Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Harlem (North)

2449 Adam C Powell Boulevard, Manhattan

10030 · 20 apartments · 6 stories · City Council district 9

By · Updated · Data from NYC HPD

C
23open immediately hazardous violations · 115 per 100 apartments
B14Hazardous, open
A20Non-hazardous, open
!35Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companySam City Master Tenant LLC
Landlord (head officer or owner)Karim Hutson

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    18
  2. Mold
    10
  3. Broken doors or locks
    9
  4. Mice or rats
    7
  5. Missing smoke or CO detector
    6
  6. Leaks and water damage
    2
  7. Roaches
    2
  8. No heat or hot water
    1
  9. Peeling paint and plaster
    1
  10. Lead paint
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C81 days
from 69 closed · NYC typical: 87 days
B373 days
from 23 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Broken doors or locksProvide ready access to buildings heating system locked at door at cellar at boiler roomIssued Nov 10, 2026 · fix by Nov 16, 2026 · Violation #19366154
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 10, 2026 · fix by Nov 10, 2026 overdue · rent impairing · Violation #19366153
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Nov 10, 2026 · fix by Nov 16, 2026 · Violation #19366157
  • B
    Other repairsProvide dwelling with a janitor or responsible person or janitorial serviceIssued Nov 10, 2026 · fix by Dec 15, 2026 · rent impairing · Violation #19366155
  • B
    Other repairsB) correct failure to install an internet capable temperature reporting device in one living room in apartment missingIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19344360
  • C
    Broken doors or locksRemove device preventing door from being self-closing sweeper at door in the entranceIssued Oct 7, 2026 · fix by Oct 21, 2026 overdue · Violation #19278258
  • B
    Other repairsAbate the nuisance consisting of pests. evidence of flies in the entire apartmentIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19278257
  • B
    Broken doors or locksProperly repair or replace the broken or defective mail box door for apartment 2c at public hall, 1st storyIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19278259
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 21, 2026 · fix by Sep 16, 2026 overdue · Violation #19149853
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 20, 2026 · fix by Aug 15, 2026 overdue · Violation #19082914
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 10, 2026 · fix by Aug 5, 2026 overdue · Violation #19069919
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at west and north walls in the 3rd room from eastIssued May 6, 2026 · fix by Jun 10, 2026 overdue · Violation #18889361
  • B
    MoldTrace and repair the source and abate the visible mold condition less than one square foot at south wall at bottom of closet door in the 4th room from northIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18715541
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 square feet at west and south walls in the 1st room from north at eastIssued Jan 22, 2026 · fix by Feb 26, 2026 overdue · Violation #18583397
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at west wall in the 3rd room from northIssued Jan 14, 2026 · fix by Feb 18, 2026 overdue · Violation #18568132
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at west wall and north wall at north east 3 room at apartment 2c at 2nd…Issued Jan 8, 2026 · fix by Feb 12, 2026 overdue · Violation #18553084
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Jan 8, 2026 · fix by Jan 14, 2026 overdue · Violation #18553077
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 30 sq ft at west wall and north wall in the 3rd room from north at westIssued Jan 8, 2026 · fix by Feb 3, 2026 overdue · Violation #18553083
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Dec 15, 2025 · fix by Dec 21, 2025 overdue · Violation #18504148
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Nov 26, 2025 · fix by Dec 22, 2025 overdue · rent impairing · Violation #18441237
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 10, 2025 · fix by Dec 6, 2025 overdue · Violation #18355727
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 16, 2025 · fix by Nov 11, 2025 overdue · Violation #18290648
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Oct 14, 2025 · fix by Oct 20, 2025 overdue · Violation #18290652
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at west wall in the 4th room from northIssued Jun 20, 2025 · fix by Jul 25, 2025 overdue · Violation #18051240
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at closet at north wall in the private hallwayIssued Jun 20, 2025 · fix by Jul 25, 2025 overdue · Violation #18051241
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 22, 2025 · fix by Jun 17, 2025 overdue · Violation #17909668
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at east closet walls in the 1st room from eastIssued May 6, 2025 · fix by Jun 10, 2025 overdue · Violation #17881868
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 square feet at north, south and east walls inside closet in the 5th room from…Issued Apr 16, 2025 · fix by May 21, 2025 overdue · Violation #17828107
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at cellarIssued Feb 20, 2025 · fix by Feb 26, 2025 overdue · Violation #17704399
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 20, 2025 · fix by Mar 18, 2025 overdue · Violation #17704395
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 10, 2025 · fix by Mar 8, 2025 overdue · Violation #17681115
  • C
    Lead paintProvide ready access to buildings heating system door leading to boiler room in cellar lockedIssued Feb 10, 2025 · fix by Feb 16, 2025 overdue · Violation #17681117
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Jan 31, 2025 · fix by Feb 6, 2025 overdue · Violation #17662743
  • C
    Broken doors or locksProvide ready access to buildings heating system boiler room door locked at cellarIssued Jan 31, 2025 · fix by Feb 6, 2025 overdue · Violation #17662742
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at…Issued Dec 9, 2024 · fix by Dec 15, 2024 overdue · Violation #17531727
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Nov 26, 2024 · fix by Dec 2, 2024 overdue · Violation #17442071
  • B
    Other repairsProperly repair or replace the broken or defective mailbox to apartment 2c at 1st public hall from east, 1st storyIssued Nov 22, 2024 · fix by Dec 27, 2024 overdue · Violation #17432160

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

122024
852025
682026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 172 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.