Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Flatbush

80 Woodruff Avenue, Brooklyn

11226 · 42 apartments · 6 stories · City Council district 40

By · Updated · Data from NYC HPD

C
83open immediately hazardous violations · 198 per 100 apartments
B86Hazardous, open
A20Non-hazardous, open
!158Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

9 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company80 WOODRUFF AVENUE, LLC
Landlord (head officer or owner)Gary Wollan

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    46
  2. Peeling paint and plaster
    30
  3. Roaches
    28
  4. Mice or rats
    18
  5. Broken doors or locks
    13
  6. Plumbing, sinks and toilets
    11
  7. Leaks and water damage
    9
  8. Lead paint
    8
  9. Electrical problems
    7
  10. Mold
    7
  11. No heat or hot water
    6
  12. Missing window guards
    4
  13. Missing smoke or CO detector
    2
  14. Bedbugs
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C159 days
from 241 closed · NYC typical: 87 days
B342 days
from 400 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Lead paintProperly repair with similar material the broken or defective cement tread and cheek wall at east yard leading to streetIssued Nov 16, 2026 · Violation #19376162
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19371209
  • C
    Lead paint& 309 m/d law abate the nuisance consisting of key operated lock on door leading to room with fire escape. in the 1st room from eastIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19370518
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19370516
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 12, 2026 · fix by Nov 10, 2026 overdue · rent impairing · Violation #19370514
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 12, 2026 · fix by Nov 10, 2026 overdue · rent impairing · Violation #19370509
  • C
    RoachesAbate the infestation consisting of roaches at cellarIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19371220
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19370505
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376194
  • C
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures electrical outlet at west wall in the 1st room from eastIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19370500
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376193
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 12, 2026 · fix by Nov 10, 2026 overdue · rent impairing · Violation #19370503
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 12, 2026 · fix by Nov 10, 2026 overdue · rent impairing · Violation #19371214
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective silicone caulk at around bathtub in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19349924
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19349925
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19349915
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19349914
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at floor. in the bathroomIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19349913
  • C
    Other repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the private hallwayIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19349918
  • C
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at laundry roomIssued Oct 30, 2026 · fix by Nov 5, 2026 overdue · Violation #19343084
  • C
    Other repairsReplace with new the missing knob at radiator shut off valve , east wall in the kitchenIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19325199
  • B
    Broken doors or locksProperly repair or replace the broken or defective gasket at refrigerator door in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19325200
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak over the , window frame , 1st from west at north in the 1st room from north at westIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19325202
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at westIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19325203
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from north at eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19325204
  • B
    Other repairsProperly repair with similar material the broken or defective cracked ceramic floor tiles in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19325193
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19325205
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19325210
  • B
    Broken doors or locksProperly repair or replace the broken or defective cracked marble saddle at door in the entrance at south wall in the foyerIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19325192
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in at, bathtub waste line in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · rent impairing · Violation #19325195
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19325207
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at, compactor closet door , north wall , at public hall, 6th storyIssued Oct 26, 2026 · fix by Nov 9, 2026 overdue · Violation #19325211
  • B
    MoldTrace and repair the source and abate the visible mold condition more than 10 sq ft but less than 30sq ft observed at, ceiling, north window frame , north and…Issued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19278226
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles at in shower stall in the bathroomIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19278228
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19278231
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from northIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19278238
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 7, 2026 · fix by Nov 2, 2026 overdue · Violation #19278240
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 7, 2026 · fix by Nov 2, 2026 overdue · Violation #19278241
  • B
    Broken doors or locksProperly repair or replace the broken or defective gasket at refrigerator door in the kitchenIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19278244
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of exposed iron anchor with missing handrail at, north wall at east stairs , northeast section, building 's lobby ,…Issued Oct 7, 2026 · fix by Oct 13, 2026 overdue · Violation #19278246
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at westIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19278223
  • B
    Broken doors or locksReplace with new the missing metal door at, base cabinet , west wall , in the bathroomIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19278230
  • B
    Broken doors or locksProperly repair or replace the broken or defective cracked door in the entrance at east wall in the 1st room from north at westIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19278237
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from northIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19278239
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Oct 7, 2026 · fix by Nov 2, 2026 overdue · Violation #19278242
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19278243
  • B
    Broken doors or locksReplace with new the missing knob at south closet door in the 1st room from north at westIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19278236
  • B
    Broken doors or locksReplace with new the missing door saddle in the entrance at east wall in the 1st room from north at westIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19278234
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at north wall in the 1st room from north at westIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19278222
  • C
    Other repairsProperly repair or replace the broken or defective spring balances at lower sash window, 2nd from north at east wall in the 1st room from north at westIssued Oct 7, 2026 · fix by Oct 13, 2026 overdue · Violation #19278233
  • C
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of extension cord use from kitchen to north 2 room in the kitchenIssued Sep 30, 2026 · fix by Oct 6, 2026 overdue · Violation #19261032
  • C
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed wire infront of elevator at ceiling at cellarIssued Sep 30, 2026 · fix by Oct 6, 2026 overdue · Violation #19261034
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 29, 2026 · fix by Oct 25, 2026 overdue · Violation #19254751
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchenIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19254756
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 29, 2026 · fix by Oct 25, 2026 overdue · Violation #19254752
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 21, 2026 · fix by Oct 17, 2026 overdue · Violation #19233816
  • C
    Lead paint& 309 m/d law abate the nuisance consisting of key oparated lock at door leading to room with fire escape in the entire apartmentIssued Sep 3, 2026 · fix by Sep 9, 2026 overdue · Violation #19187940
  • C
    Plumbing, sinks and toiletsRepair the broken or defective connection waste line pipe at sink in the kitchenIssued Sep 3, 2026 · fix by Sep 9, 2026 overdue · Violation #19187933
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the kitchenIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19187926
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Sep 3, 2026 · fix by Sep 29, 2026 overdue · Violation #19187910

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

812017
662018
862019
232020
722021
1252022
1802023
3102024
2412025
1872026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 1,434 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.