Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Bay Ridge

7100 Ridge Boulevard, Brooklyn

11209 · 37 apartments · 6 stories · City Council district 47

By · Updated · Data from NYC HPD

C
10open immediately hazardous violations · 27 per 100 apartments
B18Hazardous, open
A2Non-hazardous, open
!30Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.

1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyMETATLANTIC REALTY ASSOC. LP

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Lead paint
    8
  2. Mold
    6
  3. Peeling paint and plaster
    6
  4. Mice or rats
    4
  5. Other repairs
    2
  6. Broken doors or locks
    1
  7. Leaks and water damage
    1
  8. Roaches
    1
  9. Plumbing, sinks and toilets
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C77 days
from 73 closed · NYC typical: 87 days
B90 days
from 45 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch at hoppper door at compactor closet at public hall, 1st storyIssued Apr 6, 2026 · fix by Apr 20, 2026 overdue · Violation #18764268
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18530648
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18530651
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18530649
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18530647
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Jul 30, 2025 · fix by Aug 3, 2025 overdue · Violation #18126912
  • C
    Lead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Jul 30, 2025 · fix by Aug 3, 2025 overdue · Violation #18126911
  • B
    Other repairsProperly repair with similar material the broken or defective wall and base cabinets at west wall in the kitchenIssued May 6, 2025 · fix by Jun 10, 2025 overdue · Violation #17871975
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 6, 2025 · fix by Jun 1, 2025 overdue · Violation #17871974
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 15 sq ft at west and north wall in the bathroomIssued Mar 19, 2025 · fix by Apr 23, 2025 overdue · Violation #17776192
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at west wall in the bathroomIssued Mar 19, 2025 · fix by Apr 23, 2025 overdue · Violation #17765762
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at north wall, in the bathroomIssued Mar 18, 2025 · fix by Apr 22, 2025 overdue · Violation #17754407
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at the bathtub, in the bathroomIssued Mar 18, 2025 · fix by Apr 22, 2025 overdue · Violation #17754408
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling, in the 3rd room from north at westIssued Mar 18, 2025 · fix by Apr 22, 2025 overdue · Violation #17754412
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall inside the closet 1st from north at east, in the private hallwayIssued Mar 18, 2025 · fix by Apr 22, 2025 overdue · Violation #17754411
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color .at the ceiling, north and south walls, in the 1st room from north at westIssued Mar 18, 2025 · fix by Apr 22, 2025 overdue · Violation #17754405
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color wood floor tiles in the 3rd room from north at westIssued Mar 18, 2025 · fix by Apr 22, 2025 overdue · Violation #17754413
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall, in the kitchenIssued Mar 18, 2025 · fix by Apr 22, 2025 overdue · Violation #17754414
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 30, 2025 · fix by Feb 25, 2025 overdue · Violation #17660986
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 16, 2025 · fix by Feb 11, 2025 overdue · Violation #17623298
  • C
    Lead paint- certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead…Issued Jan 2, 2025 · fix by Jan 26, 2025 overdue · Violation #17597371
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jan 2, 2025 · fix by Jan 26, 2025 overdue · Violation #17597128
  • B
    MoldTrace and repair the source and abate the visible mold condition great than 10 sq.ft at north wall in the bathroomIssued Oct 31, 2024 · fix by Dec 5, 2024 overdue · Violation #17383638
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at west wall window frame in the bathroomIssued Oct 2, 2024 · fix by Nov 6, 2024 overdue · Violation #17312836
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 6, 2022 · fix by Oct 2, 2022 overdue · Violation #15346258
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 6, 2022 · fix by Oct 2, 2022 overdue · Violation #15346257
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in the bathtub in the bathroomIssued Sep 1, 2021 · fix by Oct 6, 2021 overdue · rent impairing · Violation #9237861
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 15 sqft north wall, east wall, 1st closet from east at south wall wall, 1st window…Issued Apr 8, 2019 · fix by May 13, 2019 overdue · Violation #12992734

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

362017
272018
152019
12020
152021
32022
42023
622024
932025
242026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 291 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.