Housing violations · Crown Heights (North)
1392 Sterling Place, Brooklyn
11213 · 23 apartments · 4 stories · City Council district 35
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
8 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs63
- Peeling paint and plaster42
- Leaks and water damage14
- Broken doors or locks12
- Roaches12
- Missing smoke or CO detector10
- Plumbing, sinks and toilets7
- Mold6
- Mice or rats5
- Bedbugs2
- Lead paint2
- Electrical problems1
- No heat or hot water1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 62 closed · NYC typical: 87 days
from 29 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the kitchenIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19173705
- COther repairsProperly repair or replace the broken or defective base cabinet at east wall in the kitchenIssued Aug 28, 2026 · fix by Sep 3, 2026 overdue · Violation #19174240
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from eastIssued Aug 28, 2026 · fix by Sep 3, 2026 overdue · Violation #19174262
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the kitchenIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19174237
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Aug 28, 2026 · fix by Sep 3, 2026 overdue · Violation #19174236
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north and west wall in the 1st room from north at eastIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19173707
- COther repairsProperly repair or replace the broken or defective window balance lower sash at south wall in the kitchenIssued Aug 28, 2026 · fix by Sep 3, 2026 overdue · Violation #19174244
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19173702
- COther repairsReplace with new the missing ceramic tiles at west wall in the bathroomIssued Aug 28, 2026 · fix by Sep 3, 2026 overdue · Violation #19174258
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the private hallwayIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19174265
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain glazing at bathtub in the bathroomIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19174254
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 28, 2026 · fix by Sep 3, 2026 overdue · Violation #19174252
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19063528
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19063529
- COther repairsProperly repair or replace the broken or defective membrane at roofIssued May 1, 2026 · fix by May 7, 2026 overdue · Violation #18838615
- COther repairsProperly repair or replace the broken or defective flashing at roofIssued May 1, 2026 · fix by May 7, 2026 overdue · Violation #18838616
- BBroken doors or locksProperly repair or replace the broken or defective loose hinge at door in the bathroomIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18815433
- BOther repairsProperly repair or replace the broken or defective counter balance at lower window sash in the kitchenIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18815437
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from northIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18815441
- BOther repairsAbate the nuisance consisting of excessive storage of material at entire apartment in the entire apartmentIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18815458
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 27, 2026 · fix by May 23, 2026 overdue · Violation #18815461
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 27, 2026 · fix by May 23, 2026 overdue · Violation #18815463
- BOther repairsProperly repair or replace the broken or defective upper wall cabinets at east wall in the kitchenIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18709246
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall behind stove in the kitchenIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18709253
- BOther repairsProperly repair or replace the broken or defective base cabinet at east wall in the kitchenIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18709250
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, south and west wall in the bathroomIssued Mar 12, 2026 · fix by Mar 18, 2026 overdue · Violation #18709212
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling south and west wall in the bathroomIssued Mar 12, 2026 · fix by Mar 18, 2026 overdue · Violation #18709213
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18709268
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18709269
- CBroken doors or locksProperly repair or replace the broken or defective glass at entrance door at public hall, 1st storyIssued Oct 20, 2025 · fix by Oct 26, 2025 overdue · Violation #18314890
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Mar 12, 2025 · fix by Mar 18, 2025 overdue · Violation #17752639
- CMoldTrace and repair the source and abate the visible mold condition at ceiling in the bathroomIssued Jan 31, 2025 · fix by Feb 26, 2025 overdue · Violation #17667762
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jan 31, 2025 · fix by Mar 7, 2025 overdue · Violation #17667764
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Dec 27, 2024 · fix by Jan 2, 2025 overdue · Violation #17584542
- COther repairsProperly repair or replace the broken or defective radiator shut off valve in the 1st room from north at westIssued Dec 27, 2024 · fix by Jan 2, 2025 overdue · Violation #17584154
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain glazing at bathtub in the bathroomIssued Dec 27, 2024 · fix by Jan 31, 2025 overdue · Violation #17584549
- COther repairsProperly repair or replace the broken or defective radiator shut off valve in the 3rd room from northIssued Dec 27, 2024 · fix by Jan 2, 2025 overdue · Violation #17584173
- COther repairsProperly repair or replace the broken or defective radiator air valve in the 2nd room from north at eastIssued Dec 27, 2024 · fix by Jan 2, 2025 overdue · Violation #17584155
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the bathroomIssued Dec 27, 2024 · fix by Jan 31, 2025 overdue · Violation #17584557
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from eastIssued Dec 27, 2024 · fix by Jan 2, 2025 overdue · Violation #17584540
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 15, 2024 · fix by Dec 20, 2024 overdue · Violation #17428109
- COther repairsMake safe by properly repairing the structural defect 6 deteriorating wood ceiling support joist at cellar, section at southIssued Jan 10, 2024 · fix by Jan 16, 2024 overdue · rent impairing · Violation #16587647
- COther repairsProperly repair with similar material the broken or defective wood sub- floor in the kitchenIssued Jan 10, 2024 · fix by Jan 16, 2024 overdue · Violation #16587640
- BMoldTrace and repair the source and abate the visible mold condition at south wall approx. 5 sq.ft in the 1st room from eastIssued Jan 17, 2023 · fix by Feb 21, 2023 overdue · Violation #15668487
- BOther repairsReplace with new the broken or defective marble saddle at entrance in the bathroomIssued Sep 20, 2022 · fix by Oct 25, 2022 overdue · Violation #15371139
- BBroken doors or locksReplace with new the broken or defective wood door at entrance in the bathroomIssued Sep 20, 2022 · fix by Oct 25, 2022 overdue · Violation #15371145
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles floor throughout in the entire apartmentIssued Sep 20, 2022 · fix by Oct 25, 2022 overdue · Violation #15371360
- COther repairsReplace with new the broken or defective glass pane at upper sash window at 2nd window from east at south in the 1st room from eastIssued Sep 20, 2022 · fix by Sep 26, 2022 overdue · Violation #15371369
- COther repairsReplace with new the broken or defective glass pane at lower sash window in the kitchenIssued Sep 20, 2022 · fix by Sep 26, 2022 overdue · Violation #15371366
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 20, 2022 · fix by Sep 26, 2022 overdue · Violation #15371143
- BOther repairsProperly repair the broken or defective counter balance at lower sash window in the kitchenIssued Sep 20, 2022 · fix by Oct 25, 2022 overdue · Violation #15371365
- BOther repairsFire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate in the entire apartmentIssued Sep 20, 2022 · fix by Oct 25, 2022 overdue · Violation #15371362
- BMoldTrace and repair the source and abate the visible mold condition at ceiling and all walls approx. 10 sq.ft in the 4th room from eastIssued Sep 20, 2022 · fix by Oct 25, 2022 overdue · Violation #15371370
- BOther repairsProperly repair the broken or defective counter balance at lower sash window at south wall in the 4th room from eastIssued Sep 20, 2022 · fix by Oct 25, 2022 overdue · Violation #15371371
- BOther repairsProperly repair the broken or defective window latch at west wall in the 4th room from eastIssued Sep 20, 2022 · fix by Oct 25, 2022 overdue · Violation #15371372
- BOther repairsProperly repair the broken or defective counter balance at upper sash window at west wall in the 4th room from eastIssued Sep 20, 2022 · fix by Oct 25, 2022 overdue · Violation #15371380
- BOther repairsProperly repair with similar material the broken or defective wood frame at entrance in the bathroomIssued Sep 20, 2022 · fix by Oct 25, 2022 overdue · Violation #15371146
- BBroken doors or locksReplace with new the broken or defective marble saddle at door in the entranceIssued Sep 20, 2022 · fix by Oct 25, 2022 overdue · Violation #15371363
- BOther repairsAbate the infestation consisting of vermin flies throughout in the entire apartmentIssued Sep 20, 2022 · fix by Oct 25, 2022 overdue · Violation #15371361
- CMoldTrace and repair the source and abate the visible mold condition at ceiling and all walls approx. 30 sq.ft in the bathroomIssued Sep 20, 2022 · fix by Oct 16, 2022 overdue · Violation #15371390
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.