Housing violations · Bedford-Stuyvesant (West)
100 Pulaski Street, Brooklyn
11206 · 16 apartments · 4 stories · City Council district 36
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
30 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs71
- Peeling paint and plaster34
- Broken doors or locks31
- Mold25
- Missing smoke or CO detector23
- Electrical problems20
- Mice or rats17
- Leaks and water damage16
- Plumbing, sinks and toilets13
- Roaches12
- No heat or hot water11
- Lead paint9
- Bedbugs3
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 16 closed · NYC typical: 87 days
NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376555
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19364057
- BElectrical problemsReplace with new the missing electrical outlet cover at the east wall in the 1st room from northIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19364065
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19364062
- CPlumbing, sinks and toiletsRepair the broken or defective connection at the waste pipe at the sink in the kitchenIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19364054
- BElectrical problemsReplace with new the missing electrical outlet cover at the west wall in the 1st room from northIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19364068
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19364060
- CLeaks and water damageRepair the leaky and/or defective faucets at bath tub in the bathroomIssued Sep 30, 2026 · fix by Oct 6, 2026 overdue · Violation #19261080
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft, at ceiling in the bathroomIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19261076
- COther repairsProperly repair or replace the broken or defective lower sash spring balance at north wall in the 1st room from north at eastIssued Sep 30, 2026 · fix by Oct 6, 2026 overdue · Violation #19261083
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19234340
- BPlumbing, sinks and toiletsReplace with new the missing ceramic tile over bathtub at west wall in the bathroomIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19234338
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19234368
- COther repairsProperly repair or replace the broken or defective ventilation system at east wall in the bathroomIssued Sep 22, 2026 · fix by Sep 28, 2026 overdue · Violation #19234304
- CElectrical problemsProvide child safety outlet cover at 1st story public hall at west wall at public hall, 1st storyIssued Sep 22, 2026 · fix by Sep 28, 2026 overdue · Violation #19234370
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, south and west wall in the kitchenIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19234334
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash at north wall in the 1st room from north at eastIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19234355
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19234359
- CLeaks and water damageRepair the leaky and/or defective faucets at bath tub in the bathroomIssued Sep 21, 2026 · fix by Sep 27, 2026 overdue · Violation #19234357
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling in the bathroomIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19234349
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 21, 2026 · fix by Oct 17, 2026 overdue · Violation #19234345
- COther repairsProperly repair or replace the broken or defective roofing materialIssued Sep 21, 2026 · fix by Sep 27, 2026 overdue · Violation #19234332
- CLeaks and water damageRepair the roof so that it will not leak at ceiling in the kitchenIssued Sep 21, 2026 · fix by Sep 27, 2026 overdue · rent impairing · Violation #19234328
- COther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Sep 21, 2026 · fix by Sep 27, 2026 overdue · Violation #19234320
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling and west wall in the bathroomIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19234312
- BOther repairsProperly repair with similar material the broken or defective brick and mortar at buildingfront , north exterior wallIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19173502
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Aug 28, 2026 · fix by Sep 3, 2026 overdue · Violation #19173492
- COther repairsProperly repair with similar material the broken or defective ceramic tile floor in the bathroomIssued Aug 28, 2026 · fix by Sep 3, 2026 overdue · Violation #19173494
- COther repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the bathroomIssued Jul 14, 2026 · fix by Jul 20, 2026 overdue · Violation #19073372
- CRoachesAbate the infestation consisting of roaches at public hallIssued Jul 14, 2026 · fix by Aug 9, 2026 overdue · Violation #19073389
- BMoldTrace and repair the source and abate the visible mold condition greather than 10 sq ft at ceiling in the bathroomIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19073400
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west and south wall in the kitchenIssued Jul 14, 2026 · fix by Jul 20, 2026 overdue · Violation #19073383
- COther repairsProperly secure the loose water closet in the bathroomIssued Jul 14, 2026 · fix by Jul 20, 2026 overdue · Violation #19073304
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective bathtub stopper in the bathroomIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19073321
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 14, 2026 · fix by Aug 9, 2026 overdue · Violation #19073326
- BBedbugsAbate the infestation consisting of bedbugs in the entire apartmentIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19073331
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 14, 2026 · fix by Aug 9, 2026 overdue · Violation #19073348
- CMoldTrace and repair the source and abate the visible mold condition greather than 30 sq ft for north,south east west wall and ceiling in the bathroomIssued Jul 14, 2026 · fix by Aug 9, 2026 overdue · Violation #19073361
- CPlumbing, sinks and toiletsProperly repair with similar material the broken or defective ceramic tiles at west wall at bathtub in the bathroomIssued Jul 14, 2026 · fix by Jul 20, 2026 overdue · Violation #19073377
- CLeaks and water damageRepair the roof so that it will not leak a ceiling in the kitchenIssued Jul 14, 2026 · fix by Jul 20, 2026 overdue · rent impairing · Violation #19073381
- BOther repairsProperly repair or replace the broken or defective ventilation at east wall in the bathroomIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19073403
- CElectrical problemsProvide a safe and adequate supply of electric service to the fixtures electrical outlet at south wall in the 1st room from north at eastIssued Jan 21, 2026 · fix by Jan 27, 2026 overdue · Violation #18585247
- COther repairsRepair the broken or defective connection at wasteline in the bathroomIssued Jan 21, 2026 · fix by Jan 27, 2026 overdue · Violation #18585237
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures electrical outlet in the private hallwayIssued Jan 21, 2026 · fix by Feb 25, 2026 overdue · Violation #18585244
- BOther repairsProperly repair or replace the broken or defective lower window sash balance in the 1st room from north at eastIssued Jan 21, 2026 · fix by Feb 25, 2026 overdue · Violation #18585239
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18536275
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18536274
- BMoldTrace and repair the source and abate the visible mold condition at ceiling in the bathroomIssued Dec 4, 2025 · fix by Jan 8, 2026 overdue · Violation #18487539
- BMoldTrace and repair the source and abate the visible mold condition at ceiling in the bathroomIssued Oct 28, 2025 · fix by Dec 2, 2025 overdue · Violation #18337187
- BMoldTrace and repair the source and abate the visible mold condition at ceiling in the bathroomIssued Oct 22, 2025 · fix by Nov 26, 2025 overdue · Violation #18316011
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 22, 2025 · fix by Oct 28, 2025 overdue · Violation #18316013
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 22, 2025 · fix by Oct 28, 2025 overdue · Violation #18316012
- CBroken doors or locksProperly repair or replace the broken or defective 2nd means of egress window lock in the 4th room from northIssued Aug 6, 2025 · fix by Aug 12, 2025 overdue · Violation #18143222
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 6, 2025 · fix by Sep 10, 2025 overdue · Violation #18143211
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective wood underneath sink in the kitchenIssued Aug 6, 2025 · fix by Sep 10, 2025 overdue · Violation #18143215
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18060713
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18060714
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 4, 2025 · fix by Apr 30, 2025 overdue · Violation #17808380
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 4, 2025 · fix by Apr 30, 2025 overdue · Violation #17808381
- BOther repairsProperly repair with similar material the broken or defective wood sub-floor in the kitchenIssued Mar 26, 2025 · fix by Apr 30, 2025 overdue · Violation #17791966
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.