Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Bedford-Stuyvesant (West)

299 Putnam Avenue, Brooklyn

11216 · 16 apartments · 4 stories · City Council district 36

By · Updated · Data from NYC HPD

C
7open immediately hazardous violations · 44 per 100 apartments
B10Hazardous, open
A2Non-hazardous, open
!19Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyOTA 299 PUTNAM LLC
Landlord (head officer or owner)Ellen Guccione

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    6
  2. Other repairs
    4
  3. Broken doors or locks
    2
  4. Plumbing, sinks and toilets
    1
  5. Mold
    1
  6. No heat or hot water
    1
  7. Leaks and water damage
    1
  8. Mice or rats
    1
  9. Missing smoke or CO detector
    1
  10. Missing window guards
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C157 days
from 4 closed · NYC typical: 87 days
BNot enough data
NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the 2nd room from northIssued Feb 10, 2025 · fix by Mar 17, 2025 overdue · Violation #17674900
  • C
    Other repairsProperly repair or replace the broken or defective radiator air valve releasing steam or water in the 2nd room from northIssued Feb 10, 2025 · fix by Feb 16, 2025 overdue · Violation #17674899
  • C
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Feb 10, 2025 · fix by Feb 16, 2025 overdue · Violation #17674901
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the kitchenIssued Feb 10, 2025 · fix by Mar 17, 2025 overdue · Violation #17674902
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallwayIssued Feb 10, 2025 · fix by Mar 17, 2025 overdue · Violation #17674904
  • B
    MoldTrace and repair the source and abate the visible mold condition approximately 2 sq ft at ceiling in the bathroomIssued Apr 2, 2024 · fix by May 7, 2024 overdue · Violation #16803709
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 4, 2023 · fix by Dec 4, 2023 overdue · rent impairing · Violation #16496046
  • C
    Broken doors or locksProvide ready access to buildings heating system boiler room door locked at boiler roomIssued Dec 4, 2023 · fix by Dec 10, 2023 overdue · Violation #16496047
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroomIssued Dec 4, 2023 · fix by Jan 8, 2024 overdue · Violation #16496048
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Dec 4, 2023 · fix by Jan 8, 2024 overdue · Violation #16496049
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 29, 2023 · fix by Dec 25, 2023 overdue · Violation #16458587
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Nov 29, 2023 · fix by Jan 3, 2024 overdue · Violation #16458585
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective bulkhead at public hallIssued Aug 29, 2022 · fix by Sep 12, 2022 overdue · Violation #15334068
  • B
    Other repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Sep 23, 2021 · fix by Oct 28, 2021 overdue · Violation #14569643
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items at 4th story balcony, 1stack from…Issued Dec 21, 2020 · fix by Jan 25, 2021 overdue · Violation #13949508
  • C
    Missing window guardsSection 27-2043.1 hmc install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health…Issued Dec 18, 2015 · fix by Jan 15, 2016 overdue · Violation #11038742
  • B
    Other repairsSection 27-2005 adm code properly repair the broken or defective counter balances at upper and lower window sashes in the 2nd room from northIssued Aug 14, 2015 · fix by Sep 18, 2015 overdue · Violation #10816978

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

12020
22021
32022
112023
22024
72025
12026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 91 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.