Housing violations · Manhattanville-West Harlem
630 West 136 Street, Manhattan
10031 · 45 apartments · 5 stories · City Council district 7
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs11
- Lead paint10
- Peeling paint and plaster2
- Leaks and water damage2
- Plumbing, sinks and toilets2
- Mold2
- Electrical problems1
- No heat or hot water1
- Broken doors or locks1
- Roaches1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 39 closed · NYC typical: 87 days
from 51 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18764121
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18764123
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the bathroomIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18764119
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at west wall in the 2nd room from northIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18764132
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at the bathtub in the bathroomIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18764127
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from northIssued Dec 29, 2025 · fix by Feb 2, 2026 overdue · Violation #18531739
- BOther repairsProperly repair or replace the broken or defective radiator at west wall in the 1st room from north at eastIssued Dec 18, 2025 · fix by Jan 22, 2026 overdue · Violation #18505040
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash in the kitchenIssued Dec 15, 2025 · fix by Jan 19, 2026 overdue · Violation #18505037
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Dec 15, 2025 · fix by Dec 14, 2025 overdue · rent impairing · Violation #18505035
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of a key operated lock installed at the door to the room with fire escape window in the 3rd room from northIssued Sep 4, 2025 · fix by Sep 10, 2025 overdue · Violation #18208323
- BMoldTrace and repair the source and abate the visible mold condition less than 1o sq ft at south and west wall in the bathroomIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17832105
- BOther repairsProperly repair with similar material the broken or defective wood subflooring in the 1st room from northIssued Mar 31, 2025 · fix by May 5, 2025 overdue · Violation #17793355
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from northIssued Feb 6, 2025 · fix by Mar 13, 2025 overdue · Violation #17677440
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at eastIssued Feb 6, 2025 · fix by Mar 13, 2025 overdue · Violation #17677453
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel bathtub glaze by method of reglazing in the bathroomIssued Dec 13, 2024 · fix by Jan 17, 2025 overdue · Violation #17551185
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 26, 2023 · fix by Oct 22, 2023 overdue · Violation #16250316
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the bathroomIssued Sep 6, 2023 · fix by Oct 11, 2023 overdue · Violation #16199199
- CMoldTrace and repair the source and abate the visible mold condition approximately 14 square feet at ceiling and 14 sq ft at west wall in the bathroomIssued May 7, 2021 · fix by Jun 2, 2021 overdue · Violation #14326212
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 22, 2020 · fix by Dec 26, 2020 overdue · Violation #13950798
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 22, 2020 · fix by Dec 26, 2020 overdue · Violation #13950799
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 22, 2020 · fix by Dec 26, 2020 overdue · Violation #13950800
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 18, 2020 · fix by Dec 22, 2020 overdue · Violation #13947868
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Dec 18, 2020 · fix by Dec 22, 2020 overdue · Violation #13947864
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 18, 2020 · fix by Dec 22, 2020 overdue · Violation #13947866
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 18, 2020 · fix by Dec 22, 2020 overdue · Violation #13947865
- CLead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Dec 10, 2020 · fix by Dec 14, 2020 overdue · Violation #13930942
- CLead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued May 20, 2019 · fix by Jun 17, 2019 overdue · Violation #13075989
- CLead paintG) adm code - correct failure to notify occupants and to investigate lead-based paint hazardsIssued May 10, 2019 · fix by Jun 7, 2019 overdue · Violation #13061217
- COther repairs-correct failure to provide to the department within 45 days of demand all records required to be maintained by ownerIssued Dec 26, 2018 · fix by Jan 23, 2019 overdue · Violation #12823295
- COther repairs-correct failure to provide to the department within 45 days of demand all records required to be maintained by ownerIssued May 6, 2008 · fix by Jun 1, 2008 overdue · Violation #7274754
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.