Housing violations · Harlem (North)
181 West 135 Street, Manhattan
10030 · 24 apartments · 6 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
28 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs104
- Peeling paint and plaster64
- Broken doors or locks36
- Mice or rats31
- Missing smoke or CO detector30
- Leaks and water damage29
- Electrical problems27
- Plumbing, sinks and toilets26
- Mold21
- No heat or hot water8
- Roaches7
- Lead paint3
- Bedbugs3
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 52 closed · NYC typical: 87 days
from 23 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sqft around window at south wall in the bathroomIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19242361
- BMoldTrace and repair the source and abate the visible mold condition less than 10sqft at north wall in the 2nd room from eastIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19242362
- BMoldTrace and repair the source and abate the visible mold condition less then 10sq ft of mold on east wall in the closet in the 5th room from northIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19234988
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and west wall at landing at 2nd public hall stairs from east, 4th storyIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19173693
- BOther repairsProperly repair or replace the broken or defective light fixtures at north and east walls at landing at 2nd public hall stairs from east, 6th storyIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19173688
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation system in the bathroomIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19173681
- BOther repairsProperly repair or replace the broken or defective light fixtures at north and east walls at landing at 2nd public hall stairs from east, 4th storyIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19173691
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and west wall at landing at 2nd public hall stairs from east,…Issued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19173695
- BOther repairsProperly repair or replace the broken or defective light fixtures at north and east walls at landing at 2nd public hall stairs from east, 3rd storyIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19173698
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq ft at ceiling and all walls in the bathroomIssued Sep 3, 2026 · fix by Sep 29, 2026 overdue · Violation #19173680
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19174205
- CMoldTrace and repair the source and abate the visible mold condition greater than 20 sqft at ceiling and south wall in the bathroomIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19181069
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the private hallwayIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19173714
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation system in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19174180
- BPlumbing, sinks and toiletsRepair the broken or defective connection at wasteline at wash basin in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19174204
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19141861
- BOther repairsProperly repair or replace the broken or defective ceiling light fixture at public hall at northwest , 3rd storyIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19141878
- BOther repairsProperly repair or replace the broken or defective ceiling light fixture at landing at public hall stairs at east , 3rd storyIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19141877
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 14, 2026 · fix by Sep 9, 2026 overdue · Violation #19141869
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 14, 2026 · fix by Sep 9, 2026 overdue · Violation #19141868
- COther repairsProperly repair or replace the broken or defective counter balances at lowere window sash in the 1st room from eastIssued Aug 14, 2026 · fix by Aug 20, 2026 overdue · Violation #19141866
- COther repairsProperly repair or replace the broken or defective counter balances at upper window sash, 1st from east at north wall in the 4th room from east at northIssued Aug 14, 2026 · fix by Aug 20, 2026 overdue · Violation #19141881
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the 4th room from east at northIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19141882
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 4th room from east at northIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19141883
- COther repairsProperly repair or replace the broken or defective counter balances at upper window sash in the bathroomIssued Aug 14, 2026 · fix by Aug 20, 2026 overdue · Violation #19141884
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective wood base cabinet at sink in the kitchenIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19141886
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 14, 2026 · fix by Aug 20, 2026 overdue · Violation #19141863
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 14, 2026 · fix by Sep 9, 2026 overdue · Violation #19141888
- BMoldTrace and repair the source and abate the visible mold condition less than 10sqft at ceiling, east and south walls in the bathroomIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19098301
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch assembly at east fire exit door at public hall, 4th storyIssued Jul 21, 2026 · fix by Aug 4, 2026 overdue · Violation #19071934
- BOther repairsProperly repair with similar material the broken or defective roofing membrane at northwest at roofIssued Jul 21, 2026 · fix by Aug 25, 2026 overdue · Violation #19071937
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch assembly at east fire exit door at public hall, 5th storyIssued Jul 21, 2026 · fix by Aug 4, 2026 overdue · Violation #19071935
- BOther repairsProperly repair with similar material the broken or defective vinyl flooring in the private hallwayIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19071929
- BOther repairsProperly repair or replace the broken or defective ceiling light fixture in the 3rd room from eastIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19071927
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the foyerIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19071925
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 13, 2026 · fix by Aug 8, 2026 overdue · Violation #19071939
- BOther repairsProperly repair with similar material the broken or defective fire retardant materials at ceiling and all walls at bulkhead area at a stairwayIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18950950
- BBroken doors or locksProperly repair or replace the broken or defective wood door at upper wall cabinet at north wall in the kitchenIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18950947
- BOther repairsProperly repair or replace the broken or defective bell buzzer intercom system from building entrance to panel at west wall in the private hallwayIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18950946
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18950945
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18950944
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 1st room from northIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18950941
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18950940
- CLead paintReplace or repair the self-closing doors that is missing or defective hinges at door leading to b stairway at cellarIssued May 26, 2026 · fix by Jun 9, 2026 overdue · Violation #18950954
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed bx electrical wires at east wall in the kitchenIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18950936
- BOther repairsAbate the nuisance consisting of pests. evidence of ants in the entire apartmentIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18950935
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from eastIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18950932
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the private hallwayIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18950931
- BLeaks and water damageRepair the roof so that it will not leak above ceiling at bulkhead area at a stairwayIssued May 26, 2026 · fix by Jun 30, 2026 overdue · rent impairing · Violation #18950955
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at boiler roomIssued May 26, 2026 · fix by Jun 9, 2026 overdue · Violation #18950948
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 26, 2026 · fix by Jun 21, 2026 overdue · Violation #18950934
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18950930
- BOther repairsProperly repair with similar material the broken or defective wood bottom shelf at base cabinet at east wall in the kitchenIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18950928
- BOther repairsProperly repair or replace the broken or defective mechanical vent at east wall in the kitchenIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18950927
- BOther repairsProperly repair with similar material the broken or defective fire retardant materials at ceiling and all walls at bulkhead area by b stairway at fire stairsIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18950952
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18948601
- BElectrical problemsProperly repair or replace the broken or defective electrical wall outlet at south wall in the 5th room from northIssued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18948610
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 2nd room from northIssued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18948600
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain glaze finish by way of reglazing the bathtub in the bathroomIssued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18948602
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18948603
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.