Housing violations · Manhattanville-West Harlem
513 West 134 Street, Manhattan
10031 · 20 apartments · 5 stories · City Council district 7
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster13
- Other repairs13
- Mold4
- Mice or rats3
- Roaches3
- Lead paint3
- Leaks and water damage2
- Missing smoke or CO detector2
- Broken doors or locks1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 2 closed · NYC typical: 87 days
NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft at north wall under wash basin in the bathroomIssued Dec 12, 2025 · fix by Jan 16, 2026 overdue · Violation #18507676
- BMoldTrace and repair the source and abate the visible mold condition less than 10sqft at west wall in the bathroomIssued Dec 10, 2025 · fix by Jan 14, 2026 overdue · Violation #18500966
- BMoldTrace and repair the source and abate the visible mold condition less than 10sqft at ceiling in the kitchenIssued Dec 10, 2025 · fix by Jan 14, 2026 overdue · Violation #18500967
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square feet at west wall in the bathroomIssued Nov 12, 2025 · fix by Dec 17, 2025 overdue · Violation #18366445
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchenIssued Aug 14, 2025 · fix by Sep 18, 2025 overdue · Violation #18156122
- BOther repairsProperly repair or replace the broken or defective lower sash counter balance at west wall window in the 5th room from northIssued Aug 14, 2025 · fix by Sep 18, 2025 overdue · Violation #18156126
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 14, 2025 · fix by Sep 9, 2025 overdue · Violation #18156123
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north and south wall in the kitchenIssued Aug 14, 2025 · fix by Sep 18, 2025 overdue · Violation #18156130
- BBroken doors or locksProperly repair or replace the broken or defective door knob in the bathroomIssued Aug 14, 2025 · fix by Sep 18, 2025 overdue · Violation #18156129
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north and south wall in the bathroomIssued Aug 14, 2025 · fix by Sep 18, 2025 overdue · Violation #18156125
- BOther repairsProperly repair with similar material the broken or defective ceramic tile at west wall in the bathroomIssued Aug 14, 2025 · fix by Sep 18, 2025 overdue · Violation #18156128
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 14, 2025 · fix by Sep 9, 2025 overdue · Violation #18156127
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from northIssued Aug 12, 2025 · fix by Sep 16, 2025 overdue · Violation #18146928
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 12, 2025 · fix by Sep 7, 2025 overdue · Violation #18146921
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Aug 12, 2025 · fix by Sep 16, 2025 overdue · Violation #18146922
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at west wall in the bathroomIssued Aug 12, 2025 · fix by Sep 16, 2025 overdue · Violation #18146924
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the kitchenIssued Aug 12, 2025 · fix by Sep 16, 2025 overdue · Violation #18146926
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from northIssued Aug 12, 2025 · fix by Sep 16, 2025 overdue · Violation #18146927
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 12, 2025 · fix by Sep 7, 2025 overdue · Violation #18146920
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the private hallwayIssued Aug 12, 2025 · fix by Sep 16, 2025 overdue · Violation #18146929
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jul 14, 2025 · fix by Aug 18, 2025 overdue · Violation #18083448
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak ceiling in the 2nd room from northIssued Jul 14, 2025 · fix by Aug 18, 2025 overdue · Violation #18083441
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from northIssued Jul 14, 2025 · fix by Aug 18, 2025 overdue · Violation #18083442
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Jul 14, 2025 · fix by Aug 18, 2025 overdue · Violation #18083443
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Jul 14, 2025 · fix by Aug 18, 2025 overdue · Violation #18083444
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Jul 14, 2025 · fix by Aug 18, 2025 overdue · Violation #18083445
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the private hallwayIssued Jul 14, 2025 · fix by Aug 18, 2025 overdue · Violation #18083446
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 5th room from northIssued Jul 14, 2025 · fix by Aug 18, 2025 overdue · Violation #18083450
- BOther repairsReplace with new the missing upper escutcheon plate at riser pipe at west wall in the bathroomIssued Jul 14, 2025 · fix by Aug 18, 2025 overdue · Violation #18083451
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroomIssued Jul 14, 2025 · fix by Aug 18, 2025 overdue · Violation #18083452
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 5th room from northIssued Jul 14, 2025 · fix by Aug 18, 2025 overdue · Violation #18083449
- CLeaks and water damageRepair the roof so that it will not leak at ceiling in the 3rd room from northIssued Mar 14, 2024 · fix by Mar 20, 2024 overdue · rent impairing · Violation #16742626
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from northIssued Mar 14, 2024 · fix by Mar 20, 2024 overdue · Violation #16742625
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Dec 4, 2023 · fix by Jan 8, 2024 overdue · Violation #16287125
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 9, 2022 · fix by Apr 4, 2022 overdue · Violation #15014738
- BOther repairsReplace with new the missing escutcheon plate at riser top at both risers in the kitchenIssued Mar 9, 2022 · fix by Apr 13, 2022 overdue · Violation #15014750
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 9, 2022 · fix by Apr 4, 2022 overdue · Violation #15014737
- BOther repairsProperly repair with similar material the broken or defective sloping shower stall sub floor in the bathroomIssued Mar 9, 2022 · fix by Apr 13, 2022 overdue · Violation #15004333
- BOther repairsReplace with new the missing eschutchen plate heat riser at ceiling in the bathroomIssued Nov 16, 2021 · fix by Dec 21, 2021 overdue · Violation #14673434
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 5th room from northIssued Nov 16, 2021 · fix by Dec 21, 2021 overdue · Violation #14673440
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Feb 8, 2008 · fix by Mar 5, 2008 overdue · Violation #7137451
- CLead paintRemove or cover in a manner approved by the department the peeling lead paint west wall 2 sty southwestIssued Nov 19, 1996 · fix by Dec 9, 1996 overdue · Violation #3098022
- CLead paintRemove or cover in a manner approved by the department the peeling lead paint window frame 2 sty southwestIssued Nov 19, 1996 · fix by Dec 9, 1996 overdue · Violation #3098023
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.