Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Crown Heights (South)

245 Sullivan Place, Brooklyn

11225 · 40 apartments · 4 stories · City Council district 35

By · Updated · Data from NYC HPD

C
27open immediately hazardous violations · 68 per 100 apartments
B68Hazardous, open
A17Non-hazardous, open
!110Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

18 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.

Open in Google Maps ↗

Who owns and manages it

Owning company245 SULLIVAN AVE LLC
Landlord (head officer or owner)Ian Lagowitz

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    29
  2. Other repairs
    18
  3. Leaks and water damage
    14
  4. Broken doors or locks
    13
  5. Mold
    11
  6. Roaches
    5
  7. Lead paint
    4
  8. Plumbing, sinks and toilets
    4
  9. Missing smoke or CO detector
    4
  10. Electrical problems
    3
  11. No heat or hot water
    3
  12. Mice or rats
    2
  13. Bedbugs
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C93 days
from 40 closed · NYC typical: 84 days
B113 days
from 11 closed · NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Other repairsFire escape defective. adjust the dropladder so that it will slide easily in the guide rods at south at west court at fire escapeIssued Oct 27, 2026 · fix by Dec 1, 2026 · rent impairing · Violation #19328861
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at southIssued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19202169
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at southIssued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19202170
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Sep 10, 2026 · fix by Sep 24, 2026 overdue · Violation #19202171
  • B
    Other repairsFire escape defective. adjust the dropladder so that it will slide easily in the guide rods at south at west court at fire escapeIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · rent impairing · Violation #18980877
  • B
    MoldTrace and repair the source and abate the visible mold condition at less than 10 sqft on the north window frame in the bathroomIssued May 13, 2026 · fix by Jun 17, 2026 overdue · Violation #18932372
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 3rd room from east at northIssued Apr 16, 2026 · fix by Apr 22, 2026 overdue · Violation #18787124
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Apr 15, 2026 · fix by May 20, 2026 overdue · Violation #18786388
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling, section south at public hall stairs, 4th storyIssued Apr 15, 2026 · fix by May 20, 2026 overdue · rent impairing · Violation #18786389
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling, south and west wall, section north at public hall stairs, 4th…Issued Apr 15, 2026 · fix by May 20, 2026 overdue · Violation #18786390
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Apr 15, 2026 · fix by May 20, 2026 overdue · Violation #18786383
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Apr 15, 2026 · fix by May 20, 2026 overdue · Violation #18786384
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north and east walls in the kitchenIssued Apr 15, 2026 · fix by May 20, 2026 overdue · Violation #18786387
  • B
    MoldTrace and repair the source and abate the visible mold condition (less than 10-sq.ft) at ceiling in the bathroomIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18748620
  • B
    MoldTrace and repair the source and abate the visible mold condition (less than 10-sq. ft.) at south wall in the bathroomIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18748619
  • B
    Lead paint& 309 m/d law abate the nuisance consisting of key operated lock at entrance door, to room leading to fire escape window, west wall in the 1st room from eastIssued Jan 13, 2026 · fix by Feb 17, 2026 overdue · Violation #18566892
  • C
    MoldTrace and repair the source and abate the visible mold condition at greater than 30 sqft on the ceiling in the bathroomIssued Jan 13, 2026 · fix by Feb 8, 2026 overdue · Violation #18566889
  • B
    Broken doors or locksReplace with new the missing wood door saddle at entrance door west wall in the 1st room from eastIssued Jan 13, 2026 · fix by Feb 17, 2026 overdue · Violation #18566893
  • B
    Other repairsProperly secure the loose radiator from shut off valve at north wall in the 3rd room from eastIssued Jan 13, 2026 · fix by Feb 17, 2026 overdue · Violation #18566887
  • B
    Broken doors or locksProperly repair or replace the broken or defective cracked wood door saddle at entrance door ,south wall , in the kitchenIssued Jan 13, 2026 · fix by Feb 17, 2026 overdue · Violation #18566891
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at interior side of entrance door in the bathroomIssued Jan 5, 2026 · fix by Feb 9, 2026 overdue · Violation #18550901
  • B
    Broken doors or locksReplace with new the missing wood door saddle at entrane door , west wall , in the 1st room from eastIssued Jan 2, 2026 · fix by Feb 6, 2026 overdue · Violation #18542276
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Jan 2, 2026 · fix by Feb 6, 2026 overdue · Violation #18542277
  • B
    Broken doors or locksProperly repair or replace the broken or defective wood saddle at entrance door , south wall, in the bathroomIssued Jan 2, 2026 · fix by Feb 6, 2026 overdue · Violation #18542278
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 2, 2026 · fix by Jan 28, 2026 overdue · Violation #18542270
  • B
    Broken doors or locksReplace with new the missing loose wood saddle at entrance door , south wall, in the kitchenIssued Jan 2, 2026 · fix by Feb 6, 2026 overdue · Violation #18542272
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jan 2, 2026 · fix by Feb 6, 2026 overdue · Violation #18542281
  • B
    Electrical problemsProperly repair with similar material the broken or defective fire retardant materiasls plaster ceiling opened with exposed electrical,wire , south section, at…Issued Jan 2, 2026 · fix by Feb 6, 2026 overdue · Violation #18542282
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 2, 2026 · fix by Jan 28, 2026 overdue · Violation #18542271
  • B
    Other repairsProperly secure the loose radiator, at north wall , in the 3rd room from eastIssued Jan 2, 2026 · fix by Feb 6, 2026 overdue · Violation #18542275
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft at south wall in the 1st room from east at southIssued Dec 22, 2025 · fix by Jan 26, 2026 overdue · Violation #18528270
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the 4th room from eastIssued Dec 9, 2025 · fix by Jan 13, 2026 overdue · Violation #18484495
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from eastIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18443907
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18443913
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18443914
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 28, 2025 · fix by Dec 24, 2025 overdue · Violation #18443916
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 28, 2025 · fix by Dec 24, 2025 overdue · Violation #18443917
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Nov 28, 2025 · fix by Dec 22, 2025 overdue · Violation #18473898
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from eastIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18443906
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18443910
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Oct 21, 2025 · fix by Oct 27, 2025 overdue · Violation #18312207
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 21, 2025 · fix by Nov 25, 2025 overdue · Violation #18312204
  • B
    Plumbing, sinks and toiletsProvide adequate supply of cold water for the fixtures at sink in the kitchenIssued Oct 21, 2025 · fix by Nov 25, 2025 overdue · rent impairing · Violation #18312208
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Oct 21, 2025 · fix by Oct 27, 2025 overdue · Violation #18312210
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the bathroomIssued Oct 21, 2025 · fix by Nov 25, 2025 overdue · rent impairing · Violation #18312203
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Oct 21, 2025 · fix by Oct 27, 2025 overdue · Violation #18305881
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 20, 2025 · fix by Oct 19, 2025 overdue · rent impairing · Violation #18305880
  • B
    Broken doors or locksProperly repair or replace the broken or defective locking assembly in the entranceIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · Violation #18298504
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at basement at boiler roomIssued Oct 16, 2025 · fix by Oct 22, 2025 overdue · Violation #18298506
  • C
    Lead paintProvide ready access to buildings heating system locked door at 1st story leading to basement at boiler room, 1st storyIssued Oct 14, 2025 · fix by Oct 20, 2025 overdue · Violation #18294766
  • B
    Leaks and water damageRepair the roof so that it will not leak over the ceiling in the 3rd room from northIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · rent impairing · Violation #18294762
  • B
    Leaks and water damageRepair the roof so that it will not leak over the ceiling at bulkhead , 4th storyIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · rent impairing · Violation #18294767
  • B
    Peeling paint and plasterProperly repair with similar material the broken or defective fire retardant plaster at ceiling at bulkhead , 4th storyIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18294768
  • B
    Leaks and water damageRepair the roof so that it will not leak over the ceiling at public hall, 4th storyIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · rent impairing · Violation #18294770
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor and stairs at fire passage way at eastIssued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18281694
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at north, south, and east wall in the 1st room from north at westIssued Oct 6, 2025 · fix by Nov 10, 2025 overdue · Violation #18273591
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in closet in the 1st room from north at eastIssued Oct 6, 2025 · fix by Nov 10, 2025 overdue · rent impairing · Violation #18273465
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in closet in the 1st room from north at eastIssued Oct 6, 2025 · fix by Nov 10, 2025 overdue · Violation #18273466
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq.ft at west in the 1st room from north at westIssued Oct 6, 2025 · fix by Nov 10, 2025 overdue · Violation #18273595
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north, south, and east wall in the 1st room from north at westIssued Oct 6, 2025 · fix by Nov 10, 2025 overdue · Violation #18273593

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

402017
92018
192019
392020
162021
92022
272024
892025
512026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 1,299 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 4:16 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.