Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · East Flatbush-Remsen Village

184 Tapscott Street, Brooklyn

11212 · 16 apartments · 4 stories · City Council district 41

By · Updated · Data from NYC HPD

C
12open immediately hazardous violations · 75 per 100 apartments
B5Hazardous, open
A1Non-hazardous, open
!18Past the fix-by date

On average, NYC buildings have 19.8 open class C violations per 100 apartments. This building has more.

5 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.

Open in Google Maps ↗

Who owns and manages it

Owning companyNYC PACT PRESERVATION PARTNERS LLC

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Broken doors or locks
    5
  2. No heat or hot water
    5
  3. Other repairs
    3
  4. Peeling paint and plaster
    2
  5. Leaks and water damage
    1
  6. Mice or rats
    1
  7. Roaches
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C30 days
from 3 closed · NYC typical: 84 days
BNot enough data
NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from east at northIssued Dec 13, 2024 · fix by Jan 17, 2025 overdue · Violation #17551192
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling ceiling in the 1st room from east at northIssued Dec 13, 2024 · fix by Dec 19, 2024 overdue · Violation #17551191
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 1st fire escape from north at east, 2nd storyIssued Apr 29, 2024 · fix by Jun 3, 2024 overdue · Violation #16925094
  • B
    Other repairsProperly repair or replace the broken or defective lower sash window, 1st window from north at east in the 1st room from east at northIssued Mar 4, 2024 · fix by Apr 8, 2024 overdue · Violation #16713271
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door. at boiler roomIssued Mar 4, 2024 · fix by Mar 10, 2024 overdue · Violation #16713270
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Mar 4, 2024 · fix by Mar 3, 2024 overdue · rent impairing · Violation #16713269
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Mar 4, 2024 · fix by Mar 3, 2024 overdue · rent impairing · Violation #16713268
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 1, 2024 · fix by Mar 27, 2024 overdue · Violation #16711677
  • C
    Broken doors or locksProvide ready access to buildings heating system door looked at 1st boiler room from eastIssued Mar 1, 2024 · fix by Mar 7, 2024 overdue · Violation #16711675
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 1, 2024 · fix by Mar 27, 2024 overdue · Violation #16711676
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Mar 1, 2024 · fix by Mar 1, 2024 overdue · rent impairing · Violation #16711674
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door. at boiler roomIssued Feb 28, 2024 · fix by Mar 5, 2024 overdue · Violation #16704493
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 28, 2024 · fix by Feb 28, 2024 overdue · rent impairing · Violation #16704492
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 26, 2024 · fix by Feb 24, 2024 overdue · rent impairing · Violation #16696410
  • B
    Broken doors or locksProperly repair or replace the broken or defective locking mechanism at door in the entranceIssued Feb 26, 2024 · fix by Apr 1, 2024 overdue · Violation #16696413
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked to cellar at public hall, 1st storyIssued Feb 26, 2024 · fix by Mar 3, 2024 overdue · Violation #16696412
  • B
    Other repairsProvide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day…Issued Jun 12, 2013 · fix by Jul 17, 2013 overdue · Violation #9864787

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

212024
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 22 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 27, 2026 at 9:30 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.