Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Crown Heights (South)

1617 President Street, Brooklyn

11213 · 28 apartments · 4 stories · City Council district 35

By · Updated · Data from NYC HPD

C
20open immediately hazardous violations · 71 per 100 apartments
B56Hazardous, open
A9Non-hazardous, open
!85Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

3 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.

Open in Google Maps ↗

Who owns and manages it

Owning companyFLGSP 1617 President St LLC
Landlord (head officer or owner)Brayan Lemus

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    23
  2. Other repairs
    15
  3. Electrical problems
    9
  4. Lead paint
    8
  5. Missing smoke or CO detector
    8
  6. Broken doors or locks
    7
  7. Roaches
    5
  8. Leaks and water damage
    5
  9. Plumbing, sinks and toilets
    3
  10. Mice or rats
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C147 days
from 31 closed · NYC typical: 84 days
B123 days
from 95 closed · NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the private hallwayIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19254201
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 4th room from northIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19170470
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 28, 2026 · fix by Sep 23, 2026 overdue · Violation #19170469
  • C
    Electrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the bathroomIssued Aug 28, 2026 · fix by Sep 3, 2026 overdue · Violation #19170476
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from northIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19170471
  • B
    Other repairsProperly repair or replace the broken or defective counter balance at upper window sash in the kitchenIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19126299
  • B
    Other repairsRemove all encumbrances consisting of household item at public hall, 4th storyIssued Jun 25, 2026 · fix by Jul 30, 2026 overdue · rent impairing · Violation #19026728
  • B
    Broken doors or locksRefit closet entrance door at east and north in the private hallwayIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18750488
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 13, 2026 · fix by Apr 8, 2026 overdue · Violation #18705178
  • B
    Lead paint& 309 m/d law abate the nuisance consisting of key operated lock at door leading to fire escape window in the 1st room from north at eastIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18705181
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall and at ceiling in the 4th room from eastIssued Feb 27, 2026 · fix by Apr 3, 2026 overdue · Violation #18668977
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Feb 27, 2026 · fix by Apr 3, 2026 overdue · Violation #18668972
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at west wall in the bathroomIssued Feb 27, 2026 · fix by Apr 3, 2026 overdue · Violation #18668971
  • B
    Other repairsProperly repair or replace the broken or defective base cabinet floor at east wall in the kitchenIssued Feb 27, 2026 · fix by Apr 3, 2026 overdue · Violation #18668975
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall, west wall and at south wall in the kitchenIssued Feb 27, 2026 · fix by Apr 3, 2026 overdue · Violation #18668976
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 27, 2026 · fix by Mar 25, 2026 overdue · Violation #18668980
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 27, 2026 · fix by Mar 25, 2026 overdue · Violation #18668979
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the private hallwayIssued Feb 27, 2026 · fix by Apr 3, 2026 overdue · Violation #18668978
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Feb 27, 2026 · fix by Apr 3, 2026 overdue · Violation #18668974
  • C
    Broken doors or locks& 309 m/d law abate the nuisance consisting of exit door, in front of stair , at southeast section, sealed shut, 1st story, east yardIssued Sep 2, 2025 · fix by Sep 8, 2025 overdue · Violation #18196851
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Jul 1, 2025 · fix by Aug 5, 2025 overdue · Violation #18058563
  • B
    Broken doors or locksProperly repair or replace the broken or defective hinge on door at upper cabinet at east wall in the kitchenIssued Jul 1, 2025 · fix by Aug 5, 2025 overdue · Violation #18058570
  • B
    Electrical problemsReplace with new the missing cover for electrical switch at north wall in the kitchenIssued Jul 1, 2025 · fix by Aug 5, 2025 overdue · Violation #18058569
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor near radiator at west wall in the 1st room from eastIssued Jul 1, 2025 · fix by Aug 5, 2025 overdue · Violation #18058573
  • B
    Broken doors or locksReplace with new the missing knob assembly on door in the bathroomIssued Jul 1, 2025 · fix by Aug 5, 2025 overdue · Violation #18058567
  • B
    Broken doors or locksProperly repair or replace the broken or defective wood door in the bathroomIssued Jul 1, 2025 · fix by Aug 5, 2025 overdue · Violation #18058566
  • B
    Other repairsProperly secure the loose metal escutcheon plate for steam riser at ceiling in the bathroomIssued Jul 1, 2025 · fix by Aug 5, 2025 overdue · Violation #18058560
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Jul 1, 2025 · fix by Aug 5, 2025 overdue · Violation #18058559
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Jul 1, 2025 · fix by Aug 5, 2025 overdue · Violation #18058558
  • B
    Other repairsProperly secure the loose light fixture at ceiling in the foyerIssued Jul 1, 2025 · fix by Aug 5, 2025 overdue · Violation #18058557
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed wires for light fixture at ceiling in the foyerIssued Jul 1, 2025 · fix by Aug 5, 2025 overdue · Violation #18058556
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 4th room from eastIssued Jul 1, 2025 · fix by Jul 7, 2025 overdue · Violation #18058553
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 1, 2025 · fix by Jul 27, 2025 overdue · Violation #18058552
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at south wall in the 4th room from eastIssued Jul 1, 2025 · fix by Aug 5, 2025 overdue · Violation #18058580
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor near radiator at west wall in the 1st room from eastIssued Jul 1, 2025 · fix by Aug 5, 2025 overdue · Violation #18058576
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall, south wall in the 1st room from eastIssued Jul 1, 2025 · fix by Aug 5, 2025 overdue · Violation #18058575
  • B
    Electrical problemsReplace with new the missing cover for electrical outlet at south wall in the 1st room from eastIssued Jul 1, 2025 · fix by Aug 5, 2025 overdue · Violation #18058574
  • B
    Other repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Jul 1, 2025 · fix by Aug 5, 2025 overdue · rent impairing · Violation #18058572
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling. south wall in the bathroomIssued Jul 1, 2025 · fix by Aug 5, 2025 overdue · Violation #18058564
  • B
    Electrical problemsReplace with new the missing cover for electrical outlet at east wall in the kitchenIssued Jul 1, 2025 · fix by Aug 5, 2025 overdue · Violation #18058571
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective ceramic tiles above bathtub at west wall in the bathroomIssued Jul 1, 2025 · fix by Aug 5, 2025 overdue · Violation #18058562
  • B
    Leaks and water damageRepair the leaky and/or defective faucets continously running cold water at washbasin in the bathroomIssued Jul 1, 2025 · fix by Aug 5, 2025 overdue · Violation #18058561
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color south wall in the 4th room from eastIssued Jun 9, 2025 · fix by Jul 14, 2025 overdue · Violation #17941010
  • C
    Other repairsProperly repair or replace the broken or defective glass pane at lower lower sash in the kitchenIssued Jun 9, 2025 · fix by Jun 15, 2025 overdue · Violation #17941008
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Jun 9, 2025 · fix by Jul 14, 2025 overdue · Violation #17941006
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at electrical in the foyerIssued Jun 9, 2025 · fix by Jul 14, 2025 overdue · Violation #17941003
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Jun 9, 2025 · fix by Jul 14, 2025 overdue · Violation #17941007
  • B
    Electrical problemsReplace with new the missing covers at electrical outlet at north and east walls in the kitchenIssued Jun 9, 2025 · fix by Jul 14, 2025 overdue · Violation #17941009
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 23, 2025 · fix by Jun 18, 2025 overdue · Violation #17909423
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued May 23, 2025 · fix by Jun 27, 2025 overdue · Violation #17909425
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued May 23, 2025 · fix by Jun 27, 2025 overdue · Violation #17909424
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the foyerIssued May 23, 2025 · fix by Jun 27, 2025 overdue · Violation #17909422
  • B
    Electrical problemsReplace with new the missing electrical outlet cover at north in the kitchenIssued May 23, 2025 · fix by Jun 27, 2025 overdue · Violation #17909427
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchenIssued May 23, 2025 · fix by Jun 27, 2025 overdue · Violation #17909426
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroomIssued May 15, 2025 · fix by Jun 19, 2025 overdue · Violation #17894903
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued May 15, 2025 · fix by Jun 19, 2025 overdue · Violation #17894899
  • B
    Other repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued May 15, 2025 · fix by Jun 19, 2025 overdue · rent impairing · Violation #17894900
  • B
    Other repairsProperly repair or replace the broken or defective ligth fixture at ceiling in the foyerIssued May 15, 2025 · fix by Jun 19, 2025 overdue · Violation #17894901
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 15, 2025 · fix by Jun 10, 2025 overdue · Violation #17894902
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 4th room from eastIssued May 15, 2025 · fix by Jun 19, 2025 overdue · Violation #17894904

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

132017
122018
52020
242021
82022
172023
272024
982025
852026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 349 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 10:15 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.