Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Clinton Hill

279 Washington Avenue, Brooklyn

11205 · 64 apartments · 6 stories · City Council district 35

By · Updated · Data from NYC HPD

C
7open immediately hazardous violations · 11 per 100 apartments
B62Hazardous, open
A57Non-hazardous, open
!125Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.

10 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.

Open in Google Maps ↗

Who owns and manages it

Owning companyFrancine Towers Owners Corp.
Landlord (head officer or owner)Christopher Alker

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    47
  2. Other repairs
    38
  3. Leaks and water damage
    10
  4. Broken doors or locks
    10
  5. Missing smoke or CO detector
    6
  6. Mold
    5
  7. Plumbing, sinks and toilets
    5
  8. Electrical problems
    4
  9. Roaches
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C78 days
from 9 closed · NYC typical: 84 days
BNot enough data
NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Aug 20, 2025 · fix by Aug 26, 2025 overdue · Violation #18169456
  • B
    Peeling paint and plasterProperly repair with similar material the broken or defective fire retarted plaster at all walls and ceiling at bulkheadIssued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #18169461
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft at ceiling in the 2nd room from northIssued Jul 8, 2025 · fix by Aug 12, 2025 overdue · Violation #18081301
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft at ceiling in the private hallwayIssued Jul 8, 2025 · fix by Aug 12, 2025 overdue · Violation #18081300
  • B
    Plumbing, sinks and toiletsProvide adequate supply of cold water for the fixtures at sink in the kitchenIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · rent impairing · Violation #18055167
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at southIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18055168
  • B
    Other repairsReplace with new the missing light fixture at ceiling in the 1st room from east at southIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18055169
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18055170
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling, north and south walls at public hall, 1st storyIssued Apr 21, 2025 · fix by May 26, 2025 overdue · Violation #17842796
  • C
    Broken doors or locks& 309 m/d law abate the nuisance consisting of (2) broken wire glass lites at doors at north wall at public hall, 1st story, section ''center''Issued Apr 4, 2025 · fix by Apr 10, 2025 overdue · Violation #17815096
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at the north wall, south wall, and the ceiling at public hall, 1st story,…Issued Apr 4, 2025 · fix by May 9, 2025 overdue · Violation #17815079
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at the bathtub in the bathroomIssued Apr 4, 2025 · fix by May 9, 2025 overdue · Violation #17805004
  • B
    Other repairsProperly repair or replace the broken or defective intercom system from building vestibule to box in the foyerIssued Apr 4, 2025 · fix by May 9, 2025 overdue · Violation #17805001
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at the lower sash window in the 1st room from north at eastIssued Apr 4, 2025 · fix by May 9, 2025 overdue · Violation #17805000
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Apr 3, 2025 · fix by Apr 9, 2025 overdue · Violation #17790131
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the foyerIssued Apr 3, 2025 · fix by May 8, 2025 overdue · Violation #17808157
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at southIssued Mar 31, 2025 · fix by May 5, 2025 overdue · Violation #17790128
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at southIssued Mar 31, 2025 · fix by Apr 6, 2025 overdue · Violation #17790132
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 square feet at ceiling in closet in the foyerIssued Mar 31, 2025 · fix by May 5, 2025 overdue · Violation #17790130
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from east at southIssued Mar 31, 2025 · fix by Apr 6, 2025 overdue · Violation #17790129
  • B
    Leaks and water damageRepair the roof so that it will not leak over the ceiling, north, east, and south walls at public hall, 6th storyIssued Mar 21, 2025 · fix by Apr 25, 2025 overdue · rent impairing · Violation #17772847
  • B
    Leaks and water damageRepair the roof so that it will not leak over bulkhead ceiling, east, south and west walls at 1st public hall bulkhead from east, 6th storyIssued Mar 21, 2025 · fix by Apr 25, 2025 overdue · rent impairing · Violation #17772851
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at bulkhead north, east, south, west walls and ceiling at 1st public hall…Issued Mar 21, 2025 · fix by Apr 25, 2025 overdue · Violation #17772850
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at north, east, south walls and ceiling at public hall stairs, 6th storyIssued Mar 21, 2025 · fix by Apr 25, 2025 overdue · Violation #17772848
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the private hallwayIssued Mar 10, 2025 · fix by Apr 14, 2025 overdue · Violation #17740679
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from northIssued Mar 10, 2025 · fix by Apr 14, 2025 overdue · Violation #17740677
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor tiles in the 2nd room from northIssued Mar 10, 2025 · fix by Apr 14, 2025 overdue · Violation #17740676
  • B
    Leaks and water damageRepair the roof so that it will not leak over the ceiling in the 2nd room from northIssued Mar 10, 2025 · fix by Apr 14, 2025 overdue · rent impairing · Violation #17740675
  • C
    Other repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Mar 10, 2025 · fix by Mar 16, 2025 overdue · rent impairing · Violation #17740674
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 6th storyIssued Mar 10, 2025 · fix by Apr 14, 2025 overdue · Violation #17740681
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Oct 28, 2024 · fix by Dec 2, 2024 overdue · Violation #17372016
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Oct 28, 2024 · fix by Dec 2, 2024 overdue · Violation #17372015
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the bathroomIssued Oct 28, 2024 · fix by Dec 2, 2024 overdue · Violation #17372013
  • B
    Other repairsProperly repair or replace the broken or defective springbalance at lower window sash (1st from north at west) in the bathroomIssued Oct 28, 2024 · fix by Dec 2, 2024 overdue · Violation #17372014
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain glaze at bathtub in the bathroomIssued Oct 28, 2024 · fix by Dec 2, 2024 overdue · Violation #17372011
  • B
    Peeling paint and plasterProperly repair with similar material the broken or defective fire retardant plaster at north wall at public hall, 1st storyIssued Jun 10, 2024 · fix by Jul 15, 2024 overdue · Violation #17028969
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Jun 10, 2024 · fix by Jul 15, 2024 overdue · Violation #17028966
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in wasteline at bathtub in the bathroomIssued Jun 10, 2024 · fix by Jul 15, 2024 overdue · rent impairing · Violation #17028965
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Jun 10, 2024 · fix by Jul 15, 2024 overdue · Violation #17028967
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color around window at east wall in the 1st room from eastIssued Oct 19, 2023 · fix by Nov 23, 2023 overdue · Violation #16315487
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at the ceiling and all walls ,in east sections, at 1st public hall…Issued Oct 11, 2023 · fix by Nov 15, 2023 overdue · Violation #16291627
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at the ceiling ,in east sections, at public hall, 6th storyIssued Oct 11, 2023 · fix by Nov 15, 2023 overdue · Violation #16291625
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Nov 30, 2021 · fix by Jan 4, 2022 overdue · Violation #14699668
  • B
    Other repairsProperly repair with similar material the broken or defective fire ertardant material at ceiling and east wall at public hall, 1st storyIssued Nov 30, 2021 · fix by Jan 4, 2022 overdue · Violation #14699671
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant materials at ceiling and west wall at public hall, 1st storyIssued Nov 30, 2021 · fix by Jan 4, 2022 overdue · Violation #14699669
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from northIssued Nov 30, 2021 · fix by Jan 4, 2022 overdue · Violation #14699667
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from northIssued Nov 30, 2021 · fix by Jan 4, 2022 overdue · Violation #14699666
  • B
    Broken doors or locksProvide heavy duty key lock-set at building entrance door at public hall, 1st storyIssued Nov 7, 2019 · fix by Dec 12, 2019 overdue · Violation #13418947
  • B
    Broken doors or locksRemove the illegal fastening consisting of electro magnetic locking device install at the building entrance door at public hall, 1st storyIssued Nov 7, 2019 · fix by Dec 12, 2019 overdue · rent impairing · Violation #13418945
  • B
    Broken doors or locksD26-10.01 adm code & 309 m/d law abate the nuisance consisting of double cylinder key operated lock entrance door 3 styIssued Jul 2, 2008 · fix by Aug 6, 2008 overdue · Violation #2225545
  • B
    RoachesD26-13.03 adm code abate the nuisance consisting of vermin roaches thru out 4 sty southeastIssued Jul 2, 2008 · fix by Aug 6, 2008 overdue · Violation #2225548
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color walls and ceilings thru out 4 sty westIssued Jun 13, 2007 · fix by Jul 23, 2007 overdue · Violation #2225553
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceilings and walls thru out 4 sty northwestIssued Jun 13, 2007 · fix by Jul 23, 2007 overdue · Violation #2225550
  • B
    Other repairsProperly repair with similar material the broken or defective wood flooring at radiator northwest room 2 sty east section northwestIssued Jun 13, 2007 · fix by Jul 23, 2007 overdue · Violation #2225586
  • B
    Peeling paint and plasterProperly repair with similar material the broken or defective fire retarded plaster ceiling 1 sty public hall west sectionIssued Jun 13, 2007 · fix by Jul 23, 2007 overdue · Violation #2225583
  • B
    Electrical problemsProperly secure the loose electrical wall outlet west wall kitchen 4 sty northwestIssued Jun 13, 2007 · fix by Jul 23, 2007 overdue · Violation #2225551
  • C
    Broken doors or locksRemove the illegal fastening double cylinder key operated lock installed entrance to 1 sty westIssued Jun 13, 2007 · fix by Jun 24, 2007 overdue · rent impairing · Violation #2225552
  • B
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective entrance 4 sty northwestIssued Jun 13, 2007 · fix by Jul 23, 2007 overdue · Violation #2225557
  • B
    Missing smoke or CO detectorProvide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing 5 sty eastIssued Jun 13, 2007 · fix by Jul 23, 2007 overdue · Violation #2225591
  • B
    Other repairsFire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate 6 sty northeastIssued Jun 13, 2007 · fix by Jul 23, 2007 overdue · Violation #2225555

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

22019
62021
192023
122024
682025
12026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 158 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 10:15 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.