Housing violations · Harlem (North)
128 West 134 Street, Manhattan
10030 · 10 apartments · 5 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster5
- Mold3
- Missing smoke or CO detector1
- Other repairs1
- Broken doors or locks1
- Bedbugs1
- Mice or rats1
- Plumbing, sinks and toilets1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 2 closed · NYC typical: 87 days
from 2 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 6, 2026 · fix by Sep 10, 2026 overdue · Violation #19124383
- COther repairsProperly repair or replace the broken or defective glass pane at lower sash window in the 2nd room from north at eastIssued Aug 6, 2026 · fix by Aug 12, 2026 overdue · Violation #19124384
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchenIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19113988
- BBroken doors or locksReplace with new the missing door at upper wall cabinet at north wall in the kitchenIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19113977
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 4, 2023 · fix by May 30, 2023 overdue · Violation #15956302
- BMoldTrace and repair the source and abate the visible mold condition 10 sq ft at ceiling in the bathroomIssued Oct 11, 2022 · fix by Nov 15, 2022 overdue · Violation #15412898
- BMoldTrace and repair the source and abate the visible mold condition 10 sq ft at ceiling in the bathroomIssued Oct 6, 2022 · fix by Nov 10, 2022 overdue · Violation #15403337
- BMoldTrace and repair the source and abate the visible mold condition approx.15 sq.ft at ceiling in the bathroomIssued Apr 19, 2022 · fix by May 24, 2022 overdue · Violation #15115625
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the walls in the 1st bathroom from northIssued Sep 21, 2020 · fix by Oct 26, 2020 overdue · Violation #13779683
- BPlumbing, sinks and toiletsProperly repair the broken or defective mechanical stopper at bathtub in the bathroomIssued Aug 22, 2018 · fix by Sep 26, 2018 overdue · Violation #12541414
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.