Housing violations · Harlem (North)
2310 Adam C Powell Boulevard, Manhattan
10030 · 10 apartments · 5 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs8
- No heat or hot water7
- Broken doors or locks7
- Roaches5
- Peeling paint and plaster4
- Mice or rats4
- Leaks and water damage3
- Electrical problems2
- Mold1
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 206 closed · NYC typical: 87 days
from 146 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding 130 degrees found water to be 147 degrees in the entire apartmentIssued Nov 10, 2026 · fix by Nov 16, 2026 · Violation #19359177
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 10, 2026 · fix by Dec 6, 2026 · Violation #19359178
- BOther repairsProperly repair or replace the broken or defective intercom system from building front to north wall panel in the private hallwayIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19359176
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color observed at ceiling and west wall in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341595
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19341598
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19341599
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and west wall in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341596
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at building entrance door , 1st storyIssued Oct 30, 2026 · fix by Nov 13, 2026 overdue · Violation #19334026
- COther repairs& 309 m/d law abate the nuisance consisting of uncapped steam riser in the private hallwayIssued Oct 30, 2026 · fix by Nov 5, 2026 overdue · Violation #19343347
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of consisting of scalding hot water exceeding the maximum temperatue of 130 degrees in the entire apartmentIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19330411
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of consisiting of scalding hot water exceeding the maximum temperature of 130 degrees in the entire apartmentIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19330406
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of consisting of scalding hot water temperature exceeding the maximum allowable of 130 degrees at all hot water…Issued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19330399
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective entrance door in the entranceIssued Oct 20, 2026 · fix by Nov 3, 2026 overdue · Violation #19278473
- CBroken doors or locksProvide ready access to buildings heating system locked door at cellar at boiler roomIssued Oct 20, 2026 · fix by Oct 26, 2026 overdue · Violation #19278472
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at building entrance doorIssued Oct 13, 2026 · fix by Oct 27, 2026 overdue · Violation #19293352
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 13, 2026 · fix by Nov 8, 2026 overdue · Violation #19290942
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 13, 2026 · fix by Nov 8, 2026 overdue · Violation #19290943
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the 5th room from east at northIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · rent impairing · Violation #19170016
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 5th room from east at northIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19170017
- BBroken doors or locksProperly repair or replace the broken or defective door at entrance (off hinges) in the 1st room from east at northIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19170018
- BBroken doors or locksProperly repair or replace the broken or defective entrance door in the 1st room from eastIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19147959
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Aug 27, 2026 · fix by Sep 22, 2026 overdue · Violation #19155258
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 21, 2026 · fix by Sep 16, 2026 overdue · Violation #19147964
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 21, 2026 · fix by Sep 16, 2026 overdue · Violation #19147963
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding the maximum allowable temperature of 130 degrees at all hot water fixtures in the entire…Issued Aug 19, 2026 · fix by Aug 25, 2026 overdue · Violation #19123664
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19123658
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 13, 2026 · fix by Aug 8, 2026 overdue · Violation #19065316
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 29, 2026 · fix by Jun 24, 2026 overdue · Violation #18959713
- BBroken doors or locksRefit room entrance door in the 1st room from eastIssued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18875247
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the private hallwayIssued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18875248
- BOther repairsProperly repair or replace the broken or defective intercom system from entrance to building to intercom system panel at west wall in the foyerIssued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18875249
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at round junction box at ceiling in the private hallwayIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18806435
- BLeaks and water damageRepair the roof so that it will not leak over ceiling in the 5th room from east at northIssued Apr 7, 2026 · fix by May 12, 2026 overdue · rent impairing · Violation #18760907
- BElectrical problemsReplace with new the missing electrical box cover at ceiling in the private hallwayIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18760909
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the 5th room from east at northIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18760908
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of scalding hot water above 130 degrees in the entire apartmentIssued Apr 7, 2026 · fix by Apr 13, 2026 overdue · Violation #18760904
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the private hallwayIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18760906
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding 130 degrees at all hot water fixtures in the entire apartmentIssued Jul 1, 2024 · fix by Jul 7, 2024 overdue · Violation #17084797
- BOther repairsProperly repair or replace the broken or defective bell and buzzer return system from building entrance to in the foyerIssued Apr 18, 2024 · fix by May 23, 2024 overdue · Violation #16823555
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.