Housing violations · Manhattanville-West Harlem
367 West 126 Street, Manhattan
10027 · 9 apartments · 5 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster8
- Other repairs7
- Roaches5
- Missing smoke or CO detector4
- Plumbing, sinks and toilets3
- Mice or rats3
- Broken doors or locks2
- No heat or hot water1
- Leaks and water damage1
- Electrical problems1
- Bedbugs1
- Mold1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 5 closed · NYC typical: 87 days
from 7 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of scalding hot water exceeding the maximum allowable temperature of 130 degrees (f) at all fixtures in the entire…Issued Oct 28, 2026 · fix by Nov 3, 2026 overdue · Violation #19324193
- BPlumbing, sinks and toiletsProperly secure the loose faucet at sink in the kitchenIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19324187
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 28, 2026 · fix by Nov 23, 2026 · Violation #19324181
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 28, 2026 · fix by Nov 23, 2026 · Violation #19324179
- COther repairsProperly repair or replace the broken or defective metal nose at all treads at stoopIssued Oct 28, 2026 · fix by Nov 3, 2026 overdue · Violation #19324215
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 1, 2026 · fix by Oct 27, 2026 overdue · Violation #19266827
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 1, 2026 · fix by Oct 27, 2026 overdue · Violation #19266829
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling at bulkhead stairsIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · rent impairing · Violation #19169232
- BOther repairsProperly repair with similar material the broken or defective fire retardent material at ceiling and west wallIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19169233
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at west wall in the 3rd room from north at eastIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18985149
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from north at eastIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18985148
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18985146
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 8, 2026 · fix by Jul 4, 2026 overdue · Violation #18985145
- CRoachesAbate the infestation consisting of roaches at public hall, 3rd storyIssued Jun 8, 2026 · fix by Jul 4, 2026 overdue · Violation #18985144
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18985147
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base at lower sink cabinet,at north wall. in the kitchenIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18985151
- BBroken doors or locksProperly repair or replace the broken or defective latch set at bulkhead doorIssued Apr 23, 2026 · fix by May 28, 2026 overdue · Violation #18807623
- BOther repairsProperly repair or replace the broken or defective lower sash counter balance at 1st window from west at north in the 1st room from northIssued Apr 23, 2026 · fix by May 28, 2026 overdue · Violation #18807618
- COther repairsProperly repair with similar material the broken or defective fire retardent material at bulkhead ceilingIssued Apr 23, 2026 · fix by Apr 29, 2026 overdue · Violation #18807621
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at bulkhead, roofIssued Apr 28, 2025 · fix by Jun 2, 2025 overdue · Violation #17854383
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latchset at bulkhead door, roofIssued Apr 28, 2025 · fix by May 12, 2025 overdue · Violation #17854382
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sqft at ceiling in the bathroomIssued Nov 26, 2024 · fix by Dec 31, 2024 overdue · Violation #17465475
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 29, 2024 · fix by Aug 24, 2024 overdue · Violation #17137460
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 29, 2024 · fix by Aug 24, 2024 overdue · Violation #17137462
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Jul 29, 2024 · fix by Sep 2, 2024 overdue · Violation #17137463
- BOther repairsProperly repair or replace the broken or defective lower sash spring balance at1st window from west at north wall in the 1st room from northIssued Jul 29, 2024 · fix by Sep 2, 2024 overdue · Violation #17137465
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Jul 29, 2024 · fix by Sep 2, 2024 overdue · Violation #17137464
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective ceramic tiles around bathtub walls in the bathroomIssued Jul 29, 2024 · fix by Sep 2, 2024 overdue · Violation #17137461
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.