Housing violations · Bedford-Stuyvesant (East)
381 Vernon Avenue, Brooklyn
11206 · 3 apartments · 2 stories · City Council district 36
By Mantie Reid II · Updated · Data from NYC HPD
155 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster90
- No heat or hot water80
- Broken doors or locks72
- Other repairs68
- Leaks and water damage47
- Missing smoke or CO detector39
- Plumbing, sinks and toilets21
- Electrical problems12
- Mold11
- Mice or rats11
- Bedbugs6
- Lead paint2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
NYC typical: 87 days
NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BMoldTrace and repair the source and abate the visible mold condition 2 sqft at ceiling in the 1st room from northIssued Dec 3, 2019 · fix by Jan 7, 2020 overdue · Violation #13479275
- BMoldTrace and repair the source and abate the visible mold condition approximately 3 sq. ft at ceiling at public hall, 2nd story original violation 13096153…Issued Sep 30, 2019 · fix by Nov 4, 2019 overdue · Violation #13306066
- BMoldTrace and repair the source and abate the visible mold condition at the ceiling, approximately 4 sq.ft. in the 1st room from north at westIssued Sep 6, 2019 · fix by Oct 11, 2019 overdue · Violation #13266381
- BMoldTrace and repair the source and abate the visible mold condition ceiling 1sq.ft in the 1st room from northIssued Sep 3, 2019 · fix by Oct 8, 2019 overdue · Violation #13258803
- BMoldTrace and repair the source and abate the visible mold condition 5 sq.ft at ceiling at public hall, 2nd story original violation 12870293 issued 23-jan-19 has…Issued Aug 29, 2019 · fix by Oct 3, 2019 overdue · Violation #13253677
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in washbasin waste line. in the bathroomIssued Aug 28, 2019 · fix by Oct 2, 2019 overdue · rent impairing · Violation #13244598
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from northIssued Aug 26, 2019 · fix by Sep 30, 2019 overdue · Violation #13244583
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 26, 2019 · fix by Sep 16, 2019 overdue · Violation #13244592
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from northIssued Aug 5, 2019 · fix by Aug 13, 2019 overdue · Violation #13208562
- CBroken doors or locksProvide ready access to buildings heating system locked at cellarIssued Aug 5, 2019 · fix by Aug 13, 2019 overdue · Violation #13208582
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the 4th room from north at eastIssued Aug 5, 2019 · fix by Sep 9, 2019 overdue · rent impairing · Violation #13208577
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north at eastIssued Aug 5, 2019 · fix by Aug 13, 2019 overdue · Violation #13208576
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the 1st room from northIssued Aug 5, 2019 · fix by Sep 9, 2019 overdue · rent impairing · Violation #13208569
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from northIssued Aug 5, 2019 · fix by Aug 13, 2019 overdue · Violation #13208567
- BBroken doors or locks& 309 m/d law abate the nuisance consisting of key-operated lock at door to room with fire escape window in the 1st room from northIssued Aug 5, 2019 · fix by Sep 9, 2019 overdue · Violation #13208566
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 4th room from north at westIssued Aug 5, 2019 · fix by Sep 9, 2019 overdue · Violation #13208564
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the 3rd room from northIssued Aug 5, 2019 · fix by Sep 9, 2019 overdue · rent impairing · Violation #13208563
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Aug 2, 2019 · fix by Aug 1, 2019 overdue · rent impairing · Violation #13203732
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from east at southIssued May 31, 2019 · fix by Jun 8, 2019 overdue · Violation #13096024
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls in the 4th room from east at southIssued May 31, 2019 · fix by Jul 5, 2019 overdue · Violation #13096031
- BPeeling paint and plasterProperly repair with similar material the broken or defective fire retardant plaster at ceiling and all walls at public hall, 2nd storyIssued May 31, 2019 · fix by Jul 5, 2019 overdue · Violation #13096163
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 31, 2019 · fix by Jun 21, 2019 overdue · Violation #13096142
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electric wires at ceiling and all walls in the 4th room from east at northIssued May 31, 2019 · fix by Jul 5, 2019 overdue · Violation #13096054
- CBroken doors or locksProperly repair the broken or defective mortise lock at entrance door to building , 1st storyIssued May 31, 2019 · fix by Jun 8, 2019 overdue · Violation #13096146
- BLeaks and water damageRepair the roof so that it will not leak at the ceiling in the 1st room from north at westIssued Apr 5, 2019 · fix by May 10, 2019 overdue · rent impairing · Violation #12995424
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling throughout in the entire apartmentIssued Apr 5, 2019 · fix by May 10, 2019 overdue · Violation #12995423
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Mar 22, 2019 · fix by Apr 26, 2019 overdue · Violation #12973437
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape in the 1st room from north at westIssued Mar 22, 2019 · fix by Mar 30, 2019 overdue · Violation #12973421
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color unkeyed plastered surface at ceiling approx. 7 sq.ft in the 1st room from north…Issued Mar 22, 2019 · fix by Mar 30, 2019 overdue · Violation #12973416
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 22, 2019 · fix by Apr 12, 2019 overdue · Violation #12973408
- CBroken doors or locksProvide ready access to buildings heating system door locked at basementIssued Mar 22, 2019 · fix by Mar 30, 2019 overdue · Violation #12973513
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Mar 22, 2019 · fix by Mar 30, 2019 overdue · Violation #12973509
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the private hallwayIssued Mar 22, 2019 · fix by Apr 26, 2019 overdue · rent impairing · Violation #12973435
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 4th room from north at westIssued Mar 22, 2019 · fix by Mar 30, 2019 overdue · Violation #12973464
- CElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed bx cables throughout in the 4th room from north at westIssued Mar 22, 2019 · fix by Mar 30, 2019 overdue · Violation #12973458
- CBroken doors or locksRemove the illegal double cylinder key operated locking device at door in the 4th room from north at westIssued Mar 22, 2019 · fix by Mar 30, 2019 overdue · Violation #12973433
- CBroken doors or locksProvide ready access to buildings heating system door locked at basementIssued Mar 21, 2019 · fix by Mar 29, 2019 overdue · Violation #12970068
- BMissing smoke or CO detectorRepair or replace the smoke detector missingIssued Mar 21, 2019 · fix by Apr 25, 2019 overdue · Violation #12970062
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missingIssued Mar 21, 2019 · fix by Apr 25, 2019 overdue · Violation #12970059
- CBroken doors or locksProvide ready access to buildings heating system locked door at basement at boiler roomIssued Mar 20, 2019 · fix by Mar 28, 2019 overdue · Violation #12966709
- CBroken doors or locksProvide ready access to buildings heating system boiler room door locked at cellarIssued Mar 15, 2019 · fix by Mar 23, 2019 overdue · Violation #12960876
- BPeeling paint and plasterProperly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 2nd storyIssued Feb 19, 2019 · fix by Mar 26, 2019 overdue · Violation #12910534
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the entire apartmentIssued Feb 19, 2019 · fix by Mar 26, 2019 overdue · Violation #12910500
- BMoldTrace and repair the source and abate the visible mold condition ceiling 8 sq.ft, and east wall 4 sq.ft in the kitchenIssued Feb 19, 2019 · fix by Mar 26, 2019 overdue · Violation #12910479
- CBroken doors or locksProvide ready access to buildings heating system boiler room door locked at cellarIssued Feb 19, 2019 · fix by Feb 27, 2019 overdue · Violation #12912884
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 19, 2019 · fix by Feb 15, 2019 overdue · rent impairing · Violation #12912872
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 19, 2019 · fix by Feb 15, 2019 overdue · rent impairing · Violation #12912867
- CBroken doors or locksProvide ready access to buildings heating system dooor locked at cellarIssued Feb 19, 2019 · fix by Feb 27, 2019 overdue · Violation #12910617
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the 1st room from northIssued Feb 14, 2019 · fix by Feb 14, 2019 overdue · rent impairing · Violation #12910603
- CBroken doors or locksProvide ready access to buildings heating system door locked at basementIssued Feb 13, 2019 · fix by Feb 21, 2019 overdue · Violation #12904750
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 12, 2019 · fix by Feb 12, 2019 overdue · rent impairing · Violation #12904732
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 12, 2019 · fix by Feb 12, 2019 overdue · rent impairing · Violation #12904692
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellarIssued Feb 11, 2019 · fix by Feb 19, 2019 overdue · Violation #12902341
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 11, 2019 · fix by Feb 9, 2019 overdue · rent impairing · Violation #12902326
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 11, 2019 · fix by Feb 9, 2019 overdue · rent impairing · Violation #12902327
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 7, 2019 · fix by Feb 5, 2019 overdue · rent impairing · Violation #12891954
- CBroken doors or locksProvide ready access to buildings heating system door locked at public hall at cellarIssued Jan 30, 2019 · fix by Feb 7, 2019 overdue · Violation #12878808
- CBroken doors or locksProperly repair the broken or defective mortise lock at entrance door to building , 1st storyIssued Jan 30, 2019 · fix by Feb 7, 2019 overdue · Violation #12878783
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 4th room from northIssued Jan 30, 2019 · fix by Mar 6, 2019 overdue · Violation #12881018
- CElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling and all walls in the 4th room from northIssued Jan 30, 2019 · fix by Feb 7, 2019 overdue · Violation #12881016
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.