Housing violations · Upper West Side (Central)
28 West 97 Street, Manhattan
10025 · 247 apartments · 14 stories · City Council district 7
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Broken doors or locks29
- Other repairs29
- Peeling paint and plaster24
- Leaks and water damage8
- Mold7
- Plumbing, sinks and toilets5
- Missing smoke or CO detector2
- Electrical problems1
- Roaches1
- Mice or rats1
- Lead paint1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 3 closed · NYC typical: 87 days
from 7 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at bathtub in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · rent impairing · Violation #19292323
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292331
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall in the 1st room from east at northIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292324
- BBroken doors or locksProperly repair or replace the broken or defective lower door refrigerator gasket seal in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292325
- BOther repairsProperly repair or replace the broken or defective lower base cabinet draws at south wall in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292326
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292327
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from east at northIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292328
- BBroken doors or locksProperly repair with similar material the broken or defective wood door frame at entrance in the 2nd room from eastIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292329
- BOther repairsProperly repair or replace the broken or defective base cabinet at south wall in the kitchenIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19092007
- BBroken doors or locksRefit closet door at south wall in the 3rd room from eastIssued Jul 24, 2026 · fix by Aug 28, 2026 overdue · Violation #19092004
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west wall in the 3rd room from eastIssued Jul 24, 2026 · fix by Aug 28, 2026 overdue · Violation #19092008
- BMoldTrace and repair the source and abate the visible mold condition greater than 10sqft at east wall in the 1st room from east at northIssued Jul 24, 2026 · fix by Aug 28, 2026 overdue · Violation #19092005
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall in the 1st room from east at northIssued Jul 24, 2026 · fix by Aug 28, 2026 overdue · Violation #19091996
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at east wall in the 1st room from east at northIssued Jul 24, 2026 · fix by Aug 28, 2026 overdue · Violation #19091995
- BBroken doors or locksRefit entrance door in the 3rd room from eastIssued Jul 24, 2026 · fix by Aug 28, 2026 overdue · Violation #19092003
- BOther repairsProperly repair or replace the broken or defective ventilation system at east wall in the bathroomIssued Jul 24, 2026 · fix by Aug 28, 2026 overdue · Violation #19091994
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Jul 24, 2026 · fix by Aug 28, 2026 overdue · Violation #19091993
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from eastIssued Jul 24, 2026 · fix by Aug 28, 2026 overdue · Violation #19091991
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jul 24, 2026 · fix by Aug 28, 2026 overdue · Violation #19091990
- BBroken doors or locksRefit closet door at south wall in the private hallwayIssued Jul 24, 2026 · fix by Aug 28, 2026 overdue · Violation #19092000
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the private hallwayIssued Jul 24, 2026 · fix by Aug 28, 2026 overdue · Violation #19091999
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in wasteline at bathtub in the bathroomIssued Jul 24, 2026 · fix by Aug 28, 2026 overdue · rent impairing · Violation #19092009
- BBroken doors or locksRefit closet door at west wall in the private hallwayIssued Jul 24, 2026 · fix by Aug 28, 2026 overdue · Violation #19092001
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square feet at east wall in the 5th room from eastIssued May 12, 2026 · fix by Jun 16, 2026 overdue · Violation #18931455
- CElectrical problemsProvide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for…Issued Jan 22, 2026 · fix by Jan 22, 2026 overdue · Violation #18586848
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 5th room from eastIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18559988
- COther repairsReplace with new the missing vynle tile at floor in the 2nd room from eastIssued Jan 12, 2026 · fix by Jan 18, 2026 overdue · Violation #18559980
- BBroken doors or locksProperly repair or replace the broken or defective closet door at south wall in the private hallwayIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18559989
- BBroken doors or locksProperly repair or replace the broken or defective at lower cabinet door handle and drawer at south wall in the kitchenIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18559983
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective waste drain pipe at tub in the bathroomIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18559981
- BMoldTrace and repair the source and abate the visible mold condition less than 10sq feet at east wall in the 1st room from east at northIssued Mar 4, 2025 · fix by Apr 8, 2025 overdue · Violation #17743729
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sqft at east wall in the 1st room from eastIssued Jan 31, 2025 · fix by Mar 7, 2025 overdue · Violation #17668869
- BBroken doors or locksProperly repair or replace the broken or defective entrance door in the 2nd room from eastIssued Nov 4, 2024 · fix by Dec 9, 2024 overdue · Violation #17394651
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Nov 4, 2024 · fix by Dec 9, 2024 overdue · rent impairing · Violation #17394645
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink in the kitchenIssued Nov 4, 2024 · fix by Dec 9, 2024 overdue · Violation #17394653
- BBroken doors or locksRefit all slide doors at east and west closets in the private hallwayIssued Oct 3, 2024 · fix by Nov 7, 2024 overdue · Violation #17310684
- BBroken doors or locksRefit the door at entrance in the 3rd room from eastIssued Oct 3, 2024 · fix by Nov 7, 2024 overdue · Violation #17310678
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall in the 1st room from eastIssued Oct 3, 2024 · fix by Nov 7, 2024 overdue · Violation #17310681
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the private hallwayIssued Oct 3, 2024 · fix by Nov 7, 2024 overdue · Violation #17310680
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 3, 2024 · fix by Oct 29, 2024 overdue · Violation #17310686
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 3, 2024 · fix by Oct 29, 2024 overdue · Violation #17310685
- BOther repairsProperly repair or replace the broken or defective base cabinets at north and south walls in the kitchenIssued Oct 3, 2024 · fix by Nov 7, 2024 overdue · Violation #17310679
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at south wall in the 4th room from north at westIssued Sep 19, 2024 · fix by Oct 24, 2024 overdue · Violation #17279911
- BBroken doors or locksRefit closet door in the 3rd room from northIssued Sep 19, 2024 · fix by Oct 24, 2024 overdue · Violation #17279914
- BBroken doors or locksRefit closet door in the foyerIssued Sep 19, 2024 · fix by Oct 24, 2024 overdue · Violation #17279912
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 4th room from north at westIssued Sep 19, 2024 · fix by Oct 24, 2024 overdue · Violation #17279908
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink in the kitchenIssued Sep 19, 2024 · fix by Oct 24, 2024 overdue · Violation #17279909
- BBroken doors or locksProperly repair or replace the broken or defective door in the 3rd room from northIssued Sep 19, 2024 · fix by Oct 24, 2024 overdue · Violation #17279910
- BBroken doors or locksProperly secure the loose doorknob in the 2nd room from northIssued Sep 19, 2024 · fix by Oct 24, 2024 overdue · Violation #17279913
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak east wall in the 1st room from east at northIssued Aug 29, 2024 · fix by Oct 3, 2024 overdue · Violation #17225213
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at fire door to terrace in the 1st room from east at northIssued Aug 29, 2024 · fix by Sep 12, 2024 overdue · Violation #17225214
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from east at northIssued Aug 29, 2024 · fix by Oct 3, 2024 overdue · Violation #17225206
- BOther repairsProperly repair or replace the broken or defective wood draw at lower wall cabinet at south in the kitchenIssued Aug 29, 2024 · fix by Oct 3, 2024 overdue · Violation #17225217
- BBroken doors or locksProperly repair with similar material the broken or defective rubber gasket to lower refrigerator door in the kitchenIssued Aug 29, 2024 · fix by Oct 3, 2024 overdue · Violation #17225216
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall in the 1st room from east at northIssued Aug 29, 2024 · fix by Oct 3, 2024 overdue · Violation #17225212
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 3rd room from northIssued Nov 2, 2023 · fix by Dec 7, 2023 overdue · Violation #16344047
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the 1st room from northIssued Nov 2, 2023 · fix by Dec 7, 2023 overdue · Violation #16344043
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the private hallwayIssued Nov 2, 2023 · fix by Dec 7, 2023 overdue · Violation #16344045
- BLead paintRefit the door leading to balcony in the 3rd room from northIssued Nov 2, 2023 · fix by Dec 7, 2023 overdue · Violation #16344041
- BBroken doors or locksRefit closet door at south wall in the 1st room from northIssued Sep 6, 2023 · fix by Oct 11, 2023 overdue · Violation #16200892
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.