Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Bedford-Stuyvesant (West)

400 Tompkins Avenue, Brooklyn

11216 · 15 apartments · 4 stories · City Council district 36

By · Updated · Data from NYC HPD

C
104open immediately hazardous violations · 693 per 100 apartments
B121Hazardous, open
A46Non-hazardous, open
!271Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

19 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    69
  2. Other repairs
    65
  3. Leaks and water damage
    36
  4. Broken doors or locks
    30
  5. Mold
    20
  6. No heat or hot water
    11
  7. Roaches
    11
  8. Missing smoke or CO detector
    10
  9. Mice or rats
    10
  10. Electrical problems
    7
  11. Plumbing, sinks and toilets
    3
  12. Lead paint
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C153 days
from 36 closed · NYC typical: 87 days
B117 days
from 18 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    MoldTrace and repair the source and abate the visible mold condition at north wall apprx 2 sq,ft. in the 3rd room from eastIssued Feb 27, 2025 · fix by Apr 3, 2025 overdue · Violation #17730242
  • B
    MoldTrace and repair the source and abate the visible mold condition at south wall apprx,4 sq.ft. in the 3rd room from eastIssued Feb 27, 2025 · fix by Apr 3, 2025 overdue · Violation #17730241
  • B
    MoldTrace and repair the source and abate the visible mold condition at west wall apprx 3 feet in the 3rd room from eastIssued Feb 27, 2025 · fix by Apr 3, 2025 overdue · Violation #17730240
  • C
    Broken doors or locksProvide handset at the exterior of door at bulkhead to allow unobstrucdted re-entry from the roof to the public hall stairsIssued Jan 13, 2025 · fix by Jan 19, 2025 overdue · Violation #17583984
  • C
    Other repairsFire escape defective. adjust the dropladder so that it will slide easily in the guide rods at rear yard fire escape (extended)Issued Jan 13, 2025 · fix by Jan 19, 2025 overdue · rent impairing · Violation #17584012
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of fire damage in the entire apartmentIssued Jan 13, 2025 · fix by Jan 19, 2025 overdue · Violation #17596966
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of fire damage in the entire apartmentIssued Jan 13, 2025 · fix by Jan 19, 2025 overdue · Violation #17583954
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of fire damage in the entire apartmentIssued Jan 13, 2025 · fix by Jan 19, 2025 overdue · Violation #17583958
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of fire damage in the entire apartmentIssued Jan 13, 2025 · fix by Jan 19, 2025 overdue · Violation #17583959
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of fire damage in the entire apartmentIssued Jan 13, 2025 · fix by Jan 19, 2025 overdue · Violation #17583960
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of fire damage in the entire apartmentIssued Jan 13, 2025 · fix by Jan 19, 2025 overdue · Violation #17583962
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at walls and ceiling at 1st, 2nd, 3rd, and 4th story public hallIssued Jan 13, 2025 · fix by Feb 17, 2025 overdue · Violation #17584084
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl siding at south wall at bulkhead at roof due to a recent fireIssued Jan 13, 2025 · fix by Feb 17, 2025 overdue · Violation #17584041
  • C
    Other repairsFire escape defective. adjust the dropladder so that it will slide easily in the guide rods at building front fire escape (extended)Issued Jan 13, 2025 · fix by Jan 19, 2025 overdue · rent impairing · Violation #17584007
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of fire damage in the entire apartmentIssued Jan 13, 2025 · fix by Jan 19, 2025 overdue · Violation #17583975
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of fire damage in the entire apartmentIssued Jan 13, 2025 · fix by Jan 19, 2025 overdue · Violation #17583970
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of fire damage in the entire apartmentIssued Jan 13, 2025 · fix by Jan 19, 2025 overdue · Violation #17583964
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of fire damage in the entire apartmentIssued Jan 13, 2025 · fix by Jan 19, 2025 overdue · Violation #17583965
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of fire damage in the entire apartmentIssued Jan 13, 2025 · fix by Jan 19, 2025 overdue · Violation #17583969
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of fire damage in the entire apartmentIssued Jan 7, 2025 · fix by Jan 13, 2025 overdue · Violation #17591778
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of fire damage in the entire apartmentIssued Jan 7, 2025 · fix by Jan 13, 2025 overdue · Violation #17591779
  • C
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures at ceiling and all walls in the entire apartmentIssued Jan 6, 2025 · fix by Jan 12, 2025 overdue · Violation #17598099
  • C
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures at all stories at public hallIssued Jan 2, 2025 · fix by Jan 8, 2025 overdue · Violation #17597050
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 26, 2024 · fix by Dec 25, 2024 overdue · rent impairing · Violation #17584080
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Dec 26, 2024 · fix by Jan 1, 2025 overdue · Violation #17584082
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Nov 29, 2024 · fix by Nov 28, 2024 overdue · rent impairing · Violation #17486219
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Nov 29, 2024 · fix by Dec 5, 2024 overdue · Violation #17486224
  • B
    Other repairsProperly repair or replace the broken or defective light switch at east wall in the foyerIssued Nov 6, 2024 · fix by Dec 11, 2024 overdue · Violation #17395560
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at east wall in the foyerIssued Nov 6, 2024 · fix by Dec 11, 2024 overdue · Violation #17395561
  • B
    Other repairsReplace with new the missing light switch cover at east wall in the foyerIssued Nov 6, 2024 · fix by Dec 11, 2024 overdue · Violation #17395559
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Nov 4, 2024 · fix by Dec 9, 2024 overdue · Violation #17395565
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Nov 4, 2024 · fix by Dec 9, 2024 overdue · Violation #17395566
  • B
    Plumbing, sinks and toiletsProperly secure the loose pedestal sink base in the bathroomIssued Nov 4, 2024 · fix by Dec 9, 2024 overdue · Violation #17395558
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in wasteline at bathtub in the bathroomIssued Nov 4, 2024 · fix by Dec 9, 2024 overdue · rent impairing · Violation #17395564
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 30, 2024 · fix by Nov 25, 2024 overdue · Violation #17386021
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 30, 2024 · fix by Nov 25, 2024 overdue · Violation #17386023
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from eastIssued Oct 30, 2024 · fix by Dec 4, 2024 overdue · Violation #17386040
  • B
    Other repairsProperly repair with similar material the broken or defective wooden window frame in the 3rd room from eastIssued Oct 30, 2024 · fix by Dec 4, 2024 overdue · Violation #17386042
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak active leak at ceiling at public hallIssued Oct 23, 2024 · fix by Oct 29, 2024 overdue · Violation #17346961
  • C
    Peeling paint and plasterProperly repair with similar material the broken or defective unkeyed plaster with fire retardant material, at ceiling approximately 5 sq ft at public hallIssued Oct 23, 2024 · fix by Oct 29, 2024 overdue · Violation #17346949
  • B
    Other repairsProperly repair with similar material the broken or defective with fire retardant material at 4th story west wall approx 10 sq ft at public hallIssued Oct 23, 2024 · fix by Nov 27, 2024 overdue · Violation #17346968
  • C
    Other repairsProperly repair with similar material the broken or defective subfloor at first story at public hallIssued Oct 23, 2024 · fix by Oct 29, 2024 overdue · Violation #17346939
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Oct 18, 2024 · fix by Oct 18, 2024 overdue · rent impairing · Violation #17361568
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Oct 18, 2024 · fix by Oct 24, 2024 overdue · Violation #17361569
  • B
    Peeling paint and plasterProperly repair with similar material the broken or defective plaster with fire rated material at the ceiling. at public hall, 1st storyIssued Oct 15, 2024 · fix by Nov 19, 2024 overdue · Violation #17347815
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling at public hall, 1st storyIssued Oct 15, 2024 · fix by Oct 21, 2024 overdue · Violation #17347813
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north wall in the bathroomIssued Sep 12, 2024 · fix by Sep 18, 2024 overdue · Violation #17270728
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Sep 12, 2024 · fix by Oct 17, 2024 overdue · Violation #17270732
  • C
    Mice or ratsAbate the infestation consisting of rodents rats droppings in the kitchen in the entire apartmentIssued Aug 19, 2024 · fix by Sep 14, 2024 overdue · rent impairing · Violation #17204938
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling at public hall, 1st storyIssued Aug 19, 2024 · fix by Sep 23, 2024 overdue · Violation #17204959
  • B
    Other repairsAbate the infestation consisting of vermin flies in the entire apartmentIssued Aug 19, 2024 · fix by Sep 23, 2024 overdue · Violation #17204947
  • B
    MoldTrace and repair the source and abate the visible mold condition at the south wall in the closet at the east table in the 4th room from eastIssued Aug 19, 2024 · fix by Sep 23, 2024 overdue · Violation #17204934
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective apartment entrance door hinges in the entranceIssued Aug 19, 2024 · fix by Sep 2, 2024 overdue · Violation #17204954
  • B
    Peeling paint and plasterProperly repair with similar material the broken or defective plaster with fire rated material at the ceiling at public hall, 1st storyIssued Aug 19, 2024 · fix by Sep 23, 2024 overdue · Violation #17204960
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 19, 2024 · fix by Sep 14, 2024 overdue · Violation #17204945
  • B
    MoldTrace and repair the source and abate the visible mold condition at the north wall in the closet at the west wall in the 1st room from east at northIssued Aug 19, 2024 · fix by Sep 23, 2024 overdue · Violation #17204914
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 29, 2024 · fix by Aug 24, 2024 overdue · Violation #17149743
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 29, 2024 · fix by Aug 24, 2024 overdue · Violation #17149744
  • B
    Other repairsProperly secure the loose metal window frame at west wall in the 3rd room from eastIssued Jul 25, 2024 · fix by Aug 29, 2024 overdue · Violation #17142426
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 25, 2024 · fix by Aug 20, 2024 overdue · Violation #17142423

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

1572017
442018
492019
552021
562022
752023
1342024
252025
12026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 780 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.