Housing violations · Manhattanville-West Harlem
510 West 134 Street, Manhattan
10031 · 16 apartments · 5 stories · City Council district 7
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
6 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs13
- Peeling paint and plaster11
- Leaks and water damage9
- Broken doors or locks6
- Mold4
- Roaches3
- Plumbing, sinks and toilets3
- Electrical problems2
- No heat or hot water1
- Lead paint1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 4 closed · NYC typical: 87 days
from 19 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19321011
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19321007
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq.ft at west and north wall in the bathroomIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19321012
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19321008
- BElectrical problemsProperly repair or replace the broken or defective outlet switch at north wall in the entire apartmentIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19321010
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19321013
- BLeaks and water damageRepair the roof so that it will not leak at the ceiling in the 5th room from northIssued Apr 20, 2026 · fix by May 25, 2026 overdue · rent impairing · Violation #18796309
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the bathroomIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18796317
- BLeaks and water damageRepair the roof so that it will not leak at the ceiling in the bathroomIssued Apr 20, 2026 · fix by May 25, 2026 overdue · rent impairing · Violation #18796319
- BLeaks and water damageRepair the roof so that it will not leak at the ceiling in the private hallwayIssued Apr 20, 2026 · fix by May 25, 2026 overdue · rent impairing · Violation #18796313
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at all walls in the bathroomIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18796318
- COther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Apr 20, 2026 · fix by Apr 26, 2026 overdue · Violation #18796312
- COther repairsProperly repair with similar material the broken or defective ceramic floor tile in the bathroomIssued Apr 20, 2026 · fix by Apr 26, 2026 overdue · Violation #18796315
- CPlumbing, sinks and toiletsProperly repair with similar material the broken or defective wood sink base cabinet at north wall in the kitchenIssued Apr 20, 2026 · fix by Apr 26, 2026 overdue · Violation #18796320
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the kitchenIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18796321
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at all walls in the kitchenIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18796323
- BLeaks and water damageRepair the roof so that it will not leak at the ceiling in the kitchenIssued Apr 20, 2026 · fix by May 25, 2026 overdue · rent impairing · Violation #18796322
- BElectrical problemsProperly repair or replace the broken or defective electrical light fixture at the ceiling in the 5th room from northIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18796311
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 5th room from northIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18796310
- CNo heat or hot waterProvide adequate supply of hot water for the fixtures at kitchen and bathroom in the entire apartmentIssued Feb 19, 2026 · fix by Feb 25, 2026 overdue · rent impairing · Violation #18645995
- COther repairsProvide adequate supply of cold water for the fixtures at kitchen and bathroom in the entire apartmentIssued Feb 19, 2026 · fix by Feb 25, 2026 overdue · rent impairing · Violation #18645996
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Jan 29, 2026 · fix by Feb 4, 2026 overdue · Violation #18602526
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Dec 22, 2025 · fix by Jan 26, 2026 overdue · Violation #18517337
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Dec 22, 2025 · fix by Jan 5, 2026 overdue · Violation #18517336
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak ceiling in the bathroomIssued Dec 22, 2025 · fix by Jan 26, 2026 overdue · Violation #18517338
- BMoldTrace and repair the source and abate the visible mold condition less than 15 square feet at ceiling in the bathroomIssued Dec 22, 2025 · fix by Jan 26, 2026 overdue · Violation #18517339
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at eastIssued Mar 26, 2025 · fix by Apr 30, 2025 overdue · Violation #17781192
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Mar 26, 2025 · fix by Apr 30, 2025 overdue · Violation #17781191
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Mar 26, 2025 · fix by Apr 30, 2025 overdue · Violation #17781190
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Mar 26, 2025 · fix by Apr 30, 2025 overdue · Violation #17781189
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Mar 6, 2025 · fix by Apr 10, 2025 overdue · Violation #17735115
- BMoldTrace and repair the source and abate the visible mold condition approx 8 sq ft at ceiling in the bathroomIssued Sep 23, 2024 · fix by Oct 28, 2024 overdue · Violation #17299796
- BOther repairsProperly repair or replace the broken or defective escutcheon plate heat riser at ceiling in the kitchenIssued Nov 8, 2023 · fix by Dec 13, 2023 overdue · Violation #16353489
- BOther repairsProperly repair with similar material the broken or defective wood flooring under radiator in the 2nd room from north at westIssued Nov 3, 2023 · fix by Dec 8, 2023 overdue · Violation #16353487
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at eastIssued Nov 3, 2023 · fix by Dec 8, 2023 overdue · Violation #16353488
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 1st room from north at westIssued Nov 3, 2023 · fix by Nov 9, 2023 overdue · Violation #16353490
- BOther repairsProperly repair with similar material the broken or defective caulking around bathub in the bathroomIssued Nov 3, 2023 · fix by Dec 8, 2023 overdue · Violation #16353492
- BMoldTrace and repair the source and abate the visible mold condition at north wall under kitchen sink (approx 3 sq ft) in the kitchenIssued May 23, 2023 · fix by Jun 27, 2023 overdue · Violation #16002883
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Jan 23, 2023 · fix by Feb 27, 2023 overdue · Violation #15672800
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 23, 2023 · fix by Feb 18, 2023 overdue · Violation #15672791
- BOther repairsProperly repair the broken or defective bell buzzer intrecom system from the building entranceIssued Dec 28, 2022 · fix by Feb 1, 2023 overdue · Violation #15629074
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 26, 2022 · fix by Jun 21, 2022 overdue · Violation #15174349
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.