Housing violations · Clinton Hill
266 Washington Avenue, Brooklyn
11205 · 113 apartments · 6 stories · City Council district 35
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs23
- Peeling paint and plaster17
- Mice or rats13
- Mold10
- Roaches8
- Lead paint7
- Broken doors or locks6
- Leaks and water damage5
- Plumbing, sinks and toilets5
- Electrical problems4
- Missing smoke or CO detector4
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 166 closed · NYC typical: 87 days
from 277 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 10, 2026 · fix by Oct 6, 2026 overdue · Violation #19202184
- BLeaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19202183
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at west wall in the kitchenIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19181012
- BElectrical problemsReplace with new the missing electrical outlet cover at east wall in the 4th room from eastIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19181015
- BElectrical problemsProperly secure the loose electrical outlet at east wall in the 4th room from eastIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19181014
- BMoldTrace and repair the source and abate the visible mold condition less than 8 sq ft at ceiling,north,south and west walls in the bathroomIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19088877
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallwayIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18976277
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 8, 2026 · fix by Jul 4, 2026 overdue · Violation #18976276
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849316
- BOther repairsProperly repair or replace the broken or defective first window from west at north in the kitchenIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849321
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849319
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 2nd room from eastIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849318
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849315
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849314
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 4, 2026 · fix by May 30, 2026 overdue · Violation #18849313
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq ft south, east, west and north wall in the bathroomIssued Apr 30, 2026 · fix by May 26, 2026 overdue · Violation #18828392
- CMoldTrace and repair the source and abate the visible mold condition greater than 10 square feet at ceiling and all walls in the bathroomIssued Apr 30, 2026 · fix by May 26, 2026 overdue · Violation #18838885
- BBroken doors or locksProperly repair or replace the broken or defective mailbox door missing for apartment a24,north 4,1st story , 1st storyIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18808581
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 14, 2026 · fix by May 10, 2026 overdue · Violation #18776137
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 14, 2026 · fix by May 10, 2026 overdue · Violation #18776138
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Apr 14, 2026 · fix by May 19, 2026 overdue · Violation #18776143
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 14, 2026 · fix by May 10, 2026 overdue · Violation #18776133
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 14, 2026 · fix by May 10, 2026 overdue · Violation #18776134
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Apr 14, 2026 · fix by May 19, 2026 overdue · Violation #18776144
- BOther repairsProperly repair or replace the broken or defective radiator shut off knob at north wall in the 1st room from eastIssued Apr 14, 2026 · fix by May 19, 2026 overdue · Violation #18776140
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in at waste linr at bathtub in the bathroomIssued Apr 14, 2026 · fix by May 19, 2026 overdue · rent impairing · Violation #18776139
- BOther repairsProperly repair or replace the broken or defective radiator air valve at west wall in the 2nd room from eastIssued Apr 14, 2026 · fix by May 19, 2026 overdue · Violation #18776141
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Apr 14, 2026 · fix by May 19, 2026 overdue · Violation #18776136
- BOther repairsProperly secure the loose escutcheon plate at ceiling at the riser in the 1st room from eastIssued Apr 14, 2026 · fix by May 19, 2026 overdue · Violation #18776142
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at westIssued Apr 13, 2026 · fix by May 18, 2026 overdue · Violation #18780149
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchenIssued Apr 13, 2026 · fix by May 18, 2026 overdue · Violation #18780148
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from eastIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18743578
- BLead paint& 309 m/d law abate the nuisance consisting of key operated lock at door leading to fire escape. in the 3rd room from eastIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18743582
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18743581
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the 5th room from eastIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18743580
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the 1st room from eastIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18743576
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch in the entranceIssued Mar 25, 2026 · fix by Apr 8, 2026 overdue · Violation #18730019
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the bathroomIssued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18739543
- BBroken doors or locksRefit door at ccloset at east in the private hallwayIssued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18730022
- BOther repairsProperly repair or replace the broken or defective counter ballance at lower window sash at east in the bathroomIssued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18730020
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallwayIssued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18730021
- BOther repairsProperly repair or replace the broken or defective counter ballance at lower window sash at south wall in the 2nd room from north at westIssued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18730023
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenIssued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18730024
- BOther repairsProperly repair or replace the broken or defective counter ballance at lower window sash in the kitchenIssued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18730025
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 20, 2026 · fix by Apr 15, 2026 overdue · Violation #18720090
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 20, 2026 · fix by Apr 15, 2026 overdue · Violation #18720089
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Mar 20, 2026 · fix by Apr 3, 2026 overdue · Violation #18720072
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 20, 2026 · fix by Apr 15, 2026 overdue · Violation #18720088
- BBroken doors or locksRefit door at entrance in the 2nd room from northIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18720092
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 4th room from northIssued Mar 19, 2026 · fix by Apr 23, 2026 overdue · Violation #18719226
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from north at eastIssued Mar 19, 2026 · fix by Apr 23, 2026 overdue · Violation #18719225
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Mar 19, 2026 · fix by Apr 23, 2026 overdue · Violation #18719224
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Mar 19, 2026 · fix by Apr 23, 2026 overdue · Violation #18719221
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from northIssued Mar 19, 2026 · fix by Apr 23, 2026 overdue · Violation #18719227
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Mar 19, 2026 · fix by Apr 23, 2026 overdue · Violation #18719223
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 6, 2026 · fix by Apr 1, 2026 overdue · Violation #18687847
- BElectrical problemsProperly repair or replace the broken or defective electrical power outlet, 4th outlet at east at floor in the 4th room from east at northIssued Nov 25, 2025 · fix by Dec 30, 2025 overdue · Violation #18426592
- BOther repairsRefit lower sash window at east in the kitchenIssued Nov 25, 2025 · fix by Dec 30, 2025 overdue · Violation #18440180
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 24, 2025 · fix by Dec 20, 2025 overdue · Violation #18426606
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 6, 2025 · fix by Nov 1, 2025 overdue · Violation #18276323
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.