Housing violations · Crown Heights (South)
941 Washington Avenue, Brooklyn
11225 · 52 apartments · 6 stories · City Council district 35
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster24
- Mice or rats20
- Mold16
- Other repairs13
- Lead paint12
- Roaches9
- Electrical problems3
- Plumbing, sinks and toilets3
- Broken doors or locks3
- Leaks and water damage2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 31 closed · NYC typical: 87 days
from 74 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at north wall in the 2nd room from east at southIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296407
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the kitchenIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296406
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296405
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from east at southIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296404
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of key operated lock at door preventing entrance to fire escape in the 1st room from east at southIssued Oct 15, 2026 · fix by Oct 21, 2026 overdue · Violation #19296403
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 2nd room from east at southIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296402
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south and west walls in the kitchenIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296400
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296401
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south and west walls in the foyerIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296408
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall in the private hallwayIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19235422
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west and north and south walls in the kitchenIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19235419
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall and ceiling in the bathroomIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19235420
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall and ceiling in the 4th room from eastIssued Sep 22, 2026 · fix by Sep 28, 2026 overdue · Violation #19235421
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 1st room from eastIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19235423
- BLeaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18780476
- BLeaks and water damageRepair the leaky and/or defective water supply pipe at wash basin in the bathroomIssued Apr 21, 2026 · fix by May 26, 2026 overdue · rent impairing · Violation #18780479
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at south north and east walls in the bathroomIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18780477
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 1st room from east at southIssued Feb 18, 2026 · fix by Mar 25, 2026 overdue · Violation #18636705
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south and north wall in the 1st room from eastIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18569626
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall and ceiling in the 1st room from eastIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18569628
- COther repairsProperly repair with similar material the broken or defective ceramic tile at east wall in the bathroomIssued Dec 17, 2025 · fix by Dec 23, 2025 overdue · Violation #18509525
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and north wall in the 2nd room from eastIssued Dec 17, 2025 · fix by Jan 21, 2026 overdue · Violation #18509526
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 3rd room from eastIssued Oct 7, 2025 · fix by Nov 11, 2025 overdue · Violation #18279081
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at east wall in the bathroomIssued Oct 7, 2025 · fix by Nov 11, 2025 overdue · Violation #18279080
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 24, 2025 · fix by Aug 19, 2025 overdue · Violation #18103880
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 24, 2025 · fix by Aug 19, 2025 overdue · Violation #18103888
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 24, 2025 · fix by Aug 19, 2025 overdue · Violation #18103881
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 9, 2025 · fix by Jul 5, 2025 overdue · Violation #17940707
- COther repairsProperly repair or replace the broken or defective counter balance lower sashes at 1st and 2nd window from west at north causing guillotine effect in the 4th…Issued May 28, 2025 · fix by Jun 3, 2025 overdue · Violation #17918775
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of at ceiling in the kitchenIssued May 28, 2025 · fix by Jul 2, 2025 overdue · Violation #17918772
- BOther repairsReplace with new the missing light switch cover at south wall in the private hallwayIssued May 28, 2025 · fix by Jul 2, 2025 overdue · Violation #17918777
- BOther repairsProperly repair or replace the broken or defective counter balance lower sash in the bathroomIssued May 28, 2025 · fix by Jul 2, 2025 overdue · Violation #17918774
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 1, 2025 · fix by Apr 27, 2025 overdue · Violation #17799896
- BMoldTrace and repair the source and abate the visible mold condition less than 5 sq ft at ceiling at showerstall in the bathroomIssued Jan 23, 2025 · fix by Feb 27, 2025 overdue · Violation #17647734
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling opposite side of bathroom in the private hallwayIssued Oct 7, 2024 · fix by Nov 11, 2024 overdue · Violation #17294846
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 11, 2024 · fix by Apr 4, 2024 overdue · Violation #16739882
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 11, 2024 · fix by Apr 4, 2024 overdue · Violation #16739881
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 11, 2024 · fix by Apr 4, 2024 overdue · Violation #16739880
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 11, 2024 · fix by Feb 6, 2024 overdue · Violation #16582722
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 8, 2024 · fix by Feb 3, 2024 overdue · Violation #16580955
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 2nd room from eastIssued Jan 8, 2024 · fix by Jan 14, 2024 overdue · Violation #16565329
- BMoldTrace and repair the source and abate the visible mold condition approx. 8 sq. ft. at east wall in the bathroomIssued May 3, 2023 · fix by Jun 7, 2023 overdue · Violation #15961475
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 1, 2023 · fix by May 27, 2023 overdue · Violation #15946951
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 1, 2023 · fix by May 27, 2023 overdue · Violation #15946949
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall and east wall in the 1st room from east at northIssued May 1, 2023 · fix by Jun 5, 2023 overdue · Violation #15946942
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls in the 1st room from east at southIssued May 1, 2023 · fix by Jun 5, 2023 overdue · Violation #15946947
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling within closet in the 1st room from east at northIssued May 1, 2023 · fix by Jun 5, 2023 overdue · Violation #15946941
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 19, 2023 · fix by Feb 14, 2023 overdue · Violation #15675135
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 19, 2023 · fix by Feb 14, 2023 overdue · Violation #15664726
- BOther repairsProperly repair with similar material the broken or defective wood baseboard at south wall in the 1st room from east at southIssued Jan 3, 2023 · fix by Feb 7, 2023 overdue · Violation #15636394
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall and south wall in the 1st room from east at southIssued Jan 3, 2023 · fix by Feb 7, 2023 overdue · Violation #15636393
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish at bathtub by method of reglazing in the bathroomIssued Jan 3, 2023 · fix by Feb 7, 2023 overdue · Violation #15636391
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall and ceiling inside north closet in the 1st room from east at southIssued Jan 3, 2023 · fix by Feb 7, 2023 overdue · Violation #15636392
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall, east wall and ceiling in the 2nd room from eastIssued Jan 3, 2023 · fix by Feb 7, 2023 overdue · Violation #15636387
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 14, 2022 · fix by Nov 9, 2022 overdue · Violation #15427810
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 13, 2022 · fix by Nov 6, 2022 overdue · Violation #15426860
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 13, 2022 · fix by Nov 6, 2022 overdue · Violation #15426864
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 13, 2022 · fix by Nov 6, 2022 overdue · Violation #15426869
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 13, 2022 · fix by Nov 6, 2022 overdue · Violation #15426870
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 13, 2022 · fix by Nov 6, 2022 overdue · Violation #15426865
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.