Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Harlem (North)

2473 Adam C Powell Boulevard, Manhattan

10030 · 13 apartments · 5 stories · City Council district 9

By · Updated · Data from NYC HPD

C
17open immediately hazardous violations · 131 per 100 apartments
B10Hazardous, open
A3Non-hazardous, open
!26Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companySam City Master Tenant LLC
Landlord (head officer or owner)Karim Hutson

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Broken doors or locks
    16
  2. Other repairs
    6
  3. Mice or rats
    5
  4. Peeling paint and plaster
    3

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C125 days
from 21 closed · NYC typical: 87 days
BNot enough data
NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Broken doors or locksRefit the door at entrance in the 1st room from eastIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19303941
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Oct 19, 2026 · fix by Nov 2, 2026 overdue · Violation #19303942
  • C
    Mice or ratsAbate the infestation consisting of mice at public hall, 1st storyIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19303943
  • C
    Broken doors or locksProperly repair or replace the broken or defective heavy duty locking device at building entrance doorIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19303944
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at east wall around compactor at public hall, 5th storyIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19270119
  • B
    Other repairsProperly repair or replace the broken or defective intercom system from entrance to building to intercom panel at north wall in the private hallwayIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19270121
  • B
    Broken doors or locksRefit the door in the entranceIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19270122
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at east wall at public hall, 4th storyIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19270117
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Oct 5, 2026 · fix by Oct 31, 2026 overdue · rent impairing · Violation #19270113
  • B
    Other repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19270114
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at east wall at public hall, 2nd storyIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19270115
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Sep 24, 2026 · fix by Oct 8, 2026 overdue · Violation #19242641
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latchset at building entrance doorIssued Sep 24, 2026 · fix by Oct 8, 2026 overdue · Violation #19242648
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Sep 24, 2026 · fix by Oct 8, 2026 overdue · Violation #19242647
  • B
    Broken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19227471
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set at building front entrance door , 1st storyIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19227470
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Sep 21, 2026 · fix by Oct 5, 2026 overdue · Violation #19227474
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at building front entrance door , 1st storyIssued Sep 21, 2026 · fix by Oct 5, 2026 overdue · Violation #19227468
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Mar 9, 2026 · fix by Apr 4, 2026 overdue · rent impairing · Violation #18688983
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Feb 21, 2025 · fix by Feb 27, 2025 overdue · Violation #17709871
  • C
    Broken doors or locksProperly repair or replace the broken or defective lock at building front door at public hall, 1st storyIssued Jan 13, 2025 · fix by Jan 19, 2025 overdue · Violation #17614425
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 6, 2025 · fix by Feb 1, 2025 overdue · Violation #17595297
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set at building enetrance door , 1st storyIssued Dec 26, 2024 · fix by Jan 30, 2025 overdue · Violation #17573787
  • C
    Broken doors or locksProvide ready access to buildings heating system door to boiler room locked at cellarIssued Dec 23, 2024 · fix by Dec 29, 2024 overdue · Violation #17573784
  • C
    Mice or ratsAbate the infestation consisting of rodents rats in the entire apartmentIssued Dec 23, 2024 · fix by Jan 18, 2025 overdue · rent impairing · Violation #17573785
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at…Issued Dec 20, 2024 · fix by Dec 26, 2024 overdue · Violation #17563684
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at cellar at boiler roomIssued Dec 19, 2024 · fix by Dec 25, 2024 overdue · Violation #17563680

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

132024
172025
232026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 57 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.