Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Harlem (South)

69 West 118 Street, Manhattan

10026 · 10 apartments · 5 stories · City Council district 9

By · Updated · Data from NYC HPD

C
8open immediately hazardous violations · 80 per 100 apartments
B66Hazardous, open
A10Non-hazardous, open
!76Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

5 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyNEP WEST 119TH STREET PROPERTIES LLC
Landlord (head officer or owner)Michael Rooney

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    22
  2. Leaks and water damage
    17
  3. Other repairs
    13
  4. Missing smoke or CO detector
    6
  5. No heat or hot water
    5
  6. Electrical problems
    5
  7. Broken doors or locks
    4
  8. Plumbing, sinks and toilets
    4
  9. Mold
    4
  10. Mice or rats
    3
  11. Lead paint
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C84 days
from 69 closed · NYC typical: 87 days
B252 days
from 71 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of hot water temperature exceeding the maximum allowable temperature of 130 f at all hot water fixtures in the…Issued Oct 13, 2026 · fix by Oct 19, 2026 overdue · Violation #19286073
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 13, 2026 · fix by Oct 10, 2026 overdue · rent impairing · Violation #19284385
  • B
    Broken doors or locksRefit closet doors at north wall in the 6th room from northIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19286077
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at east wall in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19286076
  • B
    Broken doors or locksRefit closet doors at south wall in the 5th room from northIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19286078
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection at waste line at sink in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19286075
  • B
    Other repairsProperly repair with similar material the broken or defective wood sub floor in the private hallwayIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19284388
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19284387
  • B
    Other repairsProperly repair with similar material the broken or defective wood sub floor in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19284386
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 13, 2026 · fix by Oct 10, 2026 overdue · rent impairing · Violation #19284389
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19286074
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the private hallwayIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19254386
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18954771
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18954759
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18954773
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the bathroomIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18954758
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18954772
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued May 7, 2026 · fix by Jun 2, 2026 overdue · rent impairing · Violation #18876254
  • B
    Other repairsProperly repair with similar material the broken or defective vynle tile at floor in the kitchenIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18752333
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Apr 3, 2026 · fix by May 8, 2026 overdue · Violation #18752340
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall. in the kitchenIssued Apr 3, 2026 · fix by May 8, 2026 overdue · Violation #18752338
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Apr 3, 2026 · fix by May 8, 2026 overdue · Violation #18752334
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south and east wall in the bathroomIssued Apr 3, 2026 · fix by May 8, 2026 overdue · Violation #18752339
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the 3rd kitchen from northIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18748051
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection drain pipe at sink in the 3rd kitchen from northIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18748063
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18732182
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18732164
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at ceiling in the bathroomIssued Feb 20, 2026 · fix by Mar 27, 2026 overdue · Violation #18663931
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Jan 26, 2026 · fix by Jan 25, 2026 overdue · rent impairing · Violation #18594517
  • B
    Broken doors or locksProvide exterior door handle at bulkhead door allowing reentry from roof to building , 5th storyIssued Jan 26, 2026 · fix by Mar 2, 2026 overdue · Violation #18594518
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jan 26, 2026 · fix by Mar 2, 2026 overdue · Violation #18594516
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and south wall in the bathroomIssued Oct 23, 2025 · fix by Nov 27, 2025 overdue · Violation #18309781
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Oct 20, 2025 · fix by Nov 24, 2025 overdue · Violation #18309785
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall and ceiling in the kitchenIssued Oct 20, 2025 · fix by Nov 24, 2025 overdue · Violation #18309784
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the kitchenIssued Sep 2, 2025 · fix by Oct 7, 2025 overdue · Violation #18191078
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 2, 2025 · fix by Oct 7, 2025 overdue · Violation #18191079
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at north and south wall in the 1st room from northIssued Sep 2, 2025 · fix by Oct 7, 2025 overdue · Violation #18191076
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at the north wall in the 1st room from northIssued Jun 9, 2025 · fix by Jul 14, 2025 overdue · Violation #17944153
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at the south wall in the 1st room from northIssued Jun 9, 2025 · fix by Jul 14, 2025 overdue · Violation #17944154
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at the bathtub in the bathroomIssued Jun 9, 2025 · fix by Jul 14, 2025 overdue · Violation #17953950
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 4, 2025 · fix by Apr 30, 2025 overdue · Violation #17809214
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Apr 4, 2025 · fix by May 9, 2025 overdue · Violation #17809658
  • B
    Lead paintProperly repair or replace the broken or defective latchset at bulkhead door leading to roofIssued Feb 20, 2025 · fix by Mar 27, 2025 overdue · Violation #17701486
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and east wall in the bathroomIssued Feb 5, 2025 · fix by Mar 12, 2025 overdue · Violation #17670874
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 5, 2025 · fix by Mar 3, 2025 overdue · Violation #17670873
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchenIssued Jan 8, 2025 · fix by Feb 12, 2025 overdue · Violation #17604653
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at north in the 2nd room from northIssued Jan 8, 2025 · fix by Feb 12, 2025 overdue · Violation #17604655
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchenIssued Nov 13, 2024 · fix by Dec 18, 2024 overdue · Violation #17415268
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north wall in the bathroomIssued Apr 10, 2024 · fix by May 15, 2024 overdue · Violation #16830302
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroomIssued Apr 10, 2024 · fix by May 15, 2024 overdue · Violation #16830301
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the kitchenIssued Apr 10, 2024 · fix by May 15, 2024 overdue · Violation #16830303
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the kitchenIssued Apr 10, 2024 · fix by May 15, 2024 overdue · Violation #16830304
  • B
    MoldTrace and repair the source and abate the visible mold condition approx. 4 sq.ft at ceiling in the bathroomIssued Mar 19, 2024 · fix by Apr 23, 2024 overdue · Violation #16762902
  • B
    Other repairsProperly repair or replace the broken or defective floor base cabinet in the bathroomIssued Mar 18, 2024 · fix by Apr 22, 2024 overdue · Violation #16738771
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroomIssued Mar 14, 2024 · fix by Apr 18, 2024 overdue · Violation #16738768
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Mar 14, 2024 · fix by Apr 18, 2024 overdue · Violation #16738769
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Mar 7, 2024 · fix by Apr 11, 2024 overdue · Violation #16725925
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Mar 7, 2024 · fix by Apr 11, 2024 overdue · Violation #16725927
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroomIssued Mar 1, 2024 · fix by Apr 5, 2024 overdue · Violation #16710379
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the kitchenIssued Mar 1, 2024 · fix by Apr 5, 2024 overdue · Violation #16710381

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

192017
202018
182019
102020
222021
472022
542023
792024
572025
492026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 399 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.