Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Flatbush

2116 Regent Place, Brooklyn

11226 · 6 apartments · 3 stories · City Council district 40

By · Updated · Data from NYC HPD

C
14open immediately hazardous violations · 233 per 100 apartments
B15Hazardous, open
A2Non-hazardous, open
!31Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyBROOKLYN PARK TERRACE LLC.
Landlord (head officer or owner)Joseph Soleimani

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    7
  2. Roaches
    6
  3. Mice or rats
    5
  4. Peeling paint and plaster
    3
  5. Mold
    2
  6. Broken doors or locks
    2
  7. Plumbing, sinks and toilets
    2
  8. Leaks and water damage
    2
  9. No heat or hot water
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C88 days
from 8 closed · NYC typical: 87 days
B117 days
from 6 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19275579
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19275578
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at 2nd window frame from east at south wall in the 5th room from…Issued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19234985
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 3, 2026 · fix by Sep 29, 2026 overdue · Violation #19184355
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 3, 2026 · fix by Sep 29, 2026 overdue · Violation #19184354
  • B
    Other repairsProperly repair or replace the broken or defective hydronic baseboard heater cover at east wall in the 5th room from north at eastIssued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18945772
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 5th room from north at eastIssued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18945771
  • B
    Other repairsProperly repair or replace the broken or defective mechanical ventilation system at ceiling in the bathroomIssued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18945767
  • B
    Other repairsProperly repair or replace the broken or defective baseboard heater cover at north wall in the bathroomIssued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18945766
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at 1st and 2nd window lower sash from east at south wall in the 5th room from north at westIssued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18945773
  • B
    Broken doors or locksProperly repair or replace the broken or defective wood door frame at entrance in the 5th room from north at eastIssued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18945770
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by the method of reglazing at bathtub in the bathroomIssued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18945769
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective silicone caulking at bathtub in the bathroomIssued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18945768
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 10, 2025 · fix by Aug 5, 2025 overdue · Violation #18080387
  • B
    Other repairsProperly secure the loose ventilation cover at ceiling in the bathroomIssued Jul 10, 2025 · fix by Aug 14, 2025 overdue · Violation #18080388
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 10, 2025 · fix by Aug 5, 2025 overdue · Violation #18080386
  • B
    Other repairsProperly repair or replace the broken or defective inoperative bell/buzzer/intercom form building front to receiving panel at north wall in the foyerIssued Jul 10, 2025 · fix by Aug 14, 2025 overdue · Violation #18088923
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10sq feet at under sink cabinet in the kitchenIssued Feb 3, 2025 · fix by Mar 10, 2025 overdue · Violation #17670029
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 15, 2024 · fix by Nov 19, 2024 overdue · Violation #17344612
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 15, 2024 · fix by Nov 10, 2024 overdue · Violation #17344611
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 15, 2024 · fix by Nov 10, 2024 overdue · Violation #17344613
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 4, 2024 · fix by Oct 30, 2024 overdue · Violation #17318843
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 4, 2024 · fix by Nov 8, 2024 overdue · Violation #17318841
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 4, 2024 · fix by Oct 30, 2024 overdue · Violation #17318842
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Sep 27, 2024 · fix by Sep 27, 2024 overdue · rent impairing · Violation #17304612
  • B
    Other repairsProperly repair or replace the broken or defective intercom system from building front entrance to west wall panel in the 1st room from north at eastIssued May 7, 2024 · fix by Jun 11, 2024 overdue · Violation #16933904
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 2, 2024 · fix by May 28, 2024 overdue · Violation #16933903
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of scalding hot water above 130 degrees in the bathroomIssued Feb 14, 2022 · fix by Feb 20, 2022 overdue · Violation #14824863
  • C
    Broken doors or locks& 309 m/d law abate the nuisance consisting of a key operated lockset installed at door with egress window in the 5th room from north at westIssued Oct 15, 2019 · fix by Oct 23, 2019 overdue · Violation #13335335

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

122017
72018
112019
32020
112022
162024
62025
242026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 159 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.