Housing violations · Harlem (North)
28 West 131 Street, Manhattan
10037 · 25 apartments · 6 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Broken doors or locks21
- Peeling paint and plaster21
- Other repairs13
- Leaks and water damage11
- Missing smoke or CO detector8
- Roaches7
- Electrical problems7
- Mice or rats4
- Mold3
- No heat or hot water2
- Missing window guards2
- Plumbing, sinks and toilets1
- Lead paint1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 22 closed · NYC typical: 87 days
from 11 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock at door entrance in the foyerIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19345530
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st bathroom from northIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19345529
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set , 1st storyIssued Oct 8, 2026 · fix by Oct 22, 2026 overdue · Violation #19283244
- BBroken doors or locksProperly repair or replace the broken or defective refrigerator lower door gasket in the kitchenIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19164703
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above the ceiling in the 2nd room from northIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19164708
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the bathroomIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19164707
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above the ceiling in the private hallwayIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19164706
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the private hallwayIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19164705
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 27, 2026 · fix by Sep 22, 2026 overdue · Violation #19164702
- BOther repairsProperly repair or replace the broken or defective bell buzzer intercom system from building entrance to panel at east wall in the private hallwayIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19164704
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the 2nd room from northIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19164709
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the 1st bathroom from northIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19165513
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19149847
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19149848
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Aug 21, 2026 · fix by Sep 4, 2026 overdue · Violation #19149846
- BElectrical problemsProperly repair or replace the broken or defective electrical wall outlet at west wall in the private hallwayIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19138812
- BOther repairsProperly repair with similar material the broken or defective upper wall cabinet at north, and west wall in the kitchenIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19138807
- BBroken doors or locksRefit door in the 4th room from northIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19138806
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak over the ceiling in the bathroomIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19138804
- BOther repairsProperly repair or replace the broken or defective bell buzzer system from building enterance to east wall in the private hallwayIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19138805
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19138808
- BBroken doors or locksProperly repair or replace the broken or defective door in the 2nd room from north at westIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19138809
- BBroken doors or locksProperly repair or replace the broken or defective closet door at south in the 2nd room from north at westIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19138810
- BBroken doors or locksRefit door in the entranceIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19138813
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock at door in the entranceIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19138814
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 17, 2026 · fix by Sep 12, 2026 overdue · Violation #19138815
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 17, 2026 · fix by Sep 12, 2026 overdue · Violation #19138816
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and west wall at vestibule , 1st storyIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #18985652
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 8, 2026 · fix by Jun 7, 2026 overdue · rent impairing · Violation #18985650
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Jun 8, 2026 · fix by Jun 14, 2026 overdue · Violation #18985651
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st bathroom from northIssued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18803704
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at west wall in the kitchenIssued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18803709
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective bent door frame in the entranceIssued Apr 22, 2026 · fix by May 6, 2026 overdue · Violation #18803705
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Apr 22, 2026 · fix by May 18, 2026 overdue · Violation #18803713
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at ceiling in the 1st private hallway from northIssued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18803712
- BElectrical problemsReplace with new the missing electrical switch cover plate at west wall in the 2nd private hallway from northIssued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18803711
- BElectrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the 2nd private hallway from northIssued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18803710
- BElectrical problemsReplace with new the missing electrical outlet cover plate at south wall in the 4th room from northIssued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18803708
- BElectrical problemsReplace with new the missing electrical switch cover plate at west wall in the foyerIssued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18803707
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock at door in the entranceIssued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18803706
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st bathroom from northIssued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18803714
- CBroken doors or locksProvide ready access to buildings heating system door is locked at basement at boiler roomIssued Apr 17, 2026 · fix by Apr 23, 2026 overdue · Violation #18795129
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the private hallwayIssued Apr 17, 2026 · fix by May 22, 2026 overdue · Violation #18795131
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Apr 15, 2026 · fix by Apr 15, 2026 overdue · rent impairing · Violation #18787977
- BBroken doors or locksRefit the door at entrance in the 5th room from northIssued Apr 3, 2026 · fix by May 8, 2026 overdue · Violation #18758112
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Apr 3, 2026 · fix by May 8, 2026 overdue · Violation #18758113
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in drain pipe at bathtub in the bathroomIssued Apr 3, 2026 · fix by May 8, 2026 overdue · rent impairing · Violation #18749030
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Apr 3, 2026 · fix by Apr 17, 2026 overdue · Violation #18758110
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Apr 3, 2026 · fix by May 8, 2026 overdue · Violation #18749029
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 31, 2026 · fix by Apr 26, 2026 overdue · Violation #18749027
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 31, 2026 · fix by Apr 26, 2026 overdue · Violation #18749028
- CLead paintReplace or repair the self-closing doors that is missing or defective hinges at door leading to north yard at basementIssued Dec 26, 2025 · fix by Jan 9, 2026 overdue · Violation #18527870
- BOther repairsProperly repair with similar material the broken or defective wooden floor in the 1st room from north at eastIssued Nov 21, 2025 · fix by Dec 26, 2025 overdue · Violation #18393061
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at westIssued Nov 21, 2025 · fix by Dec 26, 2025 overdue · Violation #18393060
- BOther repairsProperly repair with similar material the broken or defective wooden floor in the foyerIssued Nov 21, 2025 · fix by Dec 26, 2025 overdue · Violation #18393066
- BOther repairsProperly repair or replace the broken or defective intercom systemIssued Aug 15, 2025 · fix by Sep 19, 2025 overdue · Violation #18170863
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jun 27, 2025 · fix by Jul 11, 2025 overdue · Violation #18048165
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 5, 2024 · fix by Jul 1, 2024 overdue · Violation #17025149
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Jun 5, 2024 · fix by Jul 1, 2024 overdue · Violation #17025144
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 5, 2024 · fix by Jul 1, 2024 overdue · Violation #17025148
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.