Housing violations · Manhattanville-West Harlem
629 West 135 Street, Manhattan
10031 · 31 apartments · 6 stories · City Council district 7
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
4 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs17
- Peeling paint and plaster7
- Mice or rats7
- Leaks and water damage3
- Mold3
- Broken doors or locks2
- Plumbing, sinks and toilets2
- Missing smoke or CO detector2
- Lead paint2
- Roaches1
- Bedbugs1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 34 closed · NYC typical: 87 days
from 55 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from east at southIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19368857
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19368858
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color south wall and ceiling. in the kitchenIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19368859
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the private hallwayIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19368860
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the foyerIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19368861
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 13, 2026 · fix by Dec 9, 2026 · Violation #19368848
- BBroken doors or locksRefit lower cabinet door at west wall. in the kitchenIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19368849
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze of the bathtub in the bathroomIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19368850
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19368851
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east at northIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19368852
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from east at northIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19368853
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 4th room from east at southIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19368854
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around the bathtub in the bathroomIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19368856
- BLeaks and water damageRepair the roof so that it will not leak above the ceiling (infront of apt.62) at public hall, 6th storyIssued Oct 13, 2026 · fix by Nov 17, 2026 · rent impairing · Violation #19292967
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292966
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling and east wall inside the closet on south wall. in the foyerIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292963
- BOther repairsRefit window upper sash at north wall in the 2nd room from eastIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292964
- BLeaks and water damageRepair the roof so that it will not leak above the ceiling in the foyerIssued Oct 13, 2026 · fix by Nov 17, 2026 · rent impairing · Violation #19292965
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling (in front ofIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292968
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19278405
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19278404
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19278403
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at east wall in the kitchenIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19278402
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · rent impairing · Violation #19278401
- BOther repairsProperly repair or replace the broken or defective bell/buzzer intercom from building front entrance to panel at east wall in the kitchenIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19278400
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 8, 2026 · fix by Nov 3, 2026 overdue · Violation #19278406
- BBedbugsAbate the infestation consisting of bedbugs in the entire apartmentIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19148697
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air condition unit protruding more than 4 inches from window sill…Issued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19148698
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes bbq grill on 5th story east balcony at building front at fire…Issued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19148699
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Mar 16, 2026 · fix by Mar 30, 2026 overdue · Violation #18716048
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 27, 2025 · fix by Jul 21, 2025 overdue · Violation #18059666
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the kitchenIssued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17899603
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at north, east and south walls in the bathroomIssued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17899601
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 19, 2025 · fix by Jun 14, 2025 overdue · Violation #17899604
- CMice or ratsAbate the infestation consisting of rodents rats at fire passage wayIssued Jun 17, 2024 · fix by Jul 13, 2024 overdue · rent impairing · Violation #17054187
- BOther repairsProperly repair with similar material the broken or defective lifting wood floor in the private hallwayIssued Jun 14, 2024 · fix by Jul 19, 2024 overdue · Violation #17054088
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 14, 2024 · fix by Jul 10, 2024 overdue · Violation #17054092
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 15, 2024 · fix by May 11, 2024 overdue · Violation #16878100
- CMoldTrace and repair the source and abate the visible mold condition approximately 15 sq.ft at east wall and 15 sq.ft at north wall in the bathroomIssued Feb 28, 2024 · fix by Mar 25, 2024 overdue · Violation #16704091
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 11, 2024 · fix by Feb 6, 2024 overdue · Violation #16582899
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Dec 4, 2023 · fix by Dec 28, 2023 overdue · Violation #16501393
- BMice or ratsAbate the nuisance consisting of vermin mice in the entire apartmentIssued Jul 17, 2007 · fix by Aug 21, 2007 overdue · Violation #6832488
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.