Housing violations · Upper West Side (Central)
66 West 88 Street, Manhattan
10024 · 48 apartments · 6 stories · City Council district 6
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
4 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster20
- Other repairs10
- Lead paint7
- Roaches6
- Leaks and water damage4
- Broken doors or locks2
- Mold2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 33 closed · NYC typical: 87 days
from 43 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CRoachesAbate the infestation consisting of roaches at basementIssued Sep 4, 2026 · fix by Sep 30, 2026 overdue · Violation #19189943
- CRoachesAbate the infestation consisting of roaches at compactor closet, 1st storyIssued Sep 2, 2026 · fix by Sep 28, 2026 overdue · Violation #19179415
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 2, 2026 · fix by Sep 28, 2026 overdue · Violation #19179414
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at 1st compactor closet from east, 6th storyIssued Jul 17, 2026 · fix by Jul 31, 2026 overdue · Violation #19074622
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Mar 9, 2026 · fix by Apr 2, 2026 overdue · Violation #18700583
- COther repairsProperly repair or replace the broken or defective lower sash glass pane at window, 1-st from east at south in the 3rd room from north at westIssued Mar 6, 2026 · fix by Mar 12, 2026 overdue · Violation #18688031
- COther repairsProperly repair or replace the broken or defective lower sash glass pane at window, 2-nd from east at south in the 3rd room from north at westIssued Mar 6, 2026 · fix by Mar 12, 2026 overdue · Violation #18688032
- COther repairsProperly repair or replace the broken or defective lower sash glass pane at window, 2-nd from east at south in the 3rd room from north at eastIssued Mar 6, 2026 · fix by Mar 12, 2026 overdue · Violation #18688030
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Feb 10, 2026 · fix by Mar 6, 2026 overdue · Violation #18637128
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Feb 10, 2026 · fix by Mar 6, 2026 overdue · Violation #18637126
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Feb 10, 2026 · fix by Mar 6, 2026 overdue · Violation #18637127
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Feb 10, 2026 · fix by Mar 6, 2026 overdue · Violation #18637129
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Feb 10, 2026 · fix by Mar 6, 2026 overdue · Violation #18637124
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Feb 10, 2026 · fix by Mar 6, 2026 overdue · Violation #18637123
- BOther repairsProperly repair or replace the broken or defective lower sash pane of 2nd window from east at south in the 3rd room from north at westIssued Feb 10, 2026 · fix by Mar 17, 2026 overdue · Violation #18621263
- BOther repairsProperly repair or replace the broken or defective lower sash pane of 1st window from east at south in the 3rd room from north at westIssued Feb 10, 2026 · fix by Mar 17, 2026 overdue · Violation #18621262
- BOther repairsProperly repair or replace the broken or defective lower sash pane of 2nd window from east at south in the 3rd room from north at eastIssued Feb 10, 2026 · fix by Mar 17, 2026 overdue · Violation #18621261
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall, south wall in the 3rd room from north at eastIssued Feb 10, 2026 · fix by Mar 17, 2026 overdue · Violation #18621259
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, west wall, north wall, south wall, east wall, ceiling in the…Issued Feb 10, 2026 · fix by Mar 17, 2026 overdue · Violation #18621258
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall, north wall, south wall, west wall, south wall, north wall in the…Issued Feb 10, 2026 · fix by Mar 17, 2026 overdue · Violation #18621250
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall, north wall, south wall, east wall, west wall in the foyerIssued Feb 10, 2026 · fix by Mar 17, 2026 overdue · Violation #18621246
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall, east wall, north wall in the foyerIssued Feb 10, 2026 · fix by Mar 17, 2026 overdue · Violation #18621242
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, ceiling in the 3rd room from north at westIssued Feb 10, 2026 · fix by Mar 17, 2026 overdue · Violation #18621241
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall, south wall, east wall, west wall in the bathroomIssued Feb 10, 2026 · fix by Mar 17, 2026 overdue · Violation #18621253
- BMoldTrace and repair the source and abate the visible mold condition greater than 10sq at ceiling in the 2nd room from eastIssued Aug 29, 2025 · fix by Oct 3, 2025 overdue · Violation #18191719
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 29, 2025 · fix by Sep 24, 2025 overdue · Violation #18191720
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color window header ceiling in the 4th room from northIssued Apr 1, 2024 · fix by May 6, 2024 overdue · Violation #16776953
- BLeaks and water damageRepair the roof so that it will not leak over ceiling in the 1st room from north at eastIssued Feb 22, 2024 · fix by Mar 28, 2024 overdue · rent impairing · Violation #16689236
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at westIssued Feb 22, 2024 · fix by Feb 28, 2024 overdue · Violation #16689234
- CLeaks and water damageRepair the roof so that it will not leak over ceiling in the 1st room from north at westIssued Feb 22, 2024 · fix by Feb 28, 2024 overdue · rent impairing · Violation #16689233
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from north at westIssued Feb 22, 2024 · fix by Mar 28, 2024 overdue · Violation #16689235
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st room from north at eastIssued Feb 22, 2024 · fix by Mar 28, 2024 overdue · Violation #16689237
- BOther repairsProperly repair or replace the broken or defective glass at lower window sash at north wall in the kitchenIssued Jan 8, 2024 · fix by Feb 12, 2024 overdue · Violation #16563010
- BOther repairsProperly repair with similar material the broken or defective glass pane (hair line crack )at north wall in the 1st room from north at eastIssued Jan 4, 2024 · fix by Feb 8, 2024 overdue · Violation #16563014
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Jan 4, 2024 · fix by Feb 8, 2024 overdue · Violation #16563003
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 1st room from north at westIssued Jan 4, 2024 · fix by Feb 8, 2024 overdue · Violation #16563013
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jan 4, 2024 · fix by Feb 8, 2024 overdue · Violation #16563012
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 4, 2024 · fix by Jan 30, 2024 overdue · Violation #16563011
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the 1st room from north at eastIssued Jan 4, 2024 · fix by Feb 8, 2024 overdue · rent impairing · Violation #16563009
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st room from north at eastIssued Jan 4, 2024 · fix by Feb 8, 2024 overdue · Violation #16563008
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at westIssued Jan 4, 2024 · fix by Feb 8, 2024 overdue · Violation #16563005
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the 1st room from north at westIssued Jan 4, 2024 · fix by Feb 8, 2024 overdue · rent impairing · Violation #16563004
- BMoldTrace and repair the source and abate the visible mold condition at ceiling approx 2 sq.ft in the bathroomIssued Dec 15, 2023 · fix by Jan 19, 2024 overdue · Violation #16530316
- BOther repairsProperly repair with similar material the broken or defective hardwood floor in the kitchenIssued Jun 28, 2023 · fix by Aug 2, 2023 overdue · Violation #16069965
- BBroken doors or locksReplace with new the missing door at upper wall cabinet in the kitchenIssued Jun 28, 2023 · fix by Aug 2, 2023 overdue · Violation #16069966
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 28, 2023 · fix by Jul 24, 2023 overdue · Violation #16069967
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 2nd room from north at eastIssued Mar 31, 2023 · fix by May 5, 2023 overdue · Violation #15875421
- COther repairsReplace with new the broken or defective lower window sash pane at 1st window from west at north in the 2nd room from eastIssued Dec 8, 2022 · fix by Dec 14, 2022 overdue · Violation #15597143
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.