Housing violations · Harlem (South)
113 West 113 Street, Manhattan
10026 · 10 apartments · 5 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
5 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster9
- Roaches5
- Mice or rats5
- No heat or hot water4
- Leaks and water damage3
- Mold2
- Plumbing, sinks and toilets2
- Missing smoke or CO detector2
- Other repairs1
- Electrical problems1
- Broken doors or locks1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 80 closed · NYC typical: 87 days
from 160 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Nov 16, 2026 · Violation #19375742
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Nov 16, 2026 · Violation #19375743
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of scalding hot water exceeding 130 degrees ferenhignt in the entire apartmentIssued Nov 16, 2026 · Violation #19375744
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color opening plaster walls & ceiling on east window at north wall in the 5th room…Issued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19288082
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding the maximum temperature requirement of 130 degrees fahrenheit in the kitchenIssued Oct 8, 2026 · fix by Oct 14, 2026 overdue · Violation #19288088
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 25, 2026 · fix by Sep 20, 2026 overdue · Violation #19156643
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 9, 2026 · fix by Aug 4, 2026 overdue · Violation #19057439
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the at centre inner court at air shaftIssued Jul 1, 2026 · fix by Aug 5, 2026 overdue · Violation #19036274
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Jun 26, 2026 · fix by Jul 22, 2026 overdue · rent impairing · Violation #19029328
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19021555
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 22, 2026 · fix by Jul 18, 2026 overdue · Violation #19021554
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued May 29, 2026 · fix by Jun 24, 2026 overdue · rent impairing · Violation #18963970
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued May 28, 2026 · fix by Jun 23, 2026 overdue · rent impairing · Violation #18957624
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued May 5, 2026 · fix by Jun 9, 2026 overdue · Violation #18827974
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued May 5, 2026 · fix by May 31, 2026 overdue · rent impairing · Violation #18827969
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the 1st room from northIssued Apr 1, 2026 · fix by May 6, 2026 overdue · Violation #18751131
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 10, 2025 · fix by Nov 8, 2025 overdue · rent impairing · Violation #18354206
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 square feet at the ceiling, east wall, and west wall in the private hallwayIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18288577
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 14, 2025 · fix by Nov 9, 2025 overdue · Violation #18288578
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at east wall and south wall in the kitchenIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18134687
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall and south wall in the kitchenIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18134688
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at electrical fixture at ceiling in the private hallwayIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18134690
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding the maximum temperature requirement of 130 degrees fahrenheit in the entire apartmentIssued Aug 4, 2025 · fix by Aug 10, 2025 overdue · Violation #18134721
- BBroken doors or locksReplace with new the missing door at upper base cabinet at south wall in the kitchenIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18134689
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18134669
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Mar 11, 2025 · fix by Apr 15, 2025 overdue · Violation #17744424
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Mar 11, 2025 · fix by Apr 15, 2025 overdue · Violation #17744419
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 11, 2025 · fix by Apr 6, 2025 overdue · Violation #17744418
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 2, 2023 · fix by Nov 28, 2023 overdue · Violation #16344362
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.