Housing violations · Harlem (South)
265 West 114 Street, Manhattan
10026 · 115 apartments · 5 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.
5 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster13
- Other repairs9
- Leaks and water damage8
- Mold5
- Broken doors or locks5
- Roaches3
- Mice or rats2
- No heat or hot water1
- Missing smoke or CO detector1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 32 closed · NYC typical: 87 days
from 40 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 1st room from northIssued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19217022
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 1st room from northIssued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19217020
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the private hallwayIssued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19217021
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north at eastIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192580
- BMoldTrace and repair the source and abate the visible mold condition greater than 10sq ft at ceiling in the kitchenIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192579
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at westIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19189936
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the 2nd room from north at westIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · rent impairing · Violation #19189935
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from north at eastIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19189929
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 4, 2026 · fix by Sep 30, 2026 overdue · Violation #19189938
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the kitchenIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · rent impairing · Violation #19189933
- CLeaks and water damageRepair the roof so that it will not leak at ceiling in the 2nd room from north at eastIssued Sep 4, 2026 · fix by Sep 10, 2026 overdue · rent impairing · Violation #19189927
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock at apartment entrance door in the entranceIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19189928
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at east wall in the kitchenIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19189934
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall and ceiling in the kitchenIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19189932
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at eastIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19189930
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · rent impairing · Violation #19189937
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at centerIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19065887
- BMoldTrace and repair the source and abate the visible mold condition more than 10 sq ft at ceiling in the 2nd room from east at centerIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19065886
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 13, 2026 · fix by Aug 8, 2026 overdue · Violation #19065888
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north at centerIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18991749
- BOther repairsProperly repair or replace the broken or defective spring balance at lower and upper sashes at 1st window from east at south in the 3rd room from north at westIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18991748
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the 1st room from northIssued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18730010
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 13, 2026 · fix by Feb 12, 2026 overdue · rent impairing · Violation #18639171
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall in the bathroomIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18576074
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 20, 2026 · fix by Feb 15, 2026 overdue · Violation #18576075
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 20, 2026 · fix by Feb 15, 2026 overdue · Violation #18576076
- BOther repairsProperly repair or replace the broken or defective base wood cabinet in the kitchenetteIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18576078
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west , south wall in the foyerIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18576079
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at southIssued Aug 11, 2025 · fix by Sep 15, 2025 overdue · Violation #18146606
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the kitchenIssued Aug 11, 2025 · fix by Sep 15, 2025 overdue · Violation #18146608
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north at eastIssued Aug 8, 2025 · fix by Sep 12, 2025 overdue · Violation #18139993
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 30, 2023 · fix by Sep 25, 2023 overdue · Violation #16190636
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jun 12, 2023 · fix by Jul 17, 2023 overdue · Violation #16024470
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.