Housing violations · Manhattanville-West Harlem
433 West 126 Street, Manhattan
10027 · 15 apartments · 5 stories · City Council district 7
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
11 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster42
- Other repairs17
- Leaks and water damage12
- Broken doors or locks10
- Missing smoke or CO detector10
- Electrical problems6
- Mold5
- Plumbing, sinks and toilets3
- Lead paint3
- Roaches3
- Mice or rats2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 21 closed · NYC typical: 87 days
from 8 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CElectrical problemsProvide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for…Issued Nov 16, 2026 · Violation #19378977
- CPlumbing, sinks and toiletsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the accumulation of construction materials. ceramic wash basin, water closet…Issued Oct 27, 2026 · fix by Nov 2, 2026 overdue · Violation #19328911
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective the 1st door from west at boiler room at cellarIssued Oct 27, 2026 · fix by Nov 10, 2026 overdue · Violation #19328910
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at 2nd door from east at gas room at cellarIssued Oct 27, 2026 · fix by Nov 10, 2026 overdue · Violation #19328909
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at 1st door from east at electrical room at cellarIssued Oct 27, 2026 · fix by Nov 10, 2026 overdue · Violation #19328908
- CLead paintReplace or repair the self-closing doors that is missing or defective hinges at door leading to cellar at public hall, 1st storyIssued Oct 27, 2026 · fix by Nov 10, 2026 overdue · Violation #19328912
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Oct 27, 2026 · fix by Nov 22, 2026 · rent impairing · Violation #19328906
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Oct 27, 2026 · fix by Nov 22, 2026 · rent impairing · Violation #19328907
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroomIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19263361
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the private hallwayIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19263360
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Jun 9, 2026 · fix by Jun 15, 2026 overdue · Violation #18991316
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square feet at ceiling in the bathroomIssued Feb 27, 2026 · fix by Apr 3, 2026 overdue · Violation #18678227
- BOther repairsProperly repair or replace the broken or defective radiator so to be in working order. effectively. in the bathroomIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18652069
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the 1st room from east at southIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18652070
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroomIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18652068
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the 2nd room from east at southIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18652071
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from northIssued Dec 22, 2025 · fix by Jan 26, 2026 overdue · Violation #18517771
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Dec 22, 2025 · fix by Jan 26, 2026 overdue · Violation #18517774
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at wash basin in the bathroomIssued Dec 22, 2025 · fix by Jan 26, 2026 overdue · rent impairing · Violation #18517775
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Oct 30, 2025 · fix by Dec 4, 2025 overdue · Violation #18318292
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from northIssued Oct 24, 2025 · fix by Nov 28, 2025 overdue · Violation #18318295
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak ceiling in the 2nd room from northIssued Oct 24, 2025 · fix by Nov 28, 2025 overdue · Violation #18318289
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from northIssued Oct 24, 2025 · fix by Nov 28, 2025 overdue · Violation #18318288
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak ceiling in the 3rd room from northIssued Oct 24, 2025 · fix by Nov 28, 2025 overdue · Violation #18318294
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Oct 21, 2025 · fix by Nov 25, 2025 overdue · Violation #18306830
- BLeaks and water damageRepair the roof so that it will not leak at bulk head ceilingIssued Oct 21, 2025 · fix by Nov 25, 2025 overdue · rent impairing · Violation #18306858
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at bulkhead ceilingIssued Oct 21, 2025 · fix by Nov 25, 2025 overdue · Violation #18306857
- BOther repairsProperly repair or replace the broken or defective lower window sash counter balance at west in the 1st room from north at westIssued May 5, 2025 · fix by Jun 9, 2025 overdue · Violation #17867736
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 5, 2025 · fix by May 31, 2025 overdue · Violation #17867735
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the 5th room from northIssued Feb 24, 2025 · fix by Mar 31, 2025 overdue · Violation #17716516
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Feb 24, 2025 · fix by Mar 31, 2025 overdue · Violation #17716517
- BOther repairsProperly repair or replace the broken or defective heating baseboard fins and cover at west wall in the 2nd room from north at westIssued Feb 19, 2025 · fix by Mar 26, 2025 overdue · Violation #17694589
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Feb 19, 2025 · fix by Mar 26, 2025 overdue · Violation #17694592
- BOther repairsProperly repair or replace the broken or defective heating baseboard fins and cover at west wall in the bathroomIssued Feb 19, 2025 · fix by Mar 26, 2025 overdue · Violation #17694590
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 18, 2025 · fix by Mar 16, 2025 overdue · Violation #17694593
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the bathroomIssued Dec 3, 2024 · fix by Jan 7, 2025 overdue · Violation #17512862
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the 3rd room from north at westIssued Aug 5, 2024 · fix by Sep 9, 2024 overdue · rent impairing · Violation #17153465
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at west wall in the 1st room from north at eastIssued Aug 5, 2024 · fix by Sep 9, 2024 overdue · Violation #17172474
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the private hallwayIssued Aug 5, 2024 · fix by Sep 9, 2024 overdue · rent impairing · Violation #17153462
- BOther repairsProperly repair with similar material the broken or defective ceramic tile around window in the bathroomIssued Aug 1, 2024 · fix by Sep 5, 2024 overdue · Violation #17153463
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missingIssued Aug 1, 2024 · fix by Sep 5, 2024 overdue · Violation #17153466
- BMissing smoke or CO detectorRepair or replace the smoke detector missingIssued Aug 1, 2024 · fix by Sep 5, 2024 overdue · Violation #17153467
- BOther repairsProperly repair or replace the broken or defective counter balance at lower window shash at north wall in the 1st room from north at eastIssued Aug 1, 2024 · fix by Sep 5, 2024 overdue · Violation #17153468
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the private hallwayIssued Aug 1, 2024 · fix by Sep 5, 2024 overdue · Violation #17153469
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at westIssued Jul 17, 2024 · fix by Aug 21, 2024 overdue · Violation #17116124
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at westIssued Jul 17, 2024 · fix by Aug 21, 2024 overdue · Violation #17116123
- BMoldTrace and repair the source and abate the visible mold condition approximately 5 sq ft at ceiling in the bathroomIssued Jul 11, 2024 · fix by Aug 15, 2024 overdue · Violation #17120170
- BLeaks and water damageRepair the roof so that it will not leak at ceiling and over north wall in the private hallwayIssued May 29, 2024 · fix by Jul 3, 2024 overdue · rent impairing · Violation #17004984
- BMoldTrace and repair the source and abate the visible mold condition at ceiling approx 10 sq ft in the bathroomIssued May 29, 2024 · fix by Jul 3, 2024 overdue · Violation #17004983
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the foyerIssued May 29, 2024 · fix by Jul 3, 2024 overdue · rent impairing · Violation #17004985
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued May 29, 2024 · fix by Jul 3, 2024 overdue · Violation #17004986
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued May 29, 2024 · fix by Jul 3, 2024 overdue · Violation #17004987
- BElectrical problemsRepair the broken or defective plastered surfaces and paint in a uniform color electrical outlet at east wall in the 3rd room from north at westIssued May 29, 2024 · fix by Jul 3, 2024 overdue · Violation #17004988
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at west wall in the 1st room from north at westIssued May 29, 2024 · fix by Jul 3, 2024 overdue · Violation #17004989
- BMoldTrace and repair the source and abate the visible mold condition approx. 6 sq.ft at west wall and approx. 2 sq ft at ceiling in the bathroomIssued May 8, 2024 · fix by Jun 12, 2024 overdue · Violation #16961853
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Mar 13, 2024 · fix by Apr 17, 2024 overdue · Violation #16736750
- BLeaks and water damageRepair the roof so that it will not leak above ceiling in the private hallwayIssued Mar 13, 2024 · fix by Apr 17, 2024 overdue · rent impairing · Violation #16736751
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Feb 9, 2024 · fix by Mar 15, 2024 overdue · Violation #16661057
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the bathroomIssued Feb 9, 2024 · fix by Mar 15, 2024 overdue · Violation #16661058
- BLeaks and water damageRepair the roof so that it will not leak over bulkhead ceiling at public hall stairs, 5th storyIssued Jan 29, 2024 · fix by Mar 4, 2024 overdue · rent impairing · Violation #16630645
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.