Housing violations · Harlem (North)
2710 Frederick Douglass Boulevard, Manhattan
10030 · 26 apartments · 6 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
5 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs27
- Peeling paint and plaster17
- Lead paint10
- Roaches9
- Mice or rats9
- Broken doors or locks5
- Mold4
- Plumbing, sinks and toilets4
- Electrical problems3
- No heat or hot water1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 40 closed · NYC typical: 87 days
from 64 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CRoachesAbate the infestation consisting of roaches at public hall, 1st storyIssued Aug 21, 2026 · fix by Sep 16, 2026 overdue · Violation #19149815
- CMoldTrace and repair the source and abate the visible mold condition more than 30 square feet at ceiling and east wall in the bathroomIssued Feb 10, 2026 · fix by Mar 8, 2026 overdue · Violation #18630281
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Feb 10, 2026 · fix by Feb 24, 2026 overdue · Violation #18630274
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sqft at ceiling in the bathroomIssued Jan 23, 2025 · fix by Feb 27, 2025 overdue · Violation #17647733
- BMoldTrace and repair the source and abate the visible mold condition less than 20 square feet at ceiling in the bathroomIssued Oct 3, 2024 · fix by Nov 7, 2024 overdue · Violation #17317452
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 3, 2024 · fix by Oct 9, 2024 overdue · Violation #17317453
- COther repairsProperly repair or replace the broken or defective upper sash glass pane at north wall window in the kitchenIssued Sep 30, 2024 · fix by Oct 6, 2024 overdue · Violation #17287474
- COther repairsProperly repair or replace the broken or defective upper sash glass pane at east window in the 3rd room from east at southIssued Sep 30, 2024 · fix by Oct 6, 2024 overdue · Violation #17287473
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Sep 25, 2024 · fix by Oct 9, 2024 overdue · Violation #17287475
- BMoldTrace and repair the source and abate the visible mold condition approximately 3 sq ft at north wall in the bathroomIssued Oct 30, 2023 · fix by Dec 4, 2023 overdue · Violation #16348546
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 4, 2023 · fix by Oct 30, 2023 overdue · Violation #16277368
- CRoachesAbate the infestation consisting of roachesIssued Sep 28, 2022 · fix by Oct 24, 2022 overdue · Violation #15397931
- CMice or ratsAbate the infestation consisting of miceIssued Sep 28, 2022 · fix by Oct 24, 2022 overdue · Violation #15397908
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 1, 2021 · fix by Oct 27, 2021 overdue · Violation #14596212
- COther repairs& 309 m/d law abate the nuisance consisting of nails installed at upper and lower sash window obstructing egress to fire escape in the kitchenIssued Sep 20, 2021 · fix by Sep 26, 2021 overdue · Violation #14556594
- COther repairs& 309 m/d law abate the nuisance consisting of plywood installed at fire escape window obstructing egress in the 1st room from northIssued Sep 20, 2021 · fix by Sep 26, 2021 overdue · Violation #14556600
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 17, 2021 · fix by Oct 13, 2021 overdue · Violation #14556611
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 17, 2021 · fix by Oct 13, 2021 overdue · Violation #14556605
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 28, 2021 · fix by May 24, 2021 overdue · Violation #14159664
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 2, 2021 · fix by Apr 28, 2021 overdue · Violation #14117189
- BLead paint& 309 m/d law abate the nuisance consisting of key operated installed lock at door leading to window to fire escape in the 1st room from north at westIssued Mar 1, 2021 · fix by Apr 5, 2021 overdue · Violation #13993977
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 28, 2021 · fix by Feb 23, 2021 overdue · Violation #13944402
- BNo heat or hot waterProvide adequate supply of hot water for the fixtures at all plumbing fixtures. in the bathroom from eastIssued Sep 25, 2019 · fix by Oct 30, 2019 overdue · rent impairing · Violation #13290203
- BPlumbing, sinks and toiletsProvide adequate supply of cold water for the fixtures at all plumbing fixtures in the bathroom from eastIssued Sep 25, 2019 · fix by Oct 30, 2019 overdue · rent impairing · Violation #13290199
- CLead paintRemove the illegal fastening key operated lock installed at room door leading to fire escape in the 4th room from east at southIssued Aug 15, 2019 · fix by Aug 23, 2019 overdue · rent impairing · Violation #13217264
- COther repairs& 309 m/d law abate the nuisance consisting of uncapped radiator shut off valve in the 3rd room from east at southIssued Aug 15, 2019 · fix by Aug 23, 2019 overdue · Violation #13217252
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 15, 2019 · fix by Sep 5, 2019 overdue · Violation #13217258
- CRoachesAbate the infestation consisting of roaches in the kitchenIssued Aug 15, 2019 · fix by Sep 5, 2019 overdue · Violation #13217257
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line bathtub in the bathroomIssued Feb 21, 2019 · fix by Mar 28, 2019 overdue · rent impairing · Violation #12917581
- BBroken doors or locksArrange and make self-closing the doors entrance in the foyerIssued Feb 21, 2019 · fix by Mar 28, 2019 overdue · Violation #12917575
- BOther repairsProperly repair the broken or defective counter balance upper sash window at east wall in the 2nd room from north at westIssued Feb 21, 2019 · fix by Mar 28, 2019 overdue · Violation #12917585
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in the waste line at sink basin in the bathroomIssued Feb 21, 2019 · fix by Mar 28, 2019 overdue · rent impairing · Violation #12917582
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the foyerIssued Feb 21, 2019 · fix by Mar 28, 2019 overdue · Violation #12917579
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Feb 21, 2019 · fix by Mar 28, 2019 overdue · Violation #12917572
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 20, 2019 · fix by Mar 13, 2019 overdue · Violation #12917573
- BOther repairsProperly repair with similar material the broken or defective uneven wood floor in the 2nd room from north at westIssued Feb 20, 2019 · fix by Mar 27, 2019 overdue · Violation #12917574
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the 2nd room from north at westIssued Feb 20, 2019 · fix by Mar 27, 2019 overdue · Violation #12917571
- BOther repairsProperly repair with similar material the broken or defective counter balance upper sash window at west wall in the 1st room from north at westIssued Feb 19, 2019 · fix by Mar 26, 2019 overdue · Violation #12915377
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 19, 2019 · fix by Mar 12, 2019 overdue · Violation #12915379
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 1st room from north at westIssued Feb 19, 2019 · fix by Mar 26, 2019 overdue · Violation #12915394
- BOther repairsProperly repair with similar material the broken or defective uneven wood floor in the 1st room from north at westIssued Feb 19, 2019 · fix by Mar 26, 2019 overdue · Violation #12915391
- BElectrical problemsProperly repair the broken or defective electric outlet at east wall in the 1st room from eastIssued Jan 30, 2017 · fix by Mar 6, 2017 overdue · Violation #11626247
- BElectrical problemsProperly repair the broken or defective electric outlets at east and west walls in the 3rd room from eastIssued Jan 30, 2017 · fix by Mar 6, 2017 overdue · Violation #11626350
- BElectrical problemsProperly repair the broken or defective electric oulets at west wall in the 2nd room from eastIssued Jan 30, 2017 · fix by Mar 6, 2017 overdue · Violation #11626275
- BOther repairsProvide escutcheon on all steam risers in the entire apartmentIssued Aug 31, 2015 · fix by Oct 5, 2015 overdue · Violation #10834769
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the entire apartmentIssued Aug 18, 2015 · fix by Sep 22, 2015 overdue · Violation #10820393
- BRoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Aug 18, 2015 · fix by Sep 22, 2015 overdue · Violation #10820391
- BOther repairsProperly repair with similar material the broken or defective vinyl tile floor in the entire apartmentIssued Aug 18, 2015 · fix by Sep 22, 2015 overdue · Violation #10820384
- BMice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued Aug 18, 2015 · fix by Sep 22, 2015 overdue · Violation #10820376
- BRoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Aug 18, 2015 · fix by Sep 22, 2015 overdue · Violation #10820338
- BMice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued Aug 18, 2015 · fix by Sep 22, 2015 overdue · Violation #10820396
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the entire apartmentIssued Aug 18, 2015 · fix by Sep 22, 2015 overdue · Violation #10820394
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 5, 2011 · fix by Oct 31, 2011 overdue · Violation #9141809
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 5, 2011 · fix by Oct 31, 2011 overdue · Violation #9141808
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 5, 2011 · fix by Oct 31, 2011 overdue · Violation #9141813
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 5, 2011 · fix by Oct 31, 2011 overdue · Violation #9141812
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 5, 2011 · fix by Oct 31, 2011 overdue · Violation #9141811
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 5, 2011 · fix by Oct 31, 2011 overdue · Violation #9141810
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued May 6, 2009 · fix by Jun 1, 2009 overdue · Violation #7857164
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Apr 30, 2009 · fix by Jun 4, 2009 overdue · Violation #7845228
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.