Housing violations · Morningside Heights
464 West 126 Street, Manhattan
10027 · 19 apartments · 6 stories · City Council district 7
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
14 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster62
- Other repairs28
- Leaks and water damage22
- Missing smoke or CO detector20
- Broken doors or locks17
- Plumbing, sinks and toilets13
- Roaches11
- Mice or rats8
- Mold7
- Lead paint7
- No heat or hot water6
- Electrical problems3
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 81 closed · NYC typical: 87 days
from 15 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the foyerIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19362895
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the kitchenIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19362888
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 9, 2026 · fix by Dec 5, 2026 · Violation #19362871
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19362875
- BOther repairsProperly repair or replace the broken or defective silicone caulk around tub/shower at south wall in the bathroomIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19363435
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective silicone caulk around bathtub/shower in the bathroomIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19362878
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the kitchenIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19362882
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19362866
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the kitchenIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19362863
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the foyerIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19362874
- COther repairsProperly repair or replace the broken or defective baseboard radiator at south wall in the bathroomIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19362868
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19349840
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19349841
- BPlumbing, sinks and toiletsReplace with new the missing trip lever at bathtub in the bathroomIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19309261
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Oct 6, 2026 · fix by Oct 12, 2026 overdue · Violation #19274955
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 2nd room from eastIssued Oct 6, 2026 · fix by Nov 10, 2026 overdue · Violation #19274966
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 6, 2026 · fix by Oct 12, 2026 overdue · Violation #19274965
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 1st bathroom from northIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19236458
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north and west walls in the 2nd bathroom from northIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19236460
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from northIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19236459
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19236457
- CLeaks and water damageRepair the roof so that it will not leak lower roof extension at ceiling in the 3rd room from east at northIssued Jul 10, 2026 · fix by Jul 16, 2026 overdue · rent impairing · Violation #19070460
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19070468
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 3rd room from east at northIssued Jul 10, 2026 · fix by Jul 16, 2026 overdue · Violation #19070464
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak over bathroom door at west wall in the bathroomIssued Jul 10, 2026 · fix by Jul 16, 2026 overdue · Violation #19070474
- CBroken doors or locksRepair the broken or defective plastered surfaces and paint in a uniform color over bathroom door at west wall in the bathroomIssued Jul 10, 2026 · fix by Jul 16, 2026 overdue · Violation #19070470
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and all walls in the 1st bathroom from eastIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #19004315
- BBroken doors or locksProperly repair or replace the broken or defective door at closet in the 5th room from east at northIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #19004320
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #19004296
- BMoldTrace and repair the source and abate the visible mold condition around bathtub approx 25 sqft in the 2nd bathroom from eastIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #19004318
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd bathroom from eastIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #19004317
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st bathroom from eastIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #19004314
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #19004313
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #19004312
- BBroken doors or locksRefit door at closet in the 4th room from east at northIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #19004299
- CLead paintProperly repair and abate unsafe electric wiring condition consisting of illegal extension cord running from bulkhead light fixture at south exteiror wall…Issued Jun 1, 2026 · fix by Jun 7, 2026 overdue · Violation #18968844
- COther repairsProperly repair or replace the broken or defective roof covering material at bulkheadIssued Mar 13, 2026 · fix by Mar 19, 2026 overdue · Violation #18715264
- COther repairsProperly repair with similar material the broken or defective stucco at east exteiror wall at bulkheadIssued Mar 13, 2026 · fix by Mar 19, 2026 overdue · Violation #18715274
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18715235
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18715233
- CLeaks and water damageRepair the roof so that it will not leak at bulkhead ceilingIssued Mar 13, 2026 · fix by Mar 19, 2026 overdue · rent impairing · Violation #18715253
- COther repairsProperly repair with similar material the broken or defective stucco at north exteiror wall at bulkheadIssued Mar 13, 2026 · fix by Mar 19, 2026 overdue · Violation #18715271
- COther repairsProperly repair with similar material the broken or defective fire rated material at bulkhead ceiling and all wallsIssued Mar 13, 2026 · fix by Mar 19, 2026 overdue · Violation #18715248
- COther repairsProperly repair with similar material the broken or defective stucco at west exteiror wall at bulkheadIssued Mar 13, 2026 · fix by Mar 19, 2026 overdue · Violation #18715268
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 2nd bathroom from northIssued Feb 17, 2026 · fix by Mar 24, 2026 overdue · Violation #18650461
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tiles at east wall in the 2nd bathroom from northIssued Feb 17, 2026 · fix by Mar 24, 2026 overdue · Violation #18650462
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 17, 2026 · fix by Feb 14, 2026 overdue · rent impairing · Violation #18650454
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st bathroom from northIssued Feb 17, 2026 · fix by Mar 24, 2026 overdue · Violation #18650457
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from northIssued Feb 17, 2026 · fix by Mar 24, 2026 overdue · Violation #18650460
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Feb 17, 2026 · fix by Feb 23, 2026 overdue · Violation #18650456
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Feb 17, 2026 · fix by Mar 24, 2026 overdue · Violation #18650458
- BOther repairsProperly repair or replace the broken or defective counter balance upper sash window, window at west wall in the kitchenIssued Feb 17, 2026 · fix by Mar 24, 2026 overdue · Violation #18650463
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18576121
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18576122
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 20, 2026 · fix by Jan 18, 2026 overdue · rent impairing · Violation #18576118
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 20, 2026 · fix by Feb 15, 2026 overdue · Violation #18576123
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 15, 2026 · fix by Feb 10, 2026 overdue · Violation #18572226
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18572225
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18572224
- CBroken doors or locksProvide ready access to buildings heating system , door locked at basement at boiler roomIssued Jan 5, 2026 · fix by Jan 11, 2026 overdue · Violation #18545760
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.