Housing violations · Bedford-Stuyvesant (West)
415 Putnam Avenue, Brooklyn
11216 · 4 apartments · 3 stories · City Council district 36
By Mantie Reid II · Updated · Data from NYC HPD
10 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster60
- Other repairs22
- Leaks and water damage17
- Roaches10
- Mice or rats10
- Mold8
- Missing smoke or CO detector4
- Broken doors or locks4
- Lead paint4
- Plumbing, sinks and toilets2
- Electrical problems1
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 16 closed · NYC typical: 87 days
from 18 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19187224
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19187223
- BOther repairsRemove all encumbrances consisting of household items at public hall, 1st storyIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · rent impairing · Violation #19173051
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft observed at north and east walls in the 1st room from north at eastIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19173024
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling, north and east walls in the 1st room from north at eastIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19173039
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, north and east walls in the 1st room from north at eastIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19173044
- BOther repairsProperly repair with similar material the broken or defective ceramic tile at east wall in the bathroomIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19133714
- BBroken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19133695
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq ft at ceiling , north and east walls in the 1st room from northIssued Aug 12, 2026 · fix by Sep 7, 2026 overdue · Violation #19133712
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north and east walls in the 1st room from northIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19133701
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19133713
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 12, 2026 · fix by Sep 7, 2026 overdue · Violation #19133691
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19133696
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sqft at ceiling, north and east walls in the 1st room from north at eastIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19057664
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 13, 2026 · fix by Aug 8, 2026 overdue · Violation #19057665
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak the ceiling in the 1st room from north at eastIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19057662
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19057671
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the bathroomIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19057670
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sqft at ceiling, north and east walls in the 1st room from north at eastIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19057669
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, west, north and east walls in the 1st room from north at eastIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19057667
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, west, north and east walls in the 1st room from north at eastIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19057663
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from north at eastIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19057668
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at west wall in the 4th room from east at northIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19039949
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19039947
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 30, 2026 · fix by Jul 26, 2026 overdue · Violation #19039945
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the private hallwayIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19039948
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at eastIssued Nov 12, 2025 · fix by Dec 17, 2025 overdue · Violation #18361610
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at eastIssued Nov 12, 2025 · fix by Dec 17, 2025 overdue · Violation #18361609
- BOther repairsProperly repair with similar material the broken or defective porcelain enamel finished bymethod of reglazing at bath tub in the bathroomIssued Apr 18, 2025 · fix by May 23, 2025 overdue · Violation #17841601
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and all ceilings in the entire apartmentIssued Apr 18, 2025 · fix by May 23, 2025 overdue · Violation #17841584
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and west wall at public hall, 3rd storyIssued Apr 18, 2025 · fix by May 23, 2025 overdue · Violation #17841695
- BElectrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the 4th room from northIssued Apr 18, 2025 · fix by May 23, 2025 overdue · Violation #17841633
- BOther repairsProperly repair or replace the broken or defective hard wood floor in the private hallwayIssued Apr 18, 2025 · fix by May 23, 2025 overdue · Violation #17841619
- BBroken doors or locksProperly repair or replace the broken or defective wood door in the 2nd room from northIssued Apr 18, 2025 · fix by May 23, 2025 overdue · Violation #17841613
- BBroken doors or locksProperly repair or replace the broken or defective wood door in the 1st room from northIssued Apr 18, 2025 · fix by May 23, 2025 overdue · Violation #17841611
- BOther repairsProperly repair with similar material the broken or defective caulking around bath tub in the bathroomIssued Apr 18, 2025 · fix by May 23, 2025 overdue · Violation #17841594
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Apr 18, 2025 · fix by May 14, 2025 overdue · rent impairing · Violation #17841575
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 18, 2025 · fix by May 14, 2025 overdue · Violation #17841576
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 18, 2025 · fix by May 14, 2025 overdue · Violation #17841574
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 4, 2024 · fix by Dec 30, 2024 overdue · Violation #17498014
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall and ceiling in the bathroomIssued Dec 4, 2024 · fix by Jan 8, 2025 overdue · Violation #17498019
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall, west wall and ceiling in the private hallwayIssued Dec 4, 2024 · fix by Jan 8, 2025 overdue · Violation #17498016
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at eastIssued Dec 4, 2024 · fix by Jan 8, 2025 overdue · Violation #17498021
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Dec 4, 2024 · fix by Jan 8, 2025 overdue · Violation #17498018
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 4, 2024 · fix by Dec 30, 2024 overdue · Violation #17498015
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at eastIssued Dec 4, 2024 · fix by Jan 8, 2025 overdue · Violation #17498020
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at south wall and ceiling in the bathroomIssued Nov 25, 2024 · fix by Dec 30, 2024 overdue · Violation #17439610
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from northIssued Nov 25, 2024 · fix by Dec 30, 2024 overdue · Violation #17439611
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall and ceiling in the bathroomIssued Nov 25, 2024 · fix by Dec 30, 2024 overdue · Violation #17439609
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 11, 2023 · fix by Nov 6, 2023 overdue · Violation #16283644
- BOther repairsProperly repair with similar material the broken or defective fire retardant material ceiling and west wall at public hall, 3rd storyIssued Oct 4, 2023 · fix by Nov 8, 2023 overdue · Violation #16283661
- BOther repairsRemove all encumbrances consisting of stroller , bicycle and household items at public hall, 3rd storyIssued Oct 4, 2023 · fix by Nov 8, 2023 overdue · rent impairing · Violation #16283664
- BMoldTrace and repair the source and abate the visible mold condition approximately 1 square foot at the ceiling in the bathroomIssued Aug 17, 2023 · fix by Sep 21, 2023 overdue · Violation #16176911
- BOther repairs& 309 m/d law abate the nuisance consisting of egress windows obstructed by air conditioners in the entire apartmentIssued Apr 19, 2023 · fix by May 24, 2023 overdue · Violation #15925446
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 17, 2023 · fix by Feb 12, 2023 overdue · Violation #15661945
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north, and east walls in the 1st room from northIssued Jan 17, 2023 · fix by Feb 21, 2023 overdue · Violation #15661955
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Oct 12, 2022 · fix by Nov 16, 2022 overdue · Violation #15412490
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall and west wall in the private hallwayIssued Oct 12, 2022 · fix by Nov 16, 2022 overdue · Violation #15412492
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in south wall closet in the 1st room from northIssued Oct 12, 2022 · fix by Nov 16, 2022 overdue · Violation #15412486
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north wall, south wall, east wall and west wall in the 1st room from northIssued Oct 12, 2022 · fix by Nov 16, 2022 overdue · Violation #15412485
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.