Housing violations · Morningside Heights
351 West 125 Street, Manhattan
10027 · 38 apartments · 6 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
24 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs119
- Peeling paint and plaster109
- Lead paint31
- Leaks and water damage27
- Broken doors or locks24
- Electrical problems21
- Mice or rats18
- Plumbing, sinks and toilets15
- Missing smoke or CO detector12
- Mold7
- Roaches7
- No heat or hot water3
- Missing window guards2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 155 closed · NYC typical: 87 days
from 266 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairsProperly repair or replace the broken or defective water closet tank cover in the bathroomIssued Nov 16, 2026 · Violation #19377728
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 16, 2026 · Violation #19377724
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroomIssued Nov 16, 2026 · Violation #19376732
- BOther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Nov 16, 2026 · rent impairing · Violation #19376753
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroomIssued Nov 16, 2026 · Violation #19376758
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 16, 2026 · Violation #19376764
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective wood base board at sink cabinet in the kitchenIssued Nov 16, 2026 · Violation #19376765
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchenIssued Nov 16, 2026 · Violation #19376792
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall and ceiling in the 1st room from northIssued Nov 16, 2026 · Violation #19376800
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 16, 2026 · Violation #19376804
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash at north wall in the 1st room from northIssued Nov 16, 2026 · Violation #19376821
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north wall and ceiling in the 1st room from northIssued Nov 16, 2026 · Violation #19376838
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at north wall in the 1st room from northIssued Nov 16, 2026 · Violation #19376850
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the kitchenIssued Nov 16, 2026 · Violation #19376871
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 16, 2026 · Violation #19376876
- BOther repairsProperly repair with similar material the broken or defective at ceiling at public hall, 6th storyIssued Nov 16, 2026 · Violation #19376888
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hingesIssued Nov 16, 2026 · Violation #19376902
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from northIssued Nov 16, 2026 · Violation #19376913
- BOther repairsProperly repair or replace the broken or defective steam valve at radiator in the 1st room from northIssued Nov 16, 2026 · Violation #19376916
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the kitchenIssued Nov 16, 2026 · Violation #19376919
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Nov 16, 2026 · Violation #19376922
- BElectrical problemsProperly repair or replace the broken or defective electrical lighting at north wall in the bathroomIssued Nov 16, 2026 · Violation #19376924
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from northIssued Nov 16, 2026 · Violation #19377604
- BOther repairsProperly repair or replace the broken or defective steam valve in the 1st room from northIssued Nov 16, 2026 · Violation #19377609
- BOther repairsProperly repair or replace the broken or defective steam valve in the 1st room from northIssued Nov 16, 2026 · Violation #19377628
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 16, 2026 · Violation #19377632
- BOther repairsProperly repair or replace the broken or defective steam valve in the 3rd room from northIssued Nov 16, 2026 · Violation #19377646
- BOther repairsProperly repair or replace the broken or defective spring balance on lower window sash in the 1st room from northIssued Nov 16, 2026 · Violation #19377659
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Nov 16, 2026 · Violation #19377676
- BOther repairsProperly repair with similar material the broken or defective wall cabinet at north in the kitchenIssued Nov 16, 2026 · Violation #19377690
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellarIssued Nov 16, 2026 · Violation #19378305
- BOther repairsProperly repair with similar material the broken or defective floor vinyl tiles in the kitchenIssued Nov 16, 2026 · Violation #19377703
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 16, 2026 · rent impairing · Violation #19378304
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock on door in the entranceIssued Nov 16, 2026 · Violation #19377764
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash in the kitchenIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376289
- BOther repairsProperly repair with similar material the broken or defective floor vinyl tiles in the kitchenIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376295
- COther repairsProperly repair or replace the broken or defective window blanaces at lower window sash in the bathroomIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19376304
- CElectrical problemsProvide a safe and adequate supply of electric service to the fixtures electrical outlet at west wall in the bathroomIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19376314
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19376317
- BOther repairsProperly repair with similar material the broken or defective floor vinyl tiles in the kitchenIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376363
- BBroken doors or locksProperly repair or replace the broken or defective metal door frame in the entranceIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376353
- BOther repairsProperly repair or replace the broken or defective wall cabinet at north wall in the kitchenIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376330
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19376337
- COther repairsProperly repair or replace the broken or defective radiator steam valve in the 1st room from northIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19376347
- BOther repairsProperly repair with similar material the broken or defective floor vinyl tiles in the kitchenIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376349
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376350
- BOther repairsProperly secure the loose radiator at north wall in the 1st room from northIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19370926
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 22, 2026 · fix by Nov 17, 2026 · Violation #19317470
- CLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Oct 21, 2026 · fix by Oct 27, 2026 overdue · Violation #19317031
- BOther repairsProperly repair or replace the broken or defective bell/buzzer/intercom system at building entrance , 1st storyIssued Oct 6, 2026 · fix by Nov 10, 2026 overdue · Violation #19281195
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Sep 25, 2026 · fix by Oct 21, 2026 overdue · rent impairing · Violation #19253758
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 5th room from east at southIssued Jul 6, 2026 · fix by Jul 12, 2026 overdue · Violation #19055859
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchenIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19055854
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 5th room from east at northIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19055849
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door hinges in the entranceIssued Jul 2, 2026 · fix by Jul 16, 2026 overdue · Violation #19047847
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 5th room from north at westIssued May 20, 2026 · fix by Jun 24, 2026 overdue · Violation #18946357
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the kitchenIssued May 20, 2026 · fix by Jun 24, 2026 overdue · Violation #18946350
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the private hallwayIssued May 20, 2026 · fix by Jun 24, 2026 overdue · Violation #18946353
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 5th room from north at eastIssued May 20, 2026 · fix by Jun 24, 2026 overdue · Violation #18946358
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall in the closet in the 1st room from northIssued May 20, 2026 · fix by Jun 24, 2026 overdue · Violation #18946361
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.