Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Crown Heights (North)

1149 St Johns Place, Brooklyn

11213 · 8 apartments · 4 stories · City Council district 35

By · Updated · Data from NYC HPD

C
49open immediately hazardous violations · 613 per 100 apartments
B140Hazardous, open
A24Non-hazardous, open
!213Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

17 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyJ JOHNSON LLC

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    90
  2. Peeling paint and plaster
    38
  3. Broken doors or locks
    19
  4. Leaks and water damage
    16
  5. Missing smoke or CO detector
    15
  6. Roaches
    9
  7. Electrical problems
    8
  8. Plumbing, sinks and toilets
    7
  9. No heat or hot water
    4
  10. Mice or rats
    3
  11. Mold
    2
  12. Lead paint
    2
  13. Bedbugs
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C95 days
from 56 closed · NYC typical: 87 days
B81 days
from 19 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Other repairsProperly repair or replace the broken or defective window spring balance at lower sash first window from west at north in the 1st room from northIssued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18673562
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of extension cords throughout the bedrooms and passage area in the entire apartmentIssued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18673564
  • B
    Other repairsProperly repair or replace the broken or defective at south wall in the 1st room from northIssued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18673563
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18673565
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from northIssued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18673570
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18673566
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall, north wall in the kitchenIssued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18673568
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from northIssued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18673571
  • C
    Other repairsProperly repair or replace the broken or defective window glass pane at upper sash, 3rd window from west at south in the 3rd room from northIssued Mar 2, 2026 · fix by Mar 8, 2026 overdue · Violation #18673573
  • B
    Other repairsProperly repair with similar material the broken or defective porcelain enamel finish by the method of reglazing in the bathroomIssued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18673574
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall and the ceiling in the foyerIssued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18673567
  • C
    Other repairsProperly repair with similar material the broken or defective wood sub. floor in the kitchenIssued Nov 14, 2025 · fix by Nov 20, 2025 overdue · Violation #18372226
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Nov 14, 2025 · fix by Dec 19, 2025 overdue · Violation #18372225
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the kitchenIssued Nov 14, 2025 · fix by Dec 19, 2025 overdue · Violation #18372223
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Nov 14, 2025 · fix by Dec 19, 2025 overdue · Violation #18372222
  • C
    Other repairsProperly repair with similar material the broken or defective sloping wood floor in the private hallwayIssued Nov 14, 2025 · fix by Nov 20, 2025 overdue · Violation #18372224
  • B
    Broken doors or locks& 309 m/d law abate the nuisance consisting of plexi-glass at building entrance door , 1st storyIssued Jul 15, 2025 · fix by Aug 19, 2025 overdue · Violation #18098116
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in bathtub in the bathroomIssued Apr 21, 2025 · fix by May 26, 2025 overdue · rent impairing · Violation #17842141
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 21, 2025 · fix by May 17, 2025 overdue · Violation #17842136
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor at public hall, 2nd storyIssued Feb 25, 2025 · fix by Mar 3, 2025 overdue · Violation #17722831
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from northIssued Jan 14, 2025 · fix by Feb 18, 2025 overdue · Violation #17625558
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 14, 2025 · fix by Feb 9, 2025 overdue · Violation #17625556
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 2nd room from northIssued Jan 14, 2025 · fix by Feb 18, 2025 overdue · Violation #17625557
  • B
    Broken doors or locksReplace with new the missing door knob in the 1st room from northIssued Dec 13, 2024 · fix by Jan 17, 2025 overdue · Violation #17554768
  • B
    Broken doors or locksReplace with new the missing door knob in the 2nd room from northIssued Dec 13, 2024 · fix by Jan 17, 2025 overdue · Violation #17554779
  • B
    Other repairsProperly repair with similar material the broken or defective sloping wood floor in the private hallwayIssued Dec 13, 2024 · fix by Jan 17, 2025 overdue · Violation #17554778
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Dec 13, 2024 · fix by Jan 17, 2025 overdue · Violation #17554767
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling and east wall at basement original violation 17064913 issued 18-jun-24 has been…Issued Oct 21, 2024 · fix by Nov 25, 2024 overdue · Violation #17363293
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in bathroom in the bathroomIssued Aug 21, 2024 · fix by Sep 25, 2024 overdue · Violation #17217802
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Aug 21, 2024 · fix by Sep 25, 2024 overdue · Violation #17217818
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling at basementIssued Jun 21, 2024 · fix by Jul 26, 2024 overdue · Violation #17064912
  • C
    Lead paintReplace or repair the self-closing doors that is missing or defective basement leading to rear yard at basementIssued Jun 21, 2024 · fix by Jul 5, 2024 overdue · Violation #17064909
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective boiler room at basementIssued Jun 21, 2024 · fix by Jul 5, 2024 overdue · Violation #17064914
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective basement at basementIssued Jun 21, 2024 · fix by Jul 5, 2024 overdue · Violation #17064907
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at basementIssued Jun 21, 2024 · fix by Jul 26, 2024 overdue · Violation #17064904
  • B
    Other repairsRemove all encumbrances consisting of stove at intermediate landing at public hall stairs, 4th storyIssued Apr 12, 2024 · fix by May 17, 2024 overdue · rent impairing · Violation #16861690
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 12, 2024 · fix by May 8, 2024 overdue · Violation #16861683
  • C
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the 4th room from northIssued Mar 7, 2024 · fix by Mar 13, 2024 overdue · rent impairing · Violation #16725629
  • B
    Other repairsRemove all encumbrances consisting of household items at public hall, 4th storyIssued Mar 7, 2024 · fix by Apr 11, 2024 overdue · rent impairing · Violation #16725633
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from northIssued Mar 7, 2024 · fix by Apr 11, 2024 overdue · Violation #16725630
  • B
    Other repairsRemove all encumbrances consisting of stove at public hall, 4th storyIssued Feb 28, 2024 · fix by Apr 3, 2024 overdue · rent impairing · Violation #16707990
  • C
    Other repairsProperly repair or replace the broken or defective roofIssued Feb 28, 2024 · fix by Mar 5, 2024 overdue · Violation #16707979
  • C
    Other repairsProperly repair with similar material the broken or defective brick and mortar at chimneyIssued Feb 28, 2024 · fix by Mar 5, 2024 overdue · Violation #16707982
  • C
    Other repairsProperly repair with similar material the broken or defective brick and mortar at air ventIssued Feb 28, 2024 · fix by Mar 5, 2024 overdue · Violation #16707986
  • C
    Other repairsProperly repair or replace the broken or defective cold radiator in the entire apartmentIssued Jan 3, 2024 · fix by Jan 9, 2024 overdue · Violation #16559210
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Dec 26, 2023 · fix by Jan 30, 2024 overdue · Violation #16546216
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Dec 26, 2023 · fix by Jan 30, 2024 overdue · Violation #16546218
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at basementIssued Dec 26, 2023 · fix by Jan 1, 2024 overdue · Violation #16546204
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Dec 14, 2023 · fix by Jan 18, 2024 overdue · Violation #16523569
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 14, 2023 · fix by Jan 9, 2024 overdue · Violation #16523567
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 14, 2023 · fix by Jan 9, 2024 overdue · Violation #16523572
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Dec 5, 2023 · fix by Dec 11, 2023 overdue · Violation #16502129
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 5, 2023 · fix by Dec 5, 2023 overdue · rent impairing · Violation #16502126
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 4, 2023 · fix by Dec 1, 2023 overdue · rent impairing · Violation #16494625
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Dec 4, 2023 · fix by Dec 10, 2023 overdue · Violation #16494626
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Nov 29, 2023 · fix by Dec 5, 2023 overdue · Violation #16477182
  • C
    Broken doors or locksProvide ready access to buildings heating system door to cellar lockedIssued Nov 29, 2023 · fix by Dec 5, 2023 overdue · Violation #16477183
  • B
    Other repairsReplace with new the missing escutcheon plate at steam riser at ceiling in the kitchenIssued Nov 24, 2023 · fix by Dec 29, 2023 overdue · Violation #16448048
  • B
    Other repairsReplace with new the missing escutcheon plate at steam riser at ceiling in the bathroomIssued Nov 24, 2023 · fix by Dec 29, 2023 overdue · Violation #16448044
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Nov 24, 2023 · fix by Dec 29, 2023 overdue · Violation #16448046

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

292017
242018
182019
262021
182022
1982023
312024
162025
172026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 494 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.