Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Crown Heights (North)

805 Prospect Place, Brooklyn

11216 · 9 apartments · 4 stories · City Council district 36

By · Updated · Data from NYC HPD

C
52open immediately hazardous violations · 578 per 100 apartments
B80Hazardous, open
A25Non-hazardous, open
!148Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

23 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyCrownland Holdings LLC
Landlord (head officer or owner)Aj Kurland

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    58
  2. Peeling paint and plaster
    32
  3. Broken doors or locks
    22
  4. Leaks and water damage
    17
  5. Plumbing, sinks and toilets
    8
  6. Electrical problems
    6
  7. Mice or rats
    5
  8. Mold
    3
  9. Missing smoke or CO detector
    3
  10. Roaches
    2
  11. No heat or hot water
    1
  12. Lead paint
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C208 days
from 19 closed · NYC typical: 87 days
B637 days
from 20 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at 1st public hall bulkhead from northIssued Sep 11, 2026 · fix by Sep 25, 2026 overdue · Violation #19195293
  • C
    Other repairsProperly repair or replace the broken or defective roof coveringIssued Sep 11, 2026 · fix by Sep 17, 2026 overdue · Violation #19195297
  • B
    Other repairsRemove all encumbrances consisting of household items at public hall, 4th storyIssued Sep 11, 2026 · fix by Oct 16, 2026 overdue · rent impairing · Violation #19195285
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling at public hall, 4th storyIssued Sep 11, 2026 · fix by Sep 17, 2026 overdue · Violation #19195283
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of loose wires throughout roofIssued Sep 11, 2026 · fix by Oct 16, 2026 overdue · Violation #19195298
  • C
    Leaks and water damageRepair the roof so that it will not leak at ceiling at public hall, 4th storyIssued Sep 11, 2026 · fix by Sep 17, 2026 overdue · rent impairing · Violation #19195281
  • C
    Other repairsProperly repair or replace the broken or defective broken upper sash window pane at eastwall in the bathroomIssued Aug 27, 2026 · fix by Sep 2, 2026 overdue · Violation #19160063
  • C
    Other repairsProperly repair or replace the broken or defective window frame at eastwall in the bathroomIssued Aug 27, 2026 · fix by Sep 2, 2026 overdue · Violation #19160078
  • C
    Other repairsProperly repair or replace the broken or defective window pane at upper sash in the bathroomIssued Aug 25, 2026 · fix by Aug 31, 2026 overdue · Violation #19158584
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 4th storyIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19143426
  • B
    Broken doors or locksProperly repair or replace the broken or defective latchset at building entrance doorIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19143413
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the 5th room from northIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · rent impairing · Violation #19142641
  • B
    Broken doors or locksProperly secure the loose door at cabinet at east wall in the bathroomIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19142632
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the kitchenIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · rent impairing · Violation #19142633
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19142634
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 3rd room from northIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19142636
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from northIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19142640
  • B
    Broken doors or locksProperly repair or replace the broken or defective latchset at vestibule doorIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19143415
  • B
    Other repairsProperly repair with similar material the broken or defective fixed glass pane at building entranceIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19143416
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the building front yardIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19143417
  • B
    Other repairsRemove all encumbrances consisting of household items at public hall, 4th storyIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · rent impairing · Violation #19143423
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling at public hall, 4th storyIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · rent impairing · Violation #19143425
  • C
    MoldTrace and repair the source and abate the visible mold condition less than 15 sq feet at ceiling and east wall in the bathroomIssued Aug 14, 2026 · fix by Sep 9, 2026 overdue · Violation #19143987
  • C
    Leaks and water damageRepair the roof so that it will not leak over ceiling in the kitchenIssued Apr 20, 2026 · fix by Apr 26, 2026 overdue · rent impairing · Violation #18800869
  • C
    Plumbing, sinks and toiletsReplace the broken or defective rusting at bathtub in the bathroomIssued Apr 20, 2026 · fix by Apr 26, 2026 overdue · rent impairing · Violation #18800860
  • C
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling in the 5th room from northIssued Apr 20, 2026 · fix by Apr 26, 2026 overdue · Violation #18800877
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the foyerIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18800883
  • C
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Apr 20, 2026 · fix by Apr 26, 2026 overdue · Violation #18800854
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Apr 20, 2026 · fix by Apr 26, 2026 overdue · Violation #18800862
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18800864
  • C
    Leaks and water damageRepair the roof so that it will not leak over ceiling in the foyerIssued Apr 20, 2026 · fix by Apr 26, 2026 overdue · rent impairing · Violation #18800851
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 20, 2026 · fix by May 16, 2026 overdue · Violation #18800867
  • B
    Other repairsRemove all encumbrances consisting of household items at public hall, 4th storyIssued Apr 20, 2026 · fix by May 25, 2026 overdue · rent impairing · Violation #18800878
  • C
    Broken doors or locksProperly repair with similar material the broken or defective marble saddle at entry door in the bathroomIssued Apr 20, 2026 · fix by Apr 26, 2026 overdue · Violation #18800863
  • B
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures electric outlet at east wall in the 5th room from northIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18800873
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Apr 20, 2026 · fix by Apr 26, 2026 overdue · Violation #18800871
  • C
    Broken doors or locksProperly repair or replace the broken or defective glass pane at vestibule door at public hall, 1st storyIssued Apr 20, 2026 · fix by Apr 26, 2026 overdue · Violation #18806181
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiled in the kitchenIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18800868
  • B
    Other repairsCleanse and disinfect to the satisfaction of this department after removing the black soot at all walls and ceiling in the 2nd room from northIssued Mar 18, 2026 · fix by Apr 22, 2026 overdue · rent impairing · Violation #18723638
  • B
    Other repairsCleanse and disinfect to the satisfaction of this department after removing the black soot at all walls and ceiling in the bathroomIssued Mar 18, 2026 · fix by Apr 22, 2026 overdue · rent impairing · Violation #18723634
  • C
    Broken doors or locksProperly repair or replace the broken or defective glass pane at vestibule door at public hall, 1st storyIssued Mar 18, 2026 · fix by Mar 24, 2026 overdue · Violation #18723603
  • C
    Broken doors or locksProperly repair or replace the broken or defective lock at apartment entrance door in the entranceIssued Mar 2, 2026 · fix by Mar 8, 2026 overdue · Violation #18678907
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the private hallwayIssued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18678909
  • B
    Broken doors or locksRefit door at building entrance at public hall, 1st storyIssued Aug 18, 2025 · fix by Sep 22, 2025 overdue · Violation #18170683
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Jun 18, 2025 · fix by Jun 24, 2025 overdue · Violation #18044190
  • C
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling near boiler room at basementIssued Jun 18, 2025 · fix by Jun 24, 2025 overdue · Violation #18044237
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 18, 2025 · fix by Jul 14, 2025 overdue · Violation #18044254
  • C
    MoldTrace and repair the source and abate the visible mold condition at the east,south and north walls in the bathroomIssued Apr 10, 2025 · fix by May 6, 2025 overdue · Violation #17824981
  • C
    Plumbing, sinks and toiletsReplace the broken or defective porcelain enamel at bathtub in the bathroomIssued Dec 19, 2024 · fix by Dec 25, 2024 overdue · rent impairing · Violation #17568990
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Dec 19, 2024 · fix by Dec 25, 2024 overdue · Violation #17568986
  • C
    Other repairsReplace with new the missing metal screen below skylight at bulkhead at public hall, 4th storyIssued Dec 19, 2024 · fix by Dec 25, 2024 overdue · Violation #17569001
  • C
    Leaks and water damageRepair the roof so that it will not leak over ceiling in the kitchenIssued Dec 19, 2024 · fix by Dec 25, 2024 overdue · rent impairing · Violation #17568993
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the vegetable tree growing at exterior wall at window in the bathroomIssued Dec 19, 2024 · fix by Jan 23, 2025 overdue · Violation #17569004
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of at ceiling light fixture in the 5th room from northIssued Dec 19, 2024 · fix by Jan 23, 2025 overdue · Violation #17569002
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the kitchenIssued Nov 4, 2024 · fix by Dec 9, 2024 overdue · rent impairing · Violation #17393523
  • B
    Other repairsProperly repair with similar material the broken or defective metal cornice at front facade roof levelIssued Oct 23, 2024 · fix by Nov 27, 2024 overdue · Violation #17369315
  • C
    Other repairsProperly repair or replace the broken or defective upper glass pane at building front , 1st storyIssued Oct 22, 2024 · fix by Oct 28, 2024 overdue · Violation #17369314
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 22, 2024 · fix by Oct 28, 2024 overdue · Violation #17369263
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the entranceIssued Oct 22, 2024 · fix by Nov 26, 2024 overdue · Violation #17369281
  • C
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel at bathtub in the bathroomIssued Oct 22, 2024 · fix by Oct 28, 2024 overdue · Violation #17369288

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

422017
502018
182019
52020
82021
352022
612023
302024
72025
612026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 499 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.