Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Harlem (North)

2400 Adam C Powell Boulevard, Manhattan

10030 · 54 apartments · 7 stories · City Council district 9

By · Updated · Data from NYC HPD

C
82open immediately hazardous violations · 152 per 100 apartments
B97Hazardous, open
A35Non-hazardous, open
!194Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

10 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyNORTHERN MAN EQUITIES
Landlord (head officer or owner)Craig Livingston

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    67
  2. Peeling paint and plaster
    34
  3. Broken doors or locks
    24
  4. Mice or rats
    22
  5. Roaches
    18
  6. Leaks and water damage
    12
  7. Mold
    12
  8. Electrical problems
    7
  9. Plumbing, sinks and toilets
    6
  10. Lead paint
    5
  11. No heat or hot water
    4
  12. Missing smoke or CO detector
    4

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C75 days
from 137 closed · NYC typical: 87 days
B60 days
from 95 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Nov 16, 2026 · rent impairing · Violation #19383687
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Nov 16, 2026 · Violation #19383689
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Nov 16, 2026 · rent impairing · Violation #19383690
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Nov 16, 2026 · Violation #19383691
  • C
    Lead paintProperly repair with similar material the broken or defective marble floor at intermediate landing leading to 2nd story at public hall stairs, 3rd storyIssued Nov 10, 2026 · fix by Nov 16, 2026 · Violation #19364166
  • B
    Other repairsProperly repair or replace the broken or defective lower window sash counter balance offset 1 at south wall in the 5th room from north at eastIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19357270
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from northIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19357274
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tile in the 2nd room from northIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19357273
  • B
    Other repairsProperly repair with similar material the broken or defective wood subfloor in the 2nd room from northIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19357272
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west and south walls in the 2nd room from northIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19357271
  • C
    Other repairsProperly repair or replace the broken or defective lower window sash counter balance in the 5th room from north at westIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19357269
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 9, 2026 · fix by Dec 5, 2026 · Violation #19357266
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 9, 2026 · fix by Dec 5, 2026 · Violation #19357265
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 4, 2026 · fix by Nov 4, 2026 overdue · rent impairing · Violation #19356481
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from north at eastIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19301351
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 5th room from north at eastIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19301350
  • B
    Other repairsProperly repair with similar material the broken or defective wood sub floor in the 5th room from north at eastIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19301352
  • C
    Other repairsProperly repair or replace the broken or defective lower window sash balance at south wall in the 5th room from north at westIssued Oct 13, 2026 · fix by Oct 19, 2026 overdue · Violation #19301361
  • B
    Other repairsProperly repair with similar material the broken or defective wood sub floor in the 2nd room from northIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19301365
  • C
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 8, 2026 · fix by Oct 14, 2026 overdue · Violation #19287961
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 3rd room from northIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19287972
  • B
    Broken doors or locksProperly repair with similar material the broken or defective wood frame at entrance door in the 2nd room from northIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19287971
  • C
    Other repairsProperly repair or replace the broken or defective glass pane at lower window sash in the 1st room from northIssued Oct 8, 2026 · fix by Oct 14, 2026 overdue · Violation #19287947
  • B
    Other repairsProperly repair with similar material the broken or defective wood sub floor in the 2nd room from northIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19287951
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19287937
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19287934
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchenIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19265128
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 2, 2026 · fix by Oct 28, 2026 overdue · Violation #19265126
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the kitchenIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19265129
  • B
    Other repairsProperly repair with similar material the broken or defective hardwood floor in the 2nd room from northIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19265125
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 2, 2026 · fix by Oct 28, 2026 overdue · Violation #19265124
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq. ft. at the east wall and ceiling in the bathroomIssued Aug 4, 2026 · fix by Aug 30, 2026 overdue · Violation #19122395
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at northIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19122384
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 4, 2026 · fix by Aug 30, 2026 overdue · Violation #19122363
  • B
    MoldTrace and repair the source and abate the visible mold condition less than square 10 sq ft. at ceiling, walls at east, north and south in the bathroomIssued Jul 29, 2026 · fix by Sep 2, 2026 overdue · Violation #19112720
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19094279
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from north at eastIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19094278
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 5th room from north at eastIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19094277
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from north at westIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19094276
  • B
    Other repairsProperly repair or replace the broken or defective intercom system at building entrance at public hall, 1st storyIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18806259
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles at public hall, 4th storyIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18806258
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Apr 6, 2026 · fix by Apr 30, 2026 overdue · Violation #18764062
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18769464
  • B
    Other repairsProperly repair with similar material the broken or defective concrete tread, 1st from bottom up at front stoop , 1st storyIssued Mar 31, 2026 · fix by May 5, 2026 overdue · Violation #18754800
  • B
    Broken doors or locksProperly repair or replace the broken or defective entrance door in the 1st room from east at northIssued Mar 6, 2026 · fix by Apr 10, 2026 overdue · Violation #18687705
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 1o square feet at the 1st closet from north at east wall wall in the 5th room…Issued Mar 6, 2026 · fix by Apr 10, 2026 overdue · Violation #18687703
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from east at northIssued Mar 6, 2026 · fix by Mar 12, 2026 overdue · Violation #18687704
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in drain pipe at sink in the kitchenIssued Mar 5, 2026 · fix by Apr 9, 2026 overdue · rent impairing · Violation #18684815
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 5, 2026 · fix by Mar 31, 2026 overdue · Violation #18684814
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the bathroomIssued Mar 5, 2026 · fix by Apr 9, 2026 overdue · Violation #18684817
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from east at northIssued Jan 20, 2026 · fix by Jan 26, 2026 overdue · Violation #18580801
  • B
    Other repairsProperly repair or replace the broken or defective bell buzzer from entrance to apartment in the entranceIssued Jan 6, 2026 · fix by Feb 10, 2026 overdue · Violation #18550663
  • B
    Other repairsProperly repair or replace the broken or defective bell buzzer at entrance to apartments at front areaway, 1st storyIssued Jan 6, 2026 · fix by Feb 10, 2026 overdue · Violation #18550674
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 6, 2026 · fix by Feb 1, 2026 overdue · Violation #18550658
  • B
    Broken doors or locksProperly repair or replace the broken or defective rubber gasket at refrigerator door in the kitchenIssued Dec 9, 2025 · fix by Jan 13, 2026 overdue · Violation #18493934
  • C
    Broken doors or locksProperly repair or replace the broken or defective mortise lock at building entrance door at public hall, 1st storyIssued Dec 8, 2025 · fix by Dec 14, 2025 overdue · Violation #18493948
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch at building front entrance door , 1st storyIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · Violation #18307039
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from northIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · Violation #18297610
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 16, 2025 · fix by Nov 11, 2025 overdue · Violation #18297611
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall, west wall in the 5th room from north at eastIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · Violation #18297606

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

942017
762018
1362019
2442020
2242021
1172022
512023
1362024
1692025
852026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 1,561 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.