Housing violations · Harlem (North)
2400 Adam C Powell Boulevard, Manhattan
10030 · 54 apartments · 7 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
10 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs67
- Peeling paint and plaster34
- Broken doors or locks24
- Mice or rats22
- Roaches18
- Leaks and water damage12
- Mold12
- Electrical problems7
- Plumbing, sinks and toilets6
- Lead paint5
- No heat or hot water4
- Missing smoke or CO detector4
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 137 closed · NYC typical: 87 days
from 95 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Nov 16, 2026 · rent impairing · Violation #19383687
- CBroken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Nov 16, 2026 · Violation #19383689
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Nov 16, 2026 · rent impairing · Violation #19383690
- CBroken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Nov 16, 2026 · Violation #19383691
- CLead paintProperly repair with similar material the broken or defective marble floor at intermediate landing leading to 2nd story at public hall stairs, 3rd storyIssued Nov 10, 2026 · fix by Nov 16, 2026 · Violation #19364166
- BOther repairsProperly repair or replace the broken or defective lower window sash counter balance offset 1 at south wall in the 5th room from north at eastIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19357270
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from northIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19357274
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tile in the 2nd room from northIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19357273
- BOther repairsProperly repair with similar material the broken or defective wood subfloor in the 2nd room from northIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19357272
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west and south walls in the 2nd room from northIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19357271
- COther repairsProperly repair or replace the broken or defective lower window sash counter balance in the 5th room from north at westIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19357269
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 9, 2026 · fix by Dec 5, 2026 · Violation #19357266
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 9, 2026 · fix by Dec 5, 2026 · Violation #19357265
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 4, 2026 · fix by Nov 4, 2026 overdue · rent impairing · Violation #19356481
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from north at eastIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19301351
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 5th room from north at eastIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19301350
- BOther repairsProperly repair with similar material the broken or defective wood sub floor in the 5th room from north at eastIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19301352
- COther repairsProperly repair or replace the broken or defective lower window sash balance at south wall in the 5th room from north at westIssued Oct 13, 2026 · fix by Oct 19, 2026 overdue · Violation #19301361
- BOther repairsProperly repair with similar material the broken or defective wood sub floor in the 2nd room from northIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19301365
- CLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 8, 2026 · fix by Oct 14, 2026 overdue · Violation #19287961
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 3rd room from northIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19287972
- BBroken doors or locksProperly repair with similar material the broken or defective wood frame at entrance door in the 2nd room from northIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19287971
- COther repairsProperly repair or replace the broken or defective glass pane at lower window sash in the 1st room from northIssued Oct 8, 2026 · fix by Oct 14, 2026 overdue · Violation #19287947
- BOther repairsProperly repair with similar material the broken or defective wood sub floor in the 2nd room from northIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19287951
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19287937
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19287934
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchenIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19265128
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 2, 2026 · fix by Oct 28, 2026 overdue · Violation #19265126
- BElectrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the kitchenIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19265129
- BOther repairsProperly repair with similar material the broken or defective hardwood floor in the 2nd room from northIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19265125
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 2, 2026 · fix by Oct 28, 2026 overdue · Violation #19265124
- CMoldTrace and repair the source and abate the visible mold condition greater than 10 sq. ft. at the east wall and ceiling in the bathroomIssued Aug 4, 2026 · fix by Aug 30, 2026 overdue · Violation #19122395
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at northIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19122384
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 4, 2026 · fix by Aug 30, 2026 overdue · Violation #19122363
- BMoldTrace and repair the source and abate the visible mold condition less than square 10 sq ft. at ceiling, walls at east, north and south in the bathroomIssued Jul 29, 2026 · fix by Sep 2, 2026 overdue · Violation #19112720
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19094279
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from north at eastIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19094278
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 5th room from north at eastIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19094277
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from north at westIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19094276
- BOther repairsProperly repair or replace the broken or defective intercom system at building entrance at public hall, 1st storyIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18806259
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles at public hall, 4th storyIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18806258
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Apr 6, 2026 · fix by Apr 30, 2026 overdue · Violation #18764062
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18769464
- BOther repairsProperly repair with similar material the broken or defective concrete tread, 1st from bottom up at front stoop , 1st storyIssued Mar 31, 2026 · fix by May 5, 2026 overdue · Violation #18754800
- BBroken doors or locksProperly repair or replace the broken or defective entrance door in the 1st room from east at northIssued Mar 6, 2026 · fix by Apr 10, 2026 overdue · Violation #18687705
- BMoldTrace and repair the source and abate the visible mold condition greater than 1o square feet at the 1st closet from north at east wall wall in the 5th room…Issued Mar 6, 2026 · fix by Apr 10, 2026 overdue · Violation #18687703
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from east at northIssued Mar 6, 2026 · fix by Mar 12, 2026 overdue · Violation #18687704
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in drain pipe at sink in the kitchenIssued Mar 5, 2026 · fix by Apr 9, 2026 overdue · rent impairing · Violation #18684815
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 5, 2026 · fix by Mar 31, 2026 overdue · Violation #18684814
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the bathroomIssued Mar 5, 2026 · fix by Apr 9, 2026 overdue · Violation #18684817
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from east at northIssued Jan 20, 2026 · fix by Jan 26, 2026 overdue · Violation #18580801
- BOther repairsProperly repair or replace the broken or defective bell buzzer from entrance to apartment in the entranceIssued Jan 6, 2026 · fix by Feb 10, 2026 overdue · Violation #18550663
- BOther repairsProperly repair or replace the broken or defective bell buzzer at entrance to apartments at front areaway, 1st storyIssued Jan 6, 2026 · fix by Feb 10, 2026 overdue · Violation #18550674
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 6, 2026 · fix by Feb 1, 2026 overdue · Violation #18550658
- BBroken doors or locksProperly repair or replace the broken or defective rubber gasket at refrigerator door in the kitchenIssued Dec 9, 2025 · fix by Jan 13, 2026 overdue · Violation #18493934
- CBroken doors or locksProperly repair or replace the broken or defective mortise lock at building entrance door at public hall, 1st storyIssued Dec 8, 2025 · fix by Dec 14, 2025 overdue · Violation #18493948
- BBroken doors or locksProperly repair or replace the broken or defective latch at building front entrance door , 1st storyIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · Violation #18307039
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from northIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · Violation #18297610
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 16, 2025 · fix by Nov 11, 2025 overdue · Violation #18297611
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall, west wall in the 5th room from north at eastIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · Violation #18297606
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.