Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Bedford-Stuyvesant (West)

100 Pulaski Street, Brooklyn

11206 · 16 apartments · 4 stories · City Council district 36

By · Updated · Data from NYC HPD

C
85open immediately hazardous violations · 531 per 100 apartments
B163Hazardous, open
A36Non-hazardous, open
!273Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

30 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyNEB LP
Landlord (head officer or owner)Jeffrey Dunston

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    71
  2. Peeling paint and plaster
    34
  3. Broken doors or locks
    31
  4. Mold
    25
  5. Missing smoke or CO detector
    23
  6. Electrical problems
    20
  7. Mice or rats
    17
  8. Leaks and water damage
    16
  9. Plumbing, sinks and toilets
    13
  10. Roaches
    12
  11. No heat or hot water
    11
  12. Lead paint
    9
  13. Bedbugs
    3

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C434 days
from 16 closed · NYC typical: 87 days
BNot enough data
NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376555
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19364057
  • B
    Electrical problemsReplace with new the missing electrical outlet cover at the east wall in the 1st room from northIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19364065
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19364062
  • C
    Plumbing, sinks and toiletsRepair the broken or defective connection at the waste pipe at the sink in the kitchenIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19364054
  • B
    Electrical problemsReplace with new the missing electrical outlet cover at the west wall in the 1st room from northIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19364068
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19364060
  • C
    Leaks and water damageRepair the leaky and/or defective faucets at bath tub in the bathroomIssued Sep 30, 2026 · fix by Oct 6, 2026 overdue · Violation #19261080
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft, at ceiling in the bathroomIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19261076
  • C
    Other repairsProperly repair or replace the broken or defective lower sash spring balance at north wall in the 1st room from north at eastIssued Sep 30, 2026 · fix by Oct 6, 2026 overdue · Violation #19261083
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19234340
  • B
    Plumbing, sinks and toiletsReplace with new the missing ceramic tile over bathtub at west wall in the bathroomIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19234338
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19234368
  • C
    Other repairsProperly repair or replace the broken or defective ventilation system at east wall in the bathroomIssued Sep 22, 2026 · fix by Sep 28, 2026 overdue · Violation #19234304
  • C
    Electrical problemsProvide child safety outlet cover at 1st story public hall at west wall at public hall, 1st storyIssued Sep 22, 2026 · fix by Sep 28, 2026 overdue · Violation #19234370
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, south and west wall in the kitchenIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19234334
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at lower window sash at north wall in the 1st room from north at eastIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19234355
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19234359
  • C
    Leaks and water damageRepair the leaky and/or defective faucets at bath tub in the bathroomIssued Sep 21, 2026 · fix by Sep 27, 2026 overdue · Violation #19234357
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling in the bathroomIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19234349
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 21, 2026 · fix by Oct 17, 2026 overdue · Violation #19234345
  • C
    Other repairsProperly repair or replace the broken or defective roofing materialIssued Sep 21, 2026 · fix by Sep 27, 2026 overdue · Violation #19234332
  • C
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the kitchenIssued Sep 21, 2026 · fix by Sep 27, 2026 overdue · rent impairing · Violation #19234328
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Sep 21, 2026 · fix by Sep 27, 2026 overdue · Violation #19234320
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling and west wall in the bathroomIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19234312
  • B
    Other repairsProperly repair with similar material the broken or defective brick and mortar at buildingfront , north exterior wallIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19173502
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Aug 28, 2026 · fix by Sep 3, 2026 overdue · Violation #19173492
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic tile floor in the bathroomIssued Aug 28, 2026 · fix by Sep 3, 2026 overdue · Violation #19173494
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the bathroomIssued Jul 14, 2026 · fix by Jul 20, 2026 overdue · Violation #19073372
  • C
    RoachesAbate the infestation consisting of roaches at public hallIssued Jul 14, 2026 · fix by Aug 9, 2026 overdue · Violation #19073389
  • B
    MoldTrace and repair the source and abate the visible mold condition greather than 10 sq ft at ceiling in the bathroomIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19073400
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west and south wall in the kitchenIssued Jul 14, 2026 · fix by Jul 20, 2026 overdue · Violation #19073383
  • C
    Other repairsProperly secure the loose water closet in the bathroomIssued Jul 14, 2026 · fix by Jul 20, 2026 overdue · Violation #19073304
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective bathtub stopper in the bathroomIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19073321
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 14, 2026 · fix by Aug 9, 2026 overdue · Violation #19073326
  • B
    BedbugsAbate the infestation consisting of bedbugs in the entire apartmentIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19073331
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 14, 2026 · fix by Aug 9, 2026 overdue · Violation #19073348
  • C
    MoldTrace and repair the source and abate the visible mold condition greather than 30 sq ft for north,south east west wall and ceiling in the bathroomIssued Jul 14, 2026 · fix by Aug 9, 2026 overdue · Violation #19073361
  • C
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective ceramic tiles at west wall at bathtub in the bathroomIssued Jul 14, 2026 · fix by Jul 20, 2026 overdue · Violation #19073377
  • C
    Leaks and water damageRepair the roof so that it will not leak a ceiling in the kitchenIssued Jul 14, 2026 · fix by Jul 20, 2026 overdue · rent impairing · Violation #19073381
  • B
    Other repairsProperly repair or replace the broken or defective ventilation at east wall in the bathroomIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19073403
  • C
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures electrical outlet at south wall in the 1st room from north at eastIssued Jan 21, 2026 · fix by Jan 27, 2026 overdue · Violation #18585247
  • C
    Other repairsRepair the broken or defective connection at wasteline in the bathroomIssued Jan 21, 2026 · fix by Jan 27, 2026 overdue · Violation #18585237
  • B
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures electrical outlet in the private hallwayIssued Jan 21, 2026 · fix by Feb 25, 2026 overdue · Violation #18585244
  • B
    Other repairsProperly repair or replace the broken or defective lower window sash balance in the 1st room from north at eastIssued Jan 21, 2026 · fix by Feb 25, 2026 overdue · Violation #18585239
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18536275
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18536274
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling in the bathroomIssued Dec 4, 2025 · fix by Jan 8, 2026 overdue · Violation #18487539
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling in the bathroomIssued Oct 28, 2025 · fix by Dec 2, 2025 overdue · Violation #18337187
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling in the bathroomIssued Oct 22, 2025 · fix by Nov 26, 2025 overdue · Violation #18316011
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 22, 2025 · fix by Oct 28, 2025 overdue · Violation #18316013
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 22, 2025 · fix by Oct 28, 2025 overdue · Violation #18316012
  • C
    Broken doors or locksProperly repair or replace the broken or defective 2nd means of egress window lock in the 4th room from northIssued Aug 6, 2025 · fix by Aug 12, 2025 overdue · Violation #18143222
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 6, 2025 · fix by Sep 10, 2025 overdue · Violation #18143211
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective wood underneath sink in the kitchenIssued Aug 6, 2025 · fix by Sep 10, 2025 overdue · Violation #18143215
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18060713
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18060714
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 4, 2025 · fix by Apr 30, 2025 overdue · Violation #17808380
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 4, 2025 · fix by Apr 30, 2025 overdue · Violation #17808381
  • B
    Other repairsProperly repair with similar material the broken or defective wood sub-floor in the kitchenIssued Mar 26, 2025 · fix by Apr 30, 2025 overdue · Violation #17791966

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

492017
1532018
542019
372020
332021
222022
172023
432024
202025
532026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 549 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.