Housing violations · Manhattanville-West Harlem
412 West 129 Street, Manhattan
10027 · 31 apartments · 5 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
6 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs11
- Peeling paint and plaster10
- Broken doors or locks7
- Missing smoke or CO detector7
- Mold6
- Plumbing, sinks and toilets6
- Roaches5
- Mice or rats5
- Lead paint4
- No heat or hot water2
- Leaks and water damage1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 15 closed · NYC typical: 87 days
from 6 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Oct 28, 2026 · fix by Nov 3, 2026 overdue · Violation #19329789
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 28, 2026 · fix by Oct 27, 2026 overdue · rent impairing · Violation #19329788
- BMoldTrace and repair the source and abate the visible mold condition ovserved greater than 10 sqft at west wall in the 3rd room from northIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19327863
- BLeaks and water damageRepair the roof so that it will not leak at ceiling and west wall in the 3rd room from northIssued Oct 26, 2026 · fix by Nov 30, 2026 · rent impairing · Violation #19327865
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 3rd room from northIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19327864
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from eastIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19310046
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west wall in the 2nd room from eastIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19310045
- BBroken doors or locksProperly repair or replace the broken or defective upper wall cabinet doors at east wall in the kitchenIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19310044
- BPlumbing, sinks and toiletsRepair the broken or defective connection wasteline pipe at wash/basin in the 2nd bathroom from eastIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19310042
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective cabinet at wash basin at north wall in the 2nd bathroom from eastIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19310041
- BOther repairsRemove all encumbrances consisting of range at public hall, 3rd storyIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · rent impairing · Violation #19154744
- BOther repairsRemove all encumbrances consisting of range at public hall, 5th storyIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · rent impairing · Violation #19154743
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at west wall in the bathroomIssued Jul 28, 2026 · fix by Sep 1, 2026 overdue · Violation #19111710
- CMoldTrace and repair the source and abate the visible mold condition at ceiling in the bathroomIssued Apr 6, 2026 · fix by May 2, 2026 overdue · Violation #18762121
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Mar 18, 2026 · fix by Mar 18, 2026 overdue · rent impairing · Violation #18718545
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from northIssued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18527511
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west wall in the 1st room from northIssued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18527510
- BOther repairsProperly repair or replace the broken or defective lower sash counter balance at east window on north wall in the 1st room from north at westIssued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18527512
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18527513
- BLead paint& 309 m/d law abate the nuisance consisting of key operated lock installed at the door leading to fire escape window in the 1st room from northIssued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18527509
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Oct 21, 2025 · fix by Nov 25, 2025 overdue · Violation #18298563
- BLead paintProperly repair or replace the broken or defective latch set at fire door leading to south yard at public hall, 1st storyIssued Aug 14, 2025 · fix by Sep 18, 2025 overdue · Violation #18159526
- BMoldTrace and repair the source and abate the visible mold condition less then 10sq ft at ceiling in the bathroomIssued Mar 7, 2025 · fix by Apr 11, 2025 overdue · Violation #17751704
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 7, 2024 · fix by Dec 3, 2024 overdue · Violation #17401557
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Nov 27, 2023 · fix by Jan 1, 2024 overdue · Violation #16440376
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Nov 27, 2023 · fix by Jan 1, 2024 overdue · rent impairing · Violation #16440378
- BOther repairsProperly repair with similar material the broken or defective ceramic tile floor tiles in the bathroomIssued Nov 21, 2023 · fix by Dec 26, 2023 overdue · Violation #16414296
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued May 31, 2023 · fix by Jul 5, 2023 overdue · Violation #16017848
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 31, 2023 · fix by Jun 26, 2023 overdue · Violation #16017855
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 31, 2023 · fix by Jun 26, 2023 overdue · Violation #16017856
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued May 31, 2023 · fix by Jul 5, 2023 overdue · Violation #16017846
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). inoperative in the entire apartmentIssued May 23, 2023 · fix by Jun 27, 2023 overdue · Violation #16002079
- BMissing smoke or CO detectorRepair or replace the smoke detector inoperative in the entire apartmentIssued May 23, 2023 · fix by Jun 27, 2023 overdue · Violation #16002081
- CMice or ratsAbate the infestation consisting of miceIssued Nov 10, 2022 · fix by Dec 6, 2022 overdue · Violation #15514305
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 1st room from northIssued Nov 10, 2022 · fix by Nov 16, 2022 overdue · Violation #15514308
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 1st room from northIssued Nov 10, 2022 · fix by Nov 16, 2022 overdue · Violation #15514301
- CRoachesAbate the infestation consisting of roachesIssued Nov 10, 2022 · fix by Dec 6, 2022 overdue · Violation #15514304
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 10, 2022 · fix by Sep 5, 2022 overdue · Violation #15302434
- BBroken doors or locks& 309 m/d law abate the nuisance consisting of lock at entrance door to window of fire escape in the 1st room from northIssued Jun 17, 2022 · fix by Jul 22, 2022 overdue · Violation #15222055
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 2, 2021 · fix by Aug 28, 2021 overdue · Violation #14444205
- BOther repairsProperly repair with similar material the broken or defective wood cabinet at south wall in the kitchenIssued Aug 2, 2021 · fix by Sep 6, 2021 overdue · Violation #14444200
- BPlumbing, sinks and toiletsReplace with new the broken or defective wood sink base cabinet in the kitchenIssued Aug 2, 2021 · fix by Sep 6, 2021 overdue · Violation #14444201
- CMoldTrace and repair the source and abate the visible mold condition approxiamately 14 square feet at ceiiling in the bathroomIssued Jun 28, 2021 · fix by Jul 24, 2021 overdue · Violation #14408347
- BOther repairsProperly repair with similar material the broken or defective wall mount wood cabinet at south wall in the kitchenIssued Jun 16, 2021 · fix by Jul 21, 2021 overdue · Violation #14389735
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 26, 2021 · fix by Jun 21, 2021 overdue · Violation #14356547
- BBroken doors or locksReplace with new the broken or defective gasket seal on refrigerator door in the kitchenIssued May 25, 2021 · fix by Jun 29, 2021 overdue · Violation #14163283
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 28, 2021 · fix by May 24, 2021 overdue · Violation #14296926
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 28, 2021 · fix by May 24, 2021 overdue · Violation #14296929
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Apr 28, 2021 · fix by Jun 2, 2021 overdue · Violation #14296942
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Apr 28, 2021 · fix by Jun 2, 2021 overdue · Violation #14296943
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Apr 2, 2021 · fix by May 7, 2021 overdue · Violation #14055275
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective rooted wood base cabinet at sink in the kitchenIssued Aug 13, 2019 · fix by Sep 17, 2019 overdue · Violation #13219240
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.