Violation #18888990
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 6, 2026 · fix by Jun 1, 2026 overdue · Violation #18888989
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 18, 2023 · fix by Nov 11, 2023 overdue · Violation #16319677
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 18, 2023 · fix by Nov 11, 2023 overdue · Violation #16319676
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 18, 2023 · fix by Nov 11, 2023 overdue · Violation #16319678
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.