Housing violations · Prospect Heights
292 St Johns Place, Brooklyn
11238 · 16 apartments · 4 stories · City Council district 35
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster9
- Other repairs6
- Mice or rats4
- Lead paint4
- Roaches3
- Plumbing, sinks and toilets2
- Leaks and water damage2
- Broken doors or locks2
- Mold1
- Missing smoke or CO detector1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 39 closed · NYC typical: 84 days
from 53 closed · NYC typical: 110 days
This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BOther repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19353485
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19353484
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink in the kitchenIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19353483
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 5, 2026 · fix by Dec 1, 2026 · Violation #19353487
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 5, 2026 · fix by Dec 1, 2026 · Violation #19353486
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19295268
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 14, 2026 · fix by Nov 7, 2026 overdue · Violation #19302423
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 14, 2026 · fix by Nov 7, 2026 overdue · Violation #19302421
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 4th room from northIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18879234
- BBroken doors or locksProperly repair or replace the broken or defective intercom bell and return buzzer from building front entrance door to west wall in the private hallwayIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18879237
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall, ceiling in the foyerIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18879227
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18879229
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallwayIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18879230
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall, ceiling in the 6th room from northIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18879235
- BOther repairsProperly repair or replace the broken or defective broken glass at 2nd window upper sash from south at west wall in the 4th room from northIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18879238
- BOther repairsReplace with new the missing escutcheon plate at riser at north wall at ceiling in the bathroomIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18879239
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from northIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18879242
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall, north wall in the kitchenIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18879231
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued May 11, 2026 · fix by Jun 4, 2026 overdue · Violation #18924005
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective reglaze porcelain enamel surface at bathtub in the bathroomIssued Mar 16, 2026 · fix by Apr 20, 2026 overdue · Violation #18705261
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 13, 2026 · fix by Apr 8, 2026 overdue · Violation #18705266
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18705267
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18705263
- BOther repairsProperly repair or replace the broken or defective air valve for radiator in the 1st room from north at eastIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18705265
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 11, 2024 · fix by Feb 6, 2024 overdue · Violation #16583676
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 11, 2024 · fix by Feb 6, 2024 overdue · Violation #16583677
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Nov 15, 2022 · fix by Dec 9, 2022 overdue · Violation #15536849
- CRoachesAbate the infestation consisting of roachesIssued Sep 26, 2022 · fix by Oct 22, 2022 overdue · Violation #15389315
- CMice or ratsAbate the infestation consisting of miceIssued Sep 26, 2022 · fix by Oct 22, 2022 overdue · Violation #15389312
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 10:15 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.